City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP3427
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT B/C
SLUDGE PROCESSING IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3427
I. Scope of Services:
Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following:
• Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors.
• Installation of Access Hardware for Operation/Maintenance of Digestors.
• Construction of New Blower Building for Process Equipment.
• Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion.
• Construction of New Motor Control Center.
• Reconstruction of Existing Sludge Pump Station.
• Construction of New Sludge Processing Building.
• Installation of Screw Presses for Solids Processing.
• Installation of Dewatering Polymer Feed System.
• Installation of Conveyance System for Solids Handling/Disposal.
• Interconnections to Owner’s SCADA for Control/Monitoring.
• Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
| 12/16/2025 08:45 PM UTC |
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project No. CP3176, LEI Project No. 13-023
Capital Project No. CP3176
LEI Project No. 13-023
East McNeese Utility Extension
City of Lake Charles, LA ~
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
This project generally consists of extending the existing 16″ PVC water line and 24″ PVC gravity waste water line on East McNeese Street to the east approximately 2,143 linear feet and 1,836 linear feet respectively.
The project will include the following items of work:
1. Clearing and grubbing;
2. Construction of a new water line and gravity waste water lines and appurtenances;
3. Removal and construction of permanent fencing;
4. Site grading and hydroseeding;
5. Pressure and leak testing of new waste water facilities and water lines and disinfection and Health Department water testing of the new water line.
| 05/06/2014 07:45 PM UTC |
|
Capital Project No. CP3124
Capital Project No. CP3124
Central School Arts & Humanities 3rd Floor Flooring
City of Lake Charles, LA ~
• Installation of plywood sub floor, wood finish floor and shoe mouldings on the third floor as well as replacement of stair treads and nosing at stairs indicated on plan.
• Trimming all doors as required.
• Installing carpet at entrance of theater Balcony.
• Replacing seats and backs on existing Theater chairs where indicated. Removing existing Theater chairs and installing new Theater chairs where indicated.
| 03/18/2014 07:45 PM UTC |
|
Project No. 2013-622, CP No. 2894
Project No. 2013-622, Capital Project No. 2894
PIPE BURSTING – 9TH STREET FROM 2ND AVENUE TO 4TH AVENUE; 5TH STREET FROM 2ND AVENUE TO 3RD AVENUE;
VARNEY CIRCLE FROM I-210 EAST TO BUNKER ROAD;
AND ILLINOIS STREET FROM LOUISIANA AVENUE, EAST
CITY OF LAKE CHARLES, LOUISIANA
SCOPE OF WORK
The general scope of work for Project No. 2013-622 includes pipe bursting the existing 8” or 15” sewer lines and reconnecting the existing sewer services, installation of new precast concrete manholes, and installation of protective manhole interior liners. The sewer main North of Varney Circle shall be up-sized to 16 inches.
| 03/18/2014 07:45 PM UTC |
|
Capital Project No. CP3089
Capital Project No. CP3089
New Transit Bus Wash
City of Lake Charles, LA ~
The project is to provide a 2,270 square foot facility to house a new automated bus wash system. The building will be a metal building with concrete block infill. The project will be complete with concrete drives, a guard shack and controlled automated access. The facility will be located on a fenced, city owned property on Goodman Road.
| 03/03/2014 08:45 PM UTC |
|
Capital Project No. CP3165, LEI Project No. 13-008
CITY OF LAKE CHARLES
2013 ASPHALT OVERLAY OF VARIOUS STREETS
CITY OF LAKE CHARLES CAPITAL PROJECT NO. CP3165
LEI PROJECT NO. 13-008
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of pavement widening, pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles:
1. See Street (North Booker Street to Sallie Mae Street)
2. Poplar Street (North Booker Street to Sallie Mae Street)
3. Katherine Street (North Booker Street to North Lincoln Street)
4. Beam Street (Mill Street to Dead End)
5. 3rd Street (Highway 14 to McNabb Street)
6. 7th Avenue (2nd Street to Dead End)
7. Shellbeach Drive (Lake Street to Bridge West of Wilson Street)
8. West Walton Street (Illinois Street to South Walton Street)
9. Briarfield Street (Illinois Street to Dead End)
10. South Walton Street (West Walton Street to East Walton Street)
11. East Walton Street (Illinois Street to South Walton Street)
12. Fourden Lane (Illinois Street to South Walton Street)
13. Brentwood Street (Illinois Street to Dead End)
14. Greenfield Circle (Full Length)
15. West Autumnwood Lane (Full Length)
16. Autumnwood Lane (West Autumnwood Lane to McNeese Street)
17. Springwood Lane (Autumnwood Lane to Dead End)
18. Stillwood Lane (Springwood Lane to McNeese Street)
19. Christina Drive (McNeese Street to Dead End)
20. Happy Lane (Riverside Drive to Dead End)
| 02/18/2014 08:45 PM UTC |
|
Project No. 2013-624, Capital Project No. 3183
Project No. 2013-624
Capital Project No. CP3183
Water Line Extension-Burton Lane from Prien Lake Road to Francis Drive and Francis Drive from Burton Lane East to Dead End
City of Lake Charles, LA ~
The general scope of work is the installation of a 12 inch HDPE water line by directional drill along the West side of Burton Lane from West Prien Lake Road, South to Francis Drive, and an 8 inch HDPE water line by directional drill along the South side of Francis Drive, East approximately 860 feet.
| 01/14/2014 08:45 PM UTC |
|
Project No. 2013-620, Captial Project No. 3159
Project No. 2013-620
Capital Project No. 3159
CIPP Lining of 30” Sewer Main Under I-10
From Intersection of Belden and Franklin
To Intersection of Church and Franklin
City of Lake Charles, Louisiana ~
The general scope of work includes CIPP lining of 30” sewer main under I-10 from intersection of Belden and Franklin to the intersection of Church and Franklin, and includes the installation of a cured-in-place pipe (CIPP) lining system, manhole installation, including protective liners, and removal and replacement of reinforced concrete street pavement.
| 11/19/2013 08:45 PM UTC |
|
MA Project No. A9-13002-DA
MA Project No. A9-13002-DA
Graymarket Drive Sanitary Sewer Extension
City of Lake Charles, LA ~
The project scope includes the new construction of 1,700 LF of 8” and 10” diameter gravity sanitary sewer main. The proposed main includes but is not limited to 11 sanitary sewer manholes, 200 LF of jacking and boring and 14 sanitary sewer service assemblies.
| 11/05/2013 08:45 PM UTC |
|
Project No. 2013-618, Capital Project No. 3151
Project No. 2013-618 (CP #3151)
Drainage and Asphalt Overlay Improvements
Vito Street - Prater to Albert Street
Carr Street – Vito to Evans Street
Prater Street – Vito to Evans Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2013-618 includes:
• Improvements to roadside ditches,
• Patches of full depth asphalt repair;
• and overlay of the existing asphalt surface
| 11/05/2013 08:45 PM UTC |
|
Project No. 3128, LDEQ SRF Project No. CS221215-01
Project No. CP3128
LDEQ SRF Project No. CS221215-01
Plant B/C Pump Station
City of Lake Charles, LA ~
The scope of work for the project is the construction of a new Plant B/C Pump Station for pumping of raw sewage which shall consist of, but is not limited to:
• Site Excavation and Borrow Structural Fills
• Construction of Reinforced Concrete Pump Station Wetwell
• Furnish and Install Gravity Sewers and Manholes
• Furnish and Install Sewer Force Mains
• Furnish and Install Mechanical Bar Screen System with Screenings Washer Conveyor rated for
• Furnish and Installation of two (2) – 100 Hp Vertical Turbine Solids Handling Pumps each rated for 3,500 GPM
• Furnish and Installation of four (4) 300 Hp Vertical Turbines Solids Handling Pumps each rated for 7,000 GPM
• Furnish and Install Mechanical Piping and Valve Systems
• Furnish and Install Electrical Lighting, MCC Switchgear, Process Equipment Controls, and Pump Control Systems
• Furnish and Install Painting and Protective Coatings Systems
• Installation of Site Drainage, Driveways, Paving, and Turfing
| 10/15/2013 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.