General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
01/16/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
22-21-1
S Caleb Dr Repair--------------------------------------------------------------------------Contractor must provide all labor, materials, tools, and equipment to repair a pipe, reseal a catch basin and remove/replace mountable curb located at 562 & 571 S. Caleb Dr. (R08N100; S37-T9-R15) in Slidell, Louisiana 70461 in accordance with the specifications.
06/01/2022 07:00 PM UTC
22-16-1
Kay Drive Repair ---------------------------------------------------------- Contractor must provide all labor, supplies, equipment, tools, permits and materials to repair the roadway as specified near 60210 Kay Drive (R09C001; S-34-T9-R14) in Lacombe, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be twenty (20) calendar days from issuance of the NTP by the Parish.
05/24/2022 07:00 PM UTC
22-17-1
Pawns Lane Repair ----- Contractor must provide all labor, materials, tools, and equipment to repair the sidewalk on Pawns Lane (R08I066; S26-T8-R14) located in Slidell, Louisiana as specified. The time period of completion is 30 days from Notice to Proceed issued by the Parish. A Quote Guarantee is not required for this project. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
05/18/2022 07:00 PM UTC
22-17-2
2022 District Panel Replacements ........................................................................................................................ The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing and replacing concrete road panels and/or rollover curbs as specified along the following Parish roads
05/05/2022 07:00 PM UTC
22-16-1
Kay Drive Repair ---------------------------------------------------------- Contractor must provide all labor, supplies, equipment, tools, permits and materials to repair the roadway as specified near 60210 Kay Drive (R09C001; S-34-T9-R14) in Lacombe, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be twenty (20) calendar days from issuance of the NTP by the Parish.
05/05/2022 07:00 PM UTC
22-15-1
Victorian Lane Drainage ............................................................................................ The Parish requires a Contractor to remove and replace drain pipe, install catch basin and slab sodding located near the pond on Victorian Lane (R04D193; S39-T7-R11) in Mandeville, Louisiana.
05/04/2022 07:00 PM UTC
22-18-2
Bell Park Rd / Hazel Dr Improvements .............................................................................................................................. The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by raising roadway and improving intersection road surfaces along Hazel Dr (R04E228) Section 55 Township 8S Range 11E Mandeville; and Bell Park Rd (R07G025) Section 46 Township 9S Range 13E Lacombe.
05/04/2022 07:00 PM UTC
22-14-2
2022 District 7, 9 Road Improvements ...................................................................................................................... The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying to improve road surfaces as specified for the following roads: America St. (R04E031) Section 38 Township 8S Range 11E Mandeville; Barringer Rd. (R07F002) Section 1 Township 9S Range 12E Lacombe; Cane Bayou Ln (R04E109) Section 48 Township 8S Range 12E Mandeville; Caroline St. (R04E034) Section 38 Township 8S Range 11E; Lacombe Harbor Rd. (R07H028) Section 39 Township 8S Range 13E Lacombe; Lake Rd. (R07F003) Section 1 Township 9S Range 12E Lacombe; Main St. (R07G015) Section 37 Township 8S Range 13E Lacombe; Mandane Dr .(R07F007) Section 1 Township 9S Range 12E Lacombe; McDonald St. (R04E145) Section 38 Township 8S Range 11E Mandeville; N 16th St. (R07E024) Section 40 Township 8S Range 12E Lacombe; Ordogne-Ruppert Rd (R07E072) Section 14 Township 8S Range 12E Lacombe; Palmer Dr. (R07G041) Section 46 Township 9S Range 13E Lacombe; Rapatel St. (R04E325) Section 44 Township 8S Range 12E Mandeville; S 8th St (R07G006) Section 40 Township 8S Range 12E Lacombe; Transmitter Rd (R07I011) Section 33 Township 8S Range 13E Lacombe; Walnut St. (R04F057) Section 8 Township 7S Range 12E Mandeville; Cypress Dr. (R08F003) Section 29 Township 8S Range 15E Slidell; Durham Dr. (R08N028) Section 38 Township 9S Range 15E Slidell; Flair Dr. (R08L075) Section 38 Township 9S Range 15E Slidell; Forest Cir (R08E045) Section 29 Township 8S Range 15E Slidell; Greenery Cir (R08E046) Section 29 Township 8S Range 15E Slidell; Herwig Rd. (R08N021) Section 38 Township 9S Range 15E Slidell; Leaf Cir (R08E145) Section 29 Township 8S Range 15E Slidell; Norfolk Ct (R08N029) Section 38 Township 9S Range 15E Slidell; Radio Rd. (R08A026) Section 11 Township 8S Range 14E Pearl River; Rustic Cir (R08E146) Section 29 Township 8S Range 15E Slidell; and S Buckingham Dr. (R08N081) Section 38 Township 9S Range 15E Slidell.
04/27/2022 07:00 PM UTC
22-15-2
Three Rivers Rd Drainage ............................................................................................................................ The Contractor must provide all labor, equipment, and tools necessary for the installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications. The time period for completion of work is forty-five (45) days from issuance of Notice to Proceed by the Parish.
04/27/2022 07:00 PM UTC
22-9-1
Water Oak Drainage .............................................................................................................................. Contractor must provide all labor, materials, tools, and equipment to repair the drainage located between 2116 and 2120 Water Oak Dr (R08M084; S12-T9-R14) located in Slidell, Louisiana as specified. The time period of completion is 30 days from Notice to Proceed issued by the Parish. A Quote guarantee is not required for this project. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
04/26/2022 07:00 PM UTC
281 - 290 of 833 Solicitations
1 2 25 26 27 29 31 32 33 83 84