St. Tammany Parish Government
        PO Box 628, Covington, LA 70434-0628
        (985) 898-2520
      
        PO Box 628, Covington, LA 70434-0628
        (985) 898-2520
      
| Name * | Description | |
|---|---|---|
| Number | Deadline | 
|---|---|
| 
            25-55-1
 Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana. 
 |           11/05/2025 08:00 PM UTC | 
| 
            25-31-2
 Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E. 
 |           11/12/2025 08:00 PM UTC | 
| 
            25-56-1
 59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads:
- Cours Carson St, Mandeville, LA;
- Debellvue Pl, Mandeville, LA;
- Joans St, Mandeville, LA;
-Kramer Ct, Mandeville, LA;
-Pecan Pass, Mandeville, LA; and
- Rosedown Way, Mandeville, LA. 
 |           11/13/2025 08:00 PM UTC | 
| 
            25-33-2
 Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of
subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E. 
 |           11/18/2025 08:00 PM UTC | 
| 
            25-32-2
 Oak Park Drainage Improvements - Phase I -------------------------	The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.  
 |           11/20/2025 08:00 PM UTC | 
| 
            25-57-1
 Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex. 
 |           11/20/2025 08:00 PM UTC | 
| Number | Deadline | 
|---|---|
| 
            23-13-1
 Emergency Electrical Service---------------------------------------Provider will provide electrical services during an emergency event at Parish Facilities throughout the Parish. This is a standby contract; service will be on an “as needed” basis. 
 |           04/12/2023 07:00 PM UTC | 
| 
            23-19-2
 Caroline Ct, Louis Prima Dr, Park Place Dr, Falconer Dr------The Contractor shall provide all labor, equipment, and material necessary to improve the roadway surface by milling and overlaying 4,500 total feet with asphaltic concrete and installing new striping. Caroline Ct, Louis Prima Dr, and Park Place will undergo a drainage exploration to assess the state of the drainage structures, repair disconnected joints, and leaking catch basins, as specificed along Caroline Ct (R03L142), Louis Prima Dr (R03L143), Falconer Dr (R03L161), and Park Place (R03L171) IN Section 15 Township 7S Range 11E. 
 |           04/11/2023 07:00 PM UTC | 
| 
            23-11-2
 2023 District 6,11 Road Improvements - The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying, and patching road surfaces as specified along John Provost Rd (R06F010) Section 39 Township 7S Range 14E Pearl River ; Lee Rd (R02W005) Section 27 Township 5S Range 11E Covington ; Lenel Rd (R10C007) Section 17 Township 6S Range 12E ; Lowe Davis Rd (R10C004) Section 15 Township 6S Range 12E Covington ; Loyd Rd (R02P018) Section 16 Township 5S Range 11E Covington ; Pete Richardson Rd (R06A011) Section 10 Township 6S Range 13E Bush ; Watts Rd (R05E023) Section 28 Township 5S Range 13E Bush ; Camp Villere Rd (R09D012) Section 37 Township 9S Range 14E Slidell ; Charles Anderson Rd (R06G014) Section 27 Township 7S Range 14E Pearl River ; Kay Dr (R09C001) Section 34 Township 8S Range 14E Lacombe ; P Kennedy Rd (R06G016) Section 27 Township 7S Range 14E Pearl River ; Sticker Bay Rd (R06M003) Section 28 Township 7S Range 13E Lacombe ; Torres Dr West of Spruce (R07C043) Section 34 Township 8S Range 13E Lacombe ; Torres Dr East of Spruce (R09C003) Section 34 Township 8S Range 14E Lacombe. 
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
 
 |           04/11/2023 07:00 PM UTC | 
| 
            23-18-2
 Penn Mill Road - Horse Branch - The Contractor shall provide all labor, equipment, and material necessary to improve the roadway surface by milling and overlaying 18,000 feet of asphaltic concrete and installing roadway striping. The intersection of Penn Mill Rd and State Highway 190 will undergo widening for the addition of a right-hand turn lane, as well as the addition of subsurface drainage on both sides of the widened road, as specified along Penn Mill Rd (R03D007) Section 23-25, 30 Township 6S Range 10E – 11E and Horse Branch Rd (R03D011) in Section 13-14, 23 Township 6S Range 10E. 
 |           04/05/2023 07:00 PM UTC | 
| 
            23-12-1
 Council Office Renovations - Building A------The Parish requires a Contractor to provide all labor, materials and equipment to remove and replace carpet, interior repainting, and vinyl floor removal and replacement as specified in the areas located at Building A Council Office and Conference Room 21490 Koop Drive, Mandeville, LA 70471.   
 |           04/05/2023 07:00 PM UTC | 
| 
            23-4-1
 Safe Haven Gutters - Quads A, B, C & G ------------ Contractor must provide all labor, equipment, tools and materials necessary to perform the required work on gutters on Quads A, B, C and G at the Safe Haven Campus located at 23363 Robin Road, Mandeville, LA 70470.
Contractor is to evaluate a section of existing aluminum gutters that have already been installed on a Quad A Building.
Contract is to provide a cost estimate to remove any existing copper gutters on Quads A, B, C and G buildings and install new aluminum gutters on Quads A, B, C and G buildings that are the same or nearly match existing installed aluminum gutters in color and material.  
A site visit is required and a representative will provide access to existing gutter to evaluate all roof areas of Quads A, B, C and G.   
 |           04/05/2023 07:00 PM UTC | 
| 
            23-7-1
 Ashton Oaks Drainage Repair------The Parish requires a Contractor to remove and replace concrete panels and concrete driveway, reseal catch basin and sodding located at 476 East Redbud Dr (R08I080; S26-T8-R14); 300 Ironwood Dr (R08I082; S26-T8-R14); 508 JP Court (R08I092; S26-T8-R11)
in Slidell, Louisiana. 
 |           04/04/2023 07:00 PM UTC | 
| 
            23-14-2
 2023 District 1,4,5,10 Road Improvements-----------------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces, and improving the turning radius as required in the specifications along District 1,4,5, & 10 Parish roads. 
 |           04/04/2023 07:00 PM UTC | 
| 
            23-15-2
 2023 District 12,13,14 Road Improvements------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as required in the specifications along District 12,13 & 14 Parish roads. 
 |           04/04/2023 07:00 PM UTC | 
| 
            23-6-1
 South Slidell Library Roof ------ Removal of existing roof and installation of new roof insulation and modified bitumen membrane roofing system.
Contractor must provide all labor, materials, tools, equipment, and permits for removal of existing roof and installation of approximately 6,500 sf of new roofing for the South Slidell Library Branch located at 3901 Pontchartrain Drive, Slidell, LA.
The time period for completion of work is sixty days (60) days from issuance of Notice to Proceed by the Parish.
 
 |           03/30/2023 07:00 PM UTC | 
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.