General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-23-2
Casril Drive Drainage Improvements--------------------------------------This project includes the construction of subsurface drainage, open ditches, cleaning of box culverts, concrete and asphalt drives, asphalt mill and overlay, signage and striping, and traffic calming speed tables, as specified along Casril Dr. between Hwy 59 and Soell Dr., located in Mandeville, LA.
05/27/2026 07:00 PM UTC
26-14-1
Lake Village Sidewalk Replacement------------- The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve pedestrian walkways by removing and replacing concrete sidewalks at various locations off Lake Village Blvd, Slidell, LA, as specified.
05/27/2026 07:00 PM UTC
26-13-1
Cherry St. Drainage PH 2--------------------------- The Parish requests a contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage along Cherry Street (R09D001), Slidell, Louisiana, by removing, replacing, and/or repairing concrete and asphalt driveways, and removing and replacing driveway culverts as specified.
05/28/2026 07:00 PM UTC
26-11-1
Choctaw Drive Drainage Repair----------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing failed sub-surface drainage, driveways, and adding catch basin, as specified, along Choctaw Drive (R03L111), located in Covington, Louisiana.
05/28/2026 07:00 PM UTC
26-12-1
Fox Ct Drainage-----------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing, replacing, and installing pipes & catch basins, as specified, along Fox Ct. (R04E102), located in Mandeville, Louisiana.
05/28/2026 07:00 PM UTC
26-15-1
Area 3 Turning Radii Improvements-------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve turning radii as specified along the following Parish roads: • Garden Dr (R09G051) Slidell ; • Liberty Dr (R09G047) Slidell ; • Azalea Ln (R09G052) Slidell ; and • Bryan Rd (R09D036) Slidell, Louisiana.
06/02/2026 07:00 PM UTC
26-27-2
St. Tammany Parish Library-Mandeville Branch Reno------------------------------------------St. Tammany Parish Government requires a contractor to perform renovations to the existing Mandeville Branch Library. The project includes improvements to both the exterior and interior of the facility as indicated in the bid documents. The work shall be broken out into a Base Bid and Alternates, as indicated in the drawings.
06/03/2026 07:00 PM UTC
26-18-1
Dockside Dr Drainage----------------------------------------------The Parish requests a Contractor to improve drainage by removing and installing subsurface drainage pipes and catch basins as specified along Dockside Dr (R08F031) located in Slidell, LA.
06/09/2026 07:00 PM UTC
26-31-2
Tammany Trace Bridge #13------------------------ This project consists of the removal of the existing 252.21-foot timber bridge along the Tammany Trace and its replacement with a new 255-foot prefabricated steel truss bridge. Work includes demolition and disposal of the existing timber structure, construction of new concrete abutments and foundations as required, installation of the prefabricated steel truss superstructure, placement of decking and safety railings, and reconstruction of trail approaches to tie into the existing corridor.
06/10/2026 07:00 PM UTC
26-16-1
DPW Hickory Maintenance Facility Fuel Tank/Dock---------------------Contractor will be responsible for turnkey delivery and installation of two (2) 5,000-gallon UL-2085 Fireguard Fuel Tanks or approved equal and (1) Automated Fuel Management System at St Tammany Parish Hickory Maintenance Barn located at 67835 Hwy 41, Pearl River, LA 70452.The fuel tanks shall comply with all federal, state, and local regulations governing fuel tank installation. The new fuel management system must be an OPW Petro Vend PV200. No substitutions will be allowed due to compatibility issues with the existing OPW Petro Vend Fuel Management System already in place.
06/11/2026 07:00 PM UTC
26-28-2
Area 1 Drainage Improvements----------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by installing pipe and catch basins to widen the turning radius as specified along the following Parish roads: • River Rd (R3H001) Covington, LA; • Penn Mill Rd (R03D007) Covington, LA; • Stanga Rd (R01G002) Covington, LA; • Gayle Rd (R01G004) Covington, LA; and • Northridge Dr (R01B018) Covington, LA.
06/16/2026 07:00 PM UTC
26-30-2
2026 Parishwide Striping--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to provide and install thermoplastic striping as specified along the following Parish roads: • Palm Blvd (R03I003) in Covington ; • Branch Crossing Dr (R03H018) in Covington ; • Dogwood Ln (R03I012) in Covington ; • Lake Ramsey Rd (R03D012) in Covington ; • Viola St (R04E070) in Mandeville ; • Lacombe Harbor Rd (R07H028) in Lacombe ; • E. Violet St (R07C112) in Lacombe ; • Rapatel St (R04E025) in Mandeville ; • Lonesome Rd (R04D032) in Mandeville ; • Pleasant Dr (R09C019) in Slidell ; • Camp Villere Rd (R09D012) in Slidell ; • Dixie Ranch Rd (R09C033) in Slidell ; • Garden Dr (R09G051) in Slidell ; • Liberty Dr (R09G047) in Slidell ; • Brookter St (R08V008) in Slidell ; • N. 3rd Ave (R08J006) in Slidell ; • Lake Village Blvd (R08L026) in Slidell ; and • Tammany Trace (R11A001) various locations.
06/17/2026 07:00 PM UTC
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
13 Solicitations

Closed Solicitations

Number Deadline
19-62-2
2019 District 13 Road Improvements.......The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve road surfaces by milling and/or overlaying, patching, RAP material, and driveway aprons along Indian Village Rd (R08P007) Section 15 Township 9S Range 15E ; Richards Dr. (R08Q007) Section 29 Township 9S Range 15E, Slidell, LA., as required in specifications.
02/11/2020 08:00 PM UTC
19-65-2
Lake Ramsey Rd. Turn Lane ----- This is a 2019 Capital Improvement Project. The work in this project will require the contractor to provide all adequate and competent labor, equipment, and materials necessary to complete roadway improvements, along Lake Ramsey Rd. (R03D012) Section 18 Township 6S Range 11E as specified in the drawings and specifications.
02/05/2020 08:00 PM UTC
19-61-2
Whisperwood Blvd ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, materials and supervision required for 3” Mill, 1” Asphalt Leveling Course , 2” Asphalt Wearing Course, 3” Cold Planning, Patching, adjust manhole, and driveway aprons to improve road surfaces in according with specification along Whisperwood Blvd (R08I033) Section 35 Township 8S Range 14E.
02/05/2020 08:00 PM UTC
19-63-2
2019 District 9 Road Improvements, Pt 2 ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying, cold planning, patching, drain pipe, topsoil material, and driveway aprons as required in specifications along Manchester Dr. (R08N005) Section 38 Township 9S Range 15E, Slidell, LA.; Pat Smith Rd (R08B008) Section 2 Township 8S Range 14E, Pearl River, LA.; Pine Alley Dr. (R08E031) Section 19 Township 8S Range 15E, Pearl River, LA.
02/04/2020 08:00 PM UTC
19-64-2
2019 District 3 Road Improvements, Pt 3 ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by overlaying, patching, RAP material, and driveway aprons as required in the specifications along C. Gotti Rd. (R02J003) Section 36 Township 5S Range 10E ; Thompson Rd (R02J005) Section 35 Township 5S Range 10E, Folsom, LA.
02/03/2020 08:00 PM UTC
19-45-2
Utility Construction and Maintenance Contract
01/03/2020 08:00 PM UTC
19-43-2
Riverwood Subdivision and Covington Country Club Estates Drainage Improvement Phase 2....... The Contractor must provide all labor, equipment, tools, and materials necessary for the installation of storm drain pipe, drainage structures and incidental removal and replacement of concrete drives, curbs, and asphalt pavement on Laurelwood Drive (R04A029), Riverwood Subdivision, Section 37 Township 7 Range 11E, Covington, LA 70433.
01/03/2020 08:00 PM UTC
19-57-2
Striping - Prices remain in effect from January 1, 2020, through December 31, 2020, with the option to extend for (1) one additional year, by written agreement of both parties. Any delivery or service charge must be included in the bid price. Quantities may vary; minimum orders shall not be required. St. Tammany Parish Government reserves the right to award materials in whole, in part and/ or to multiple vendors. Bids must be submitted on the Pricing Sheet provided. All Price blank spaces must be filled in, NO blanks will be permitted. If the item is unavailable, or you are not bidding on the item, please enter N/A or No Bid. Bidders must submit a bid to install Thermoplastic and traffic paint striping, legends, symbols, and raised markings. Pavement marking placement shall be in accordance with section 732 of LADOTD Standard Specifications for Roads and Bridges. This work shall be in compliance with MUTCD. Plastic pavement markings include stripes, gore markings, lines, legends and symbols. The successful bidder will be given a maximum of sixty (60) days from the issuance of a purchase order to complete the same.
12/17/2019 08:00 PM UTC
19-47-2
Lake Ramsey Rd. Turn Lane..............................The work specified in this 2019 Capital Improvements Project, Lake Ramesy Rd. Turn Lane will require the Contractor to provide all adequate and competent labor, equipment, and materials necessary to complete roadway improvements, along Lake Ramsey Rd. (R03D012) Section 18 Township 6S Range 11E as specified in the drawings and specifications.
12/12/2019 08:00 PM UTC
19-48-2
Sodium Hypochlorite Bulk Delivery........................Parish requires the Provider to supply and deliver 12.5% liquid sodium Hypochlorite (12.5 Trade Percent Available Chlorine) FOB destination in accordance with the American Water Works Association’s Standard B-300-04 for hypochlorite to Tammany Utilities container sites (Attachment “A”) as requested and determined by the Parish.
12/12/2019 08:00 PM UTC
521 - 530 of 965 Solicitations
1 2 49 50 51 53 55 56 57 96 97