General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
06/24/2026 07:00 PM UTC
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
23-3-2
Cross Gates Water System - New Elevated Storage Tanks------New elevated steel water storage tanks, controls, piping, site grading and drainage, electrical service, equipment, utility lines and other related items at the Willow Wood and Ozone Pines sites.
10/18/2023 07:00 PM UTC
23-38-2
2023 West District Panel Replacements-------------------------------------------------The Parish requires a Contractor to provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs along various Parish Roads.
10/17/2023 07:00 PM UTC
23-38-1
Desoto Dr Drainage--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to increase area drainage by installing/replacing/repairing drain pipe and catch basins as specified along Desoto St (R04D173) Section 34, Township 7S, Range 11E; located in Mandeville, Louisiana. The time period for completion of the project is thirty (30) calendar days. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
10/12/2023 07:00 PM UTC
23-36-2
Lonesome Rd., Lonesome Rd. Drainage----------------------------------------------- The Contractor shall provide all labor, equipment, materials, and tools necessary for milling and overlaying asphaltic concrete roadways, roadway striping, and drainage improvements as specified along Lonesome Rd. (R04D032) Section 40 Township 8S Range 11E.
10/11/2023 07:00 PM UTC
23-35-2
Pearl River Diversion Canal Restoration------------------------------------------------The work for this project comprises the dredging of the Pearl River Diversion Canal beginning at the intersection with the W. Pearl River and heading upstream within the canal approximately 1,500 feet.
10/11/2023 07:00 PM UTC
23-37-1
Rue Piper Drainage - The Parish requires a Contractor to install catch basins, pipe and rip rap to fix erosion issues at Rue Piper (R08M041; S7-T9-R15) in Slidell, Louisiana.
10/05/2023 07:00 PM UTC
23-39-1
Paradise Court Drainage Repair-----------------------------------------------------------The Parish requires a Contractor to remove/replace culverts that are failing, rotten and causing sinkholes, as well as concrete driveways, to improve drainage located at 216 Paradise Court (R04D154; S27-T7-R11) in Mandeville, Louisiana.
10/04/2023 07:00 PM UTC
23-40-1
Houmas Ct. Drainage---------------------------------------------------------------------The Parish requires a Contractor to remove/replace side drain pipe and remove/replace concrete driveway to improve drainage at 108 Houmas Court (R08E020; S19-T8-R15) in Pearl River, Louisiana 70452
10/04/2023 07:00 PM UTC
23-30-2
Safe Haven Entrance Improvements----------The work of this contract comprises the removal of the existing concrete pavement entrance and replacement with pervious pavement and underdrain system, replacement of driveway culvert, installation of new monument signs/lighting, installation of new landscaping/irrigation and bioswale and restoration of existing brick wall fencing.
10/03/2023 07:00 PM UTC
23-34-2
53 Bleu Lake Drive, Birch Drive, and Pine Drive Drainage----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve remove, and replace existing cross drain pipes, headwalls, and roadway asphalt along 53 Bleu Lake Drive located in Covington, LA (R02V006) Section 10 Township 5S Range 11E; Birch Drive located in Folsom, LA (R02K026) Section 21 Township 5S Range 10E; and Pine Drive located in Folsom, LA (R02K018) Section 22 Township 5S Range 10E. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is ninety (90) calendar days from the issuance of the Notice to Proceed (NTP) by the Parish
10/03/2023 07:00 PM UTC
311 - 320 of 979 Solicitations
1 2 28 29 30 32 34 35 36 97 98