General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-37-2
Joiner-Wymer Rd------------------------------------ The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified along Joiner-Wymer Rd (R01G003) Covington, LA.
08/11/2026 07:00 PM UTC
26-25-1
Autumn Wind Ln Drainage-----------------The Parish requests a Contractor to improve drainage by removing and replacing drainpipe and cleaning, shaping, and grading ditches along Autumn Wind Ln, located in Mandeville, LA as required in the specifications.
08/11/2026 07:00 PM UTC
26-26-1
Lake Superior Dr Drainage Repair-----------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by cleaning, repairing, and resealing existing pipe joints in the existing subsurface as specified along Lake Superior Dr (R08L047) located in Slidell, Louisiana.
08/11/2026 07:00 PM UTC
26-27-1
Arthur Rd Drainage-----------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by cleaning, shaping, and grading existing ditches. As well as installing driveway drain pipes and adding catch basins as specified along Arthur Rd (R03K034) located in Covington, Louisiana.
08/20/2026 07:00 PM UTC
26-28-1
Kelly Dr Drainage----------------------------The Parish requires a contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by construction structural walls and placing material to the eroded slopes to reduce further erosion and improve stability as specified along Kelly Dr (R081005) Slidell, Louisiana.
08/20/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
24-1-2
Safe Haven Water Utility Improvements------The work to be performed under this contract consists of furnishing and delivering all labor, materials, supervision, construction equipment, mechanical and electrical equipment not furnished by the St. Tammany Parish Department of Utilities, travel utilities, transportation, supplies, tools and services necessary for performing all work as specified in the Contract Documents, plus whatever work may be added as extra work under the provisions stated elsewhere in these documents.
02/15/2024 08:00 PM UTC
23-56-2
Bigner Rd Turn Lane------The work specified in this project will require the contractor to provide labor, equipment, and material necessary to improve the roadway surface by milling and overlaying approximately 300 feet of asphaltic concrete and installing roadway striping. The intersection of Bigner Rd and State Highway 22 will undergo widening for the addition of a right-hand turn lane, as well as the movement of drainage on the east side of the widened road, as specified along Bigner Rd (R04C017) Section 54 Township 7 Range 11E.
02/08/2024 08:00 PM UTC
24-1-1
Biosolids Transport and Disposal---------------------------------------------------------The Department of Utilities (DU) is solicitating quotes from those who are interested in providing Biosolids Transport and Disposal services including but not limited to; providing roll-off containers, transportation and disposal of non-hazardous biosolids generated from the Parish’s Wastewater Treatment Plant (WWTP) facilities .
02/07/2024 08:00 PM UTC
23-54-2
2023 District 12, 13, 14 Supplemental------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying and patching road surfaces as specified along the following Parish roads: * Garden Dr (R09G051) Section 38 Township 9S Range 14E Slidell; * Jefferson Ave (R09G015) Section 38 Township 9S Range 14E Slidell; * Middle Pearl Dr (R08P010) Section 15 Township 9S Range 15E Slidell; * Possum Hollow Rd (R08U001) Section 11 Township 9S Range 14E Slidell; * Dr. TJ Smith Senior Mem Pkwy (R09I168) Section 30 Township 8S Range 14E Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
01/25/2024 08:00 PM UTC
23-53-2
2023 District 7,9 Supplemental------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along the following Parish roads: * Montmartre St (R04E138) Section 38 Township 8S Range 12E Mandeville; * N 14th St (R07E080) Section 40 Township 8S Range 12E Lacombe; * Nehl St (R07E017) Section 48 Township 8S Range 12E Lacombe; * Oscar St (R04E066) Section 32 Township 7S Range 12E Mandeville; * Paradise Ln (R04E211) Section 48 Township 8S Range 12E Lacombe; * S 12th St (R07G003) Section 40 Township 8S Range 12E Lacombe; * Henry Rd (R08H024) Section 13 Township 8S Range 14E Slidell; * Poplar Dr (R08F022) Section 30 Township 8S Range 15E Slidell.
01/25/2024 08:00 PM UTC
23-55-2
2023 District 2,3 Supplemental-------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces along various District 2 & 3 roads.
01/25/2024 08:00 PM UTC
23-41-2
Pearl River Diversion Canal Restoration--------------------------------------------------The work of this project comprises the dredging of the Pearl River Diversion Canal beginning at the intersection with the W. Pearl River and heading upstream within the canal approximately 1,500 feet. The excavated material will be disposed on site per the plans and a concrete armoring mat system with the necessary embankment work will be installed per the drawings.
01/09/2024 08:00 PM UTC
23-50-2
Cross Gates Water System Well Improvements----New water well, electrical service, and various related items at the Ozone Pines site. Well improvements, utility lines, and related items at the Willow Wood site.
01/09/2024 08:00 PM UTC
23-44-2
Lower W-15 Area Drainage Improvements Phase III – Diversion -----The project includes excavation of earthen materials and associated clearing activities for the construction of a diversion canal between the existing W-15 (French Branch) Canal and the Reine Canal. W-15 Diversion Canal in Slidell between the W-15 Canal and connecting to the Reine Canal. Approximate coordinates for the project are 30°17’35”N and 89°44’32”W.
12/14/2023 08:00 PM UTC
23-49-2
2023 District 1,4,5,10 Supplemental------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying road surfaces as specified along the following Parish roads: - Katie Ct (R01I044) Section 17 Township 7S Range 10E Madisonville; - Mack Ln (R01I042) Section 17 Township 7S Range 10E Madisonville; - Pine Ave (R01I017) Section 18 Township 7S Range 10E Madisonville; - Place St Claude (R01E034) Section 47 Township 7S Range 11E Covington; - Raiford Oaks Blvd (R01I045) Section 17 Township 7S Range 10E Madisonville; - Whispering Ln (R01I016) Section 18 Township 7S Range 10E Madisonville; - Autumn Creek Dr (R01J083) Section 21 Township 8S Range 10E Madisonville; - Fairfield Oaks Dr (R01J057) Section 15 Township 7S Range 10E Madisonville; - Timberwood Ct (R01M012) Section 17 Township 7S Range 10E Madisonville; - Robinwood Ln (R03B005) Section 42 Township 7S Range 11E Covington; - Forest Dr (R04D037) Section 42 Township 8S Range 11E Mandeville.
12/12/2023 08:00 PM UTC
291 - 300 of 991 Solicitations
1 2 26 27 28 30 32 33 34 99 100