General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-5-2
Pinnacle Parkway------------------------------------------------The work specified in this project will require the contractor to provide the labor, equipment, and materials necessary to improve the roadway surface along Pinnacle Parkway (R01D020) Section 47, Township 7S Range 11E, Mandeville, LA.
04/30/2025 07:00 PM UTC
25-23-1
Solomon Dr. Sinkhole Repair----------------------------------The Parish requests a contractor to repair the sinkhole by cleaning/repairing/resealing the catch basin and interior pipe joints on Solomon Dr., Covington, LA 70433
04/30/2025 07:00 PM UTC
25-22-1
Lenwood Dr Pond & Lowe Pond Fence Repairs----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to repair existing fence and install new fence and gates, as specified along Lenwood Dr (P08IW01132); and Lowe Pond (P08AW02007) located in Slidell, Louisiana.
04/30/2025 07:00 PM UTC
25-14-2
Official Journal ----The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
05/06/2025 07:00 PM UTC
25-26-1
Lake Erie Dr Drainage -------The Parish requests a contractor to repair/replace/reseal existing structure(s) to restore area drainage by repair/replace/reseal drain pipe, catch basin, and sod, as specified along Lake Erie Dr (R08L056); located in Slidell, Louisiana.
05/06/2025 07:00 PM UTC
25-13-2
Coroner Chiller Addition--- This Project consists of the addition of one 200-ton Chiller and the furnishing and installation of new piping systems to connect to existing piping in existing building systems as shown on the drawings. The Project also consists of removing the existing and providing new Temperature Control devices as shown on drawings.
05/14/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
314-00-18-23-2
2018 District 12 & 14 Panel Replacements ............The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by removing/replacing/repairing concrete panels and curbs as specified along Admiral Nelson Dr (R08V034) Section 23 Township 9S Range 14E; Brookter St (R08V118) Section 24 Township 9S Range 14E; Chancer Ln (R08V062) Section 24 Township 9S Range 14E; Dylan Dr (R08V068) Section 24 Township 9S Range 14E; Heather Ln (R08V048) Section 24 Township 9S Range 14E; Oak Harbor Blvd (R09J090) Section 44 Township 9S Range 14E.
07/12/2018 07:00 PM UTC
311-00-18-32-2
2018 District 11 Rd Improvements..........................The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing, milling and overlaying, overlaying with patching, and/or patching road surfaces as specified along Chinkapin Ct (R09A040) Section 30 Township 8S Range 14E; Ezell Rd (R07B003) Section 8 Township 8S Range 13E; Narcisse St (R09H010) Section 38 Township 9S Range 14E; Red Bud Ln (R09A042) Section 30 Township 8S Range 14E; S Tranquility Rd (R09E001) Section 34 Township 8S Range 13E; Tupelo St (R06G005) Section 33 Township 7S Range 14E; Chateau Dr (R09B001) Section 19 Township 8S Range 14E; Carolyn Ln (R09E010) Section 3 Township 9S Range 13E.
07/11/2018 07:00 PM UTC
308-00-18-14-2
2018 District 8 Panel Replacements ----- This is a District Capital Road Improvement Project for District 8. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by removing/replacing/repairing concrete panels and concrete rollover curbs as specified along Amber Ct (R08L058) Section 31 Township 8S Range 15E; Defiance Dr (R08I054) Section 25 Township 8S Range 14E; E Forest Dr (R08I039) Section 35 Township 8S Range 14E; Heather Dr (R08I053) Section 25 Township 8S Range 14E; Lake Ontario Ct (R08L052) Section 31 Township 8S Range 15E; Lake Village Blvd (R08L026) Section 36 Township 8S Range 15E; Meredith Dr (R08I058) Section 25 Township 8S Range 14E; Timbers Dr (R08I043) Section 26 Township 8S Range 14E; W Lake Catahoula Ct (R08L060) Section 31 Township 8S Range 15E.
07/11/2018 07:00 PM UTC
307-00-18-13-2
2018 District 7 Panel Replacements ----- This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadway by removing/replacing/repairing concrete panels and concrete rollover curbs as specified along Autumn Wind Ln (R04F063) Section 7 Township 7S Range 12E; Autumn Woods Dr (R04E246) Section 48 Township 8S Range 12E; Sycamore Pl (R04E120) Section 6 Township 8S Range 12E.
07/11/2018 07:00 PM UTC
303-00-18-18-2
2018 District 3 Road Improvements ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Blackwell Cemetery Rd (R02E011) Section 11 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Factory Rd (R02D004) Section 1 Township 5S Range 10E; Lela Belle Rd (R02A006) Section 19 Township 4S Range 10E; Willie Garrett Rd (R02A012) Section 28 Township 4S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
07/09/2018 07:00 PM UTC
302-00-18-20-2
2018 District 2 Road Improvements ...........................The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Artesian Dr (R03J006) Section 26 Township 6S Range 11E; Barker Blvd (R02R019) Section 26 Township 5S Range 11E; Jackies Ln (R03K030) Section 36 Township 6S Range 11E; Jenkins Ave Cont (R03K062) Section 42 Township 6S Range 11E; Oak Crest Dr (R02R020) Section 26 Township 5S Range 11E; Pennino Rd (R03F008) Section 3 Township 6S Range 11E; River Hill Ct (R03K125) Section 42 Township 7S Range 11E.
07/03/2018 07:00 PM UTC
303-00-18-18-2
2018 District 3 Road Improvements ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Blackwell Cemetery Rd (R02E011) Section 11 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Factory Rd (R02D004) Section 1 Township 5S Range 10E; Lela Belle Rd (R02A006) Section 19 Township 4S Range 10E; Willie Garrett Rd (R02A012) Section 28 Township 4S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
06/26/2018 07:00 AM UTC
311-00-18-28-2
2017 District 11 Rd Improvements...........................This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by reconstructing, milling and overlaying, and/or overlaying with patching road surfaces as specified along Dummyline Rd (R06G006) Section 27 Township 7S Range 14E; Maxi Ln (R08A003) Section 3 Township 8S Range 14E; Murray Rd (R08A002) Section 2 Township 8S Range 14E.
06/20/2018 07:00 PM UTC
312-00-18-29-2
City Dr Drainage, Ph. 2...........................The Contractor must provide all labor, equipment, tools, and materials necessary to improve the drainage system along the existing roadside ditches. Work to include removing/replacing driveway culverts, drainage pipes, concrete walks and driveways, excavation, installing catch basins, and concrete headwalls as specified along City Dr. (R09J050) in Slidell, Louisiana (Section 22 Township 9S Range 14E).
06/19/2018 07:00 PM UTC
300-00-18-27-2
Christwood Blvd Ext.............The Contractor must provide all labor, equipment, tools, and materials necessary to perform the following: • Clearing and grubbing of the new right-of-way, including stripping topsoil, grubbing, and hauling off of trees, vegetation, and topsoil; • Construction of a two lane undivided roadway, cul-de-sac(s), and driveways, including roadway/driveway base and sub-base, striping, and signage; • Construction of roadside ditches, including culverts and sweeping of an existing ditch; • Removal of existing asphalt, including temporary stockpiling and haul-off; • Construction of a right turn lane from Brewster Road to Christwood Boulevard Extension, including pavement base and sub-base, curb and gutter, striping and signage; and • Other items as shown on the plans, specifications and supplemental specifications.
06/08/2018 07:00 PM UTC
521 - 530 of 863 Solicitations
1 2 49 50 51 53 55 56 57 86 87