St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-3-2
One Time Purchase for Water and Sewer Materials ---- St. Tammany Parish Government, Department of Utilities is seeking bids for a one (1) time purchase of water and sewer materials.
The Parish reserves the right to ward items as “grouped” or on an all-or-none basis and to reject any or all bids and waive informality.
All products shall be new and of current manufacture. Where specified on the bid sheets, prices shall be for the approved brand or a “prior approved equivalent” by the Parish.
The unit price bid shall for materials shall include F.O.B. All products shall be new and of current manufacture. Where specified on the bid sheets, prices shall be for the approved Make/Brand or a Prior Approved Equal by the Parish. Where the specifications do not indicate an Approved Make/Brand for an item, the Parish has no preference. The name of any manufacturer mentioned in the specifications is for the purpose of establishing a minimum acceptable standard of quality desired by the Parish. All products bid must have prior approval as "Prior Approved Equivalents".
All fields must be filled in. NO blanks will be permitted. If the item is unavailable, please enter N/A. "Price/Each" shall represent the cost for the specified item as well as any delivery charge (if applicable) to the location(s) indicated in this bid.
| 02/10/2026 08:00 PM UTC |
|
26-6-1
619 Plantation Blvd Pipe Liner--------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to clean and install a CIPP Liner through the existing pipe to improve drainage as specified along Plantation Blvd (R04D129) located in Mandeville, Louisiana.
| 02/12/2026 08:00 PM UTC |
|
26-4-2
Area 1 Panel & Curb Replacement---------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to remove and replace concrete panels and concrete rollover and barrier curbs in order to improve roadway conditions, as specified, along Palm Ct (R01J091) Madisonville ; Coconut Palm Dr (R01J092) Madisonville ; Del Sol Ct (R01E025) Covington ; Del Sol E (R01E026) Covington ; Del Sol Pass (R01E024) Covington ; Del Sol W (R01E027) Covington ; Covington Meadow Cir (R03L160) Covington, Louisiana.
| 03/03/2026 08:00 PM UTC |
|
26-5-2
Hickory Area Drainage Maintenance------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by installing drain pipes, catch basins, and improving the turning radius as specified along the following Parish roads:
• Blueberry Lp (R06H009) Pearl River, LA;
• E Ridgewood Dr (R06H007) Pearl River, LA;
• Mockingbird Lp (R06H010) Pearl River, LA;
• Silas Thomas Rd (R06H006) Pearl River, LA; and
• W Ridgewood Dr (R06H008) Pearl River, LA
| 03/04/2026 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
20-13-2
Fishing Pier PH II...………………………..Contractor shall furnish all labor, equipment, tools, supplies, and materials necessary for the development of the offshore fishing pier improvements, in accordance with the design specifications and plans, for the St. Tammany Parish fishing pier located at 54001 East Howze Beach Road, Slidell, LA 70461.
| 09/09/2020 07:00 PM UTC |
|
20-15-2
Skillet & Kettle - Jail Kitchen -- Contractor shall provide all labor, equipment, tools and materials to perform the following work at the St. Tammany Parish Jail located at 1200 Champagne Street, Covington, Louisiana 70434 (S38-T6S-R11E). All prices must include shipping and installation. Any required labor to install equipment must be included in the price of the equipment. Existing equipment will be disconnected and given to the owner.
| 08/20/2020 07:00 PM UTC |
|
20-10-2
Black River Dr Bridge ----- The Contractor must provide all labor, equipment, tools, testing and materials required necessary for the removal and replacement of bridge structure, installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications.
The scope of work shall include all items as listed within the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 07/28/2020 07:00 PM UTC |
|
20-9-2
2020 District 8 & 14 Panel Replacements ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as required per the construction drawings and specifications.
The scope of work shall include all items as listed within the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 07/28/2020 07:00 PM UTC |
|
20-11-2
Hollycrest Blvd - The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing, replacing and/or repairing concrete panels as specified along Hollycrest Blvd (R03L114) Section 15 Township 7S Range 11E Covington.
| 07/22/2020 07:00 PM UTC |
|
20-8-2
Alton Drainage Improvements.....................The Contractor must provide all labor, equipment, and tools necessary for the installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications. The project location is Alton Subdivision, Slidell, LA (S23-T8S-R14E)
| 06/25/2020 07:00 PM UTC |
|
20-12-2
Erindale Drainage Phase 2 - The Contractor must provide all labor, equipment, tools, and materials necessary for the removal and installation of drainage structures, concrete curb and drives, and asphalt paving per specifications.
The time period for completion of the work is one hundred eighty (180) days from issuance of Notice to Proceed by the Parish.
| 06/24/2020 07:00 PM UTC |
|
20-7-2
Fairgrounds Phase 3 - The project shall consist of the construction of a concession building (approx. 2,277 sq ft) as an addition to the existing structure. The building shall include a concession stand, offices, storage, restrooms, parking lot and all associated civil
site improvements per the plans and specifications. The project shall also include
a covered area (approx. 12,170 sq ft) and a wash-down area.
| 06/24/2020 07:00 PM UTC |
|
20-14-2
2020 Official Journal - The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
| 06/12/2020 07:00 PM UTC |
|
20-6-2
I-10 Service Rd. Bridge Replacements.......Contractor must provide all adequate and competent labor, equipment, testing and materials necessary for the replacement of two existing bridges (Reine Canal & French Branch Canal) along I-10 Service Rd.; (S1,T9,R14E) in Slidell, LA., with case-in-place concrete slab span bridges, reconstructed roadway approaches, new guardrails, and new drainage structures. The work includes milling and overlaying the existing roadway sections outside of the limits of the newly constructed bridges and roadway approaches.
| 03/31/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.