General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
23-39-2
Berry Todd Rd Bridge - The Contractor must provide all labor, equipment, materials, and tools necessary for the removal of concrete approach slabs and guard rail and installation of concrete approach slabs, and guard rail, as required per the construction drawings and specifications. The project location is Berry Todd Rd, Sections 43 and 39, Township 8, Range 13E in Lacombe, LA.
10/25/2023 07:00 PM UTC
23-42-1
Riverside Drive Drainage Repair ------ Contractor must provide all labor, materials, tools, supervision, and equipment to install sub-surface drainage with catch basins in order to prevent erosion in the roadside ditches at 71368 Riverside Drive (R03B002; S42-T7-R11) located in Covington, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be twenty (20) calendar days from Notice to Proceed issued by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
10/25/2023 07:00 PM UTC
23-37-2
2023 East District Panel Replacements--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as specified along the following roads: -Ellwood Cir (R08I062) Section 25 Township 8S Range 14E Slidell; -Dockside Dr (R08F031) Section 38 Township 8S Range 15E Slidell; -Cedarwood Dr (R08M067) Section 38 Township 9S Range 15E Slidell; -Clipper Dr (R09J018) Section 44 Township 9S Range 14E Slidell; -Meadow Lake Dr East (R08M075) Section 12 Township 9S Range 14E Slidell; -Foxcroft St (R08V019) Section 13 Township 9S Range 14E Slidell.
10/24/2023 07:00 PM UTC
23-41-1
Installation of Fuel Tanks and Removal of the Existing Fuel Tanks at Department of Public Works Facilities--------To supply all equipment, materials, and labor to place two (2) five thousand (5,000) gallon above ground fuel tanks at each location with all required equipment to supply diesel fuel and unleaded gasoline for governmental equipment usage and remove one 500-gallon above ground gasoline and one 1000-gallon diesel storage tanks from each location.
10/24/2023 07:00 PM UTC
23-43-1
Lake Tahoe Panel and Catch Basin Repair--------------------------------------------------The Parish requires a Contractor to remove/replace road panels, clean and seal pipe joints, and catch basins, located at Lake Tahoe (R08L048; S31-T8-R15) in Slidell, Louisiana.
10/19/2023 07:00 PM UTC
23-3-2
Cross Gates Water System - New Elevated Storage Tanks------New elevated steel water storage tanks, controls, piping, site grading and drainage, electrical service, equipment, utility lines and other related items at the Willow Wood and Ozone Pines sites.
10/18/2023 07:00 PM UTC
23-38-2
2023 West District Panel Replacements-------------------------------------------------The Parish requires a Contractor to provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs along various Parish Roads.
10/17/2023 07:00 PM UTC
23-38-1
Desoto Dr Drainage--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to increase area drainage by installing/replacing/repairing drain pipe and catch basins as specified along Desoto St (R04D173) Section 34, Township 7S, Range 11E; located in Mandeville, Louisiana. The time period for completion of the project is thirty (30) calendar days. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
10/12/2023 07:00 PM UTC
23-36-2
Lonesome Rd., Lonesome Rd. Drainage----------------------------------------------- The Contractor shall provide all labor, equipment, materials, and tools necessary for milling and overlaying asphaltic concrete roadways, roadway striping, and drainage improvements as specified along Lonesome Rd. (R04D032) Section 40 Township 8S Range 11E.
10/11/2023 07:00 PM UTC
23-35-2
Pearl River Diversion Canal Restoration------------------------------------------------The work for this project comprises the dredging of the Pearl River Diversion Canal beginning at the intersection with the W. Pearl River and heading upstream within the canal approximately 1,500 feet.
10/11/2023 07:00 PM UTC
241 - 250 of 914 Solicitations
1 2 21 22 23 25 27 28 29 91 92