General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-16-2
Rosedown Way Drainage Phase 2-------------- The Contractor shall provide all labor, equipment, tools, testing, and materials necessary to complete drainage improvements in accordance with the construction plans and specifications for the Rosedown Subdivision, located in Mandeville, Louisiana, 70471. The work includes replacement of existing drainage infrastructure along Camden Court, construction of a new concrete-lined channel to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all incidental work, such as replacement of concrete street panels, sidewalks, and driveways, utility relocations, installation of sewer and water conflict boxes, and placement of rip rap at the outfall.
03/31/2026 07:00 PM UTC
26-8-1
123 Kelly Dr. & 222 S. Queens Dr. Drainage---------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials, for cleaning and sealing pipe joints and catch basins, removing and replacing panels, and rebuilding CB-06 to improve drainage as specified along Kelly Dr (R081005) and S Queens Dr (R081072) located in Slidell, Louisiana.
03/31/2026 07:00 PM UTC
26-7-1
Cody Ln Drainage---------------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary for the removal and replacement of existing structures to restore proper drainage, including installing or replacing drain pipes, cleaning existing ditches, driveways, and turnouts, and completing miscellaneous related work and sod restoration as specified along Cody Ln (R020028); located in Covington, Louisiana.
03/31/2026 07:00 PM UTC
26-17-2
Slemmer Rd Drainage Ph 2--------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing, replacing, and/or repairing drainpipes, catch basins, driveways, and sod as specified along Slemmer Rd (R03L006), located in Covington, LA.
04/01/2026 07:00 PM UTC
26-9-1
Paradise CT Drainage------------------------------ The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by repairing sinkholes and eroded pipes as specified along Paradise Ct (R04D154), Covington, Louisiana.
04/01/2026 07:00 PM UTC
26-13-2
Justice Center Boilers--------------------------Base Bid to include the removal of (2) existing hot water heating boilers with (1) new boiler to be replaced in a configuration similar to existing. Piping for the second boiler shall be stubbed out and capped for future replacement. A rental boiler shall be included to maintain building heating during the project. A new opening and roll door in the boiler room wall to be installed to accommodate boiler removal and installation as well as future service. The door to the loading dock area will be replaced with a pair of 3'-0" x 8'-0" hollow metal doors and hardware to accommodate boiler replacement.
04/08/2026 07:00 PM UTC
26-18-2
2026 District 7 Road Improvements------------- The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying road surfaces along various District 7 Parish roads.
04/14/2026 07:00 PM UTC
26-19-2
2026 District 2, 3 Road Improvements---------- The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying, patching, and reconstructing road surfaces as specified along various District 2 and District 3 Parish roads.
04/14/2026 07:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
24-12-1
The Meadows Subdivision Panel Repairs------------------------------------------The Parish requests a contractor to remove and replace existing concrete road panels and cross pipe located in The Meadows Subdivision at Rose Meadow Loop (R09A031) Section 30 Township 8S Range 14E;and Rose Meadow Ct (R09A044) Section 30 Township 8S Range 14E in Slidell, Louisiana.
03/26/2024 07:00 PM UTC
24-13-1
Indian Point Dr Drainage---------------------------------------------------------------The Parish requests a contractor to improve drainage by removing and replacing cross culvert, road panels and headwalls around the existing drainage pipes, located at Indian Point Dr. (R0A046) Section 54 Township 7S Range 11E ; in Madisonville, Louisiana.
03/26/2024 07:00 PM UTC
23-46-2
Safe Haven Campus Improvements------The work of this contract comprises the removal and replacement of existing subsurface drainage infrastructure, construction of new detention pond, construction of new bioswale/rain garden area, removal and replacement of gravity sewer infrastructure, construction of new concrete walkways (Alternate No. 1) and wayfinding signage, and construction of new pavilions (Alternate No. 3) and nature trails (Alternate No. 2).
03/21/2024 07:00 PM UTC
24-6-1
Lake Sardis Dr. Drainage--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove/replace driveway, clean, and seal pipe joints, along Lake Sardis Dr (R08L049) Section 31 Township 8S Range 15E located in Slidell, Louisiana. The time period for completion of the project is thirty (30) calendar days. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
03/20/2024 07:00 PM UTC
23-40-2
Bedico Faubourg Water Main Fox Branch----The WORK comprises the construction of approximately 4,880 linear feet of water main interconnecting two existing water systems. The new water main will consist of open-cut 12” PVC pipe and directionally drilled 14” HDPE. No water service interruption will be allowed except for tie-ins, as directed by the Department of Utilities (DU). The new water main will be constructed using a combination of open cut and trench less construction.
03/20/2024 07:00 PM UTC
24-2-1
Utilities Grass Cutting Services--------------------------------------------------The purpose of this Quote Request is to obtain proposals from qualified Proposers who are interested in providing grass cutting services for the St. Tammany Parish, Department of Utilities(DU).
03/05/2024 08:00 PM UTC
24-2-2
Rousseau Rd Bridge Rehabilitation-------------------------------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the installation of a manufactured steel beam/frame.
02/29/2024 08:00 PM UTC
24-4-1
Covington Library Exterior Renovations - Contractor must provide all labor, materials, tools, equipment, and permits for the exterior renovations for the St. Tammany Parish Library, Covington Branch located at 312 West 21st Avenue, Covington, Louisiana 70433 in accordance with plans and specifications. The scope includes new landscaping around the building, demolition and addition of sidewalks, subsurface drainage, removing old fence posts, and repairs to the concrete parking lot.
02/22/2024 08:00 PM UTC
24-5-1
Trace Maintenance Barn - Contractor will remove old ceiling tile, grid, electrical lighting, ceiling and wooden mezzanine flooring. Contractor will replace with new structurally sound lumber to correct sagging ceiling and reinstall lighting fixtures, ceiling grid and ceiling tile. Contractor will remove and dispose of all construction/demo debris.
02/22/2024 08:00 PM UTC
24-1-2
Safe Haven Water Utility Improvements------The work to be performed under this contract consists of furnishing and delivering all labor, materials, supervision, construction equipment, mechanical and electrical equipment not furnished by the St. Tammany Parish Department of Utilities, travel utilities, transportation, supplies, tools and services necessary for performing all work as specified in the Contract Documents, plus whatever work may be added as extra work under the provisions stated elsewhere in these documents.
02/15/2024 08:00 PM UTC
241 - 250 of 950 Solicitations
1 2 21 22 23 25 27 28 29 94 95