St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
| 01/16/2025 08:00 PM UTC |
Number | Deadline |
---|---|
300-00-18-19-2
Three Rivers Road Widening Phase 2............ The Contractor must provide all labor, equipment, tools, and materials necessary to perform road improvements as specified along Three Rivers Road in Covington, Louisiana, including: cold planing existing asphalt, widening and overlay of asphalt and concrete, drainage structures, driveway reconstruction, and striping and pavement signing.
| 05/30/2018 07:00 PM UTC |
304-00-18-10-2
2018 District 4 Road Improvements ----- This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Black River Dr (R01J042) Section 42 Township 7S Range 10E; Fountain St (R04C039) Section 45 Township 8S Range 11E; Hawthorne Hollow (R01J041) Section 42 Township 7S Range 10E; Iberville St (R04A006) Section 34 Township 7S Range 11E; Magnolia Ridge Ct (R01J054) Section 42 Township 7S Range 10E; Magnolia St (R04C031) Section 45 Township 8S Range 11E; Pelican Ridge Dr (R01J053) Section 42 Township 7S Range 10E; Rock Bass Ct (R01J052) Section 42 Township 7S Range 10E.
| 05/22/2018 07:00 PM UTC |
309-00-18-12-2
2018 District 9 Road Improvements ----- This is a District Capital Road Improvement Project for District 9. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Bristol Pl (R08N027) Section 38 Township 9S Range 15E; Camden St (R08N024) Section 38 Township 9S Range 15E; Carey Rd (R08A036) Section 10 Township 8S Range 14E; Piney Cir (R08N074) Section 39 Township 9S Range 15E; Spring Ridge Cir (R08N073) Section 39 Township 9S Range 15E; Starling Dr (R08N051) Section 39 Township 9S Range 15E; Starling Dr (R08N151) Section 16 Township 9S Range 15E.
| 05/22/2018 07:00 PM UTC |
314-00-18-04-2
Queen Anne Drainage ----- This is a District Capital Drainage Improvement Project for District 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by installation of pipe to facilitate the installation of a flap gate near Queen Anne Dr (R09G038) Section 38, Township 9, Range 14 in Slidell, Louisiana.
| 05/22/2018 07:00 PM UTC |
302-00-18-05-2
2017 District 2 Road Improvements.....................................This is a District Capital Road Improvement Project for District 2. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Chandler Dr (R03J021) Section 42 Township 6S Range 11E; Dahlia St (R10D015) Section 36 Township 6S Range 11E; KC Camp St (R03F030) Section 6 Township 6S Range 10E; Landry Kate Ln (R03L170) Section 11 Township 7S Range 11E; Ruby St (R03K073) Section 42 Township 7S Range 11E; Third St (R03K017) Section 42 Township 7S Range 11E.
| 05/17/2018 07:00 PM UTC |
303-00-18-01-2
2017 District 3 Road Improvements..........................This is a District Capital Road Improvement Project for Districts 3. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Foal Ct (R03D045) Section 13 Township 16S Range 10E; Orleans Ave (R02N004) Section 18 Township 5S Range 11E; Paris St (R02N016) Section 18 Township 5S Range 11E; Savannah Rd (R01G001) Section 4 Township 7S Range 10E; Wilkinson Rd (R01B011) Section 21 Township 6S Range 10E.
| 05/17/2018 07:00 PM UTC |
622-10-18-24-2
Sewer and Water Appurtenances
Prices remain in effect through December 31, 2019, with option to extend for (1) one additional year, by written agreement of both parties. Any delivery or service charge must be included in the bid price. Quantities may vary; minimum orders shall not be required. St. Tammany Parish Government (Parish) reserves the right to award materials in whole, in part and/or to multiple vendors. Bids must be submitted on the Pricing Sheet provided. All fields must be filled in, NO blanks will be permitted. If the item is unavailable please enter N/A.
The Parish, as a function of Tammany Utilities, owns and operates approximately fifty (50) wastewater treatment plants, forty (40) water wells, and over two-hundred (200) sewage lift stations, water distribution lines and sewage collection lines. Tammany Utilities, therefore, routinely requires has the need for sewer and water pipe, valves, fittings, and other associated appurtenances.
| 05/10/2018 07:00 PM UTC |
306-00-18-17-2
2018 District 6 Road Improvements............................ The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along Driftwood Ln (R05F007) Section 22 Township 5S Range 13E; Herman Singletary Rd (R06I015) Section 29 Township 6S Range 14E; Howard O’Berry Rd Ext (R06E118) Section 15 Township 7S Range 14E; Ida Quave Rd (R05F009) Section 22 Township 5S Range 13E; Marvin Grantham Rd (R05F008) Section 22 Township 5S Range 13E; Morgan Galloway Dr (R06E012) Section 26 Township 7S Range 14E; Omaha Ct (R05B011) Section 27 Township 5S Range 12E; Robert Rd (R02P004) Section 18 Township 7S Range 12E; SE Robert Rd (R02P005) Section 15 Township 5S Range 11E; Simalusa Dr (R02U007) Section 11 Township 5S Range 11E; Warrior Trace (R02U003) Section 11 Township 5S Range 11E.
| 05/02/2018 07:00 PM UTC |
306-00-18-02-2
2017 District 6 Road Improvements.............................This is a District Capital Road Improvement Project for Districts 6. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by reconstructing and/or milling and overlaying, and/or overlaying with patching road surfaces as specified along Della Dillard Rd (R03K034) Section 19 Township 5S Range 13E; Dillard Rd (R05E006) Section 19 Township 5S Range 13E; Ed Yates Rd (R06H027) Section 16 Township 7S Range 14E; Elliot Rd (R05E009) Section 19 Township 5S Range 13E; Kenzie Rd (R02P023) Section 22 Township 5S Range 11E; Lowe Davis Rd (R10C004) Section 15 Township 6S Range 12E; Sharp Chapel Rd (R02S002) Section 7 Township 5S Range 12E; Silas Thomas Rd (R06H006) Section 8 Township 7S Range 14E.
| 05/02/2018 07:00 PM UTC |
010-95-18-22-2
Aviation Fuel
| 04/25/2018 07:00 PM UTC |