General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
01/16/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
339-00-17-63-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
10/04/2017 07:00 PM UTC
310-00-17-59-2
Forest Ln & Forest Ln Drainage................................. This is a District Capital Road Improvement Project for District 10. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road by reconstructing road surface. Work also included will be removing/ replacing storm drain pipes, catch basin, brisk walkway, clearing and grubbing, adjust man hole, and remove/relocate mailboxes as specified along Forest Ln (R04D091) Section 40 Township 7S Range 11E.
09/27/2017 07:00 PM UTC
440-14-17-62-2
Airfield Lighting and NAVAIDS ----- This project consists of the installation of airfield lighting and NAVAIDS for 18/36.
09/26/2017 07:00 PM UTC
522-00-17-60-2
HVAC Controllers Upgrade
09/26/2017 07:00 PM UTC
314-00-17-58-2
2017 District 14 Road Improvements........This is a District Capital Road Improvement Project for Districts 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Browns Village Rd (R09I001) Section 27 Township 8S Range 14E; Fifth St (R09I018) Section 27 Township 8S Range 14E; Fifteenth St (R09I056) Section 27 Township 8S Range 14E; First St (R09I010) Section 27 Township 8S Range 14E; and Javery St (R09D038) Section 34 Township 8S Range 14E.
09/21/2017 07:00 PM UTC
311-00-17-54-2
Ranch Rd & Ranch Rd Drainage ----- This is a District Capital Road Improvement Project for Districts 11. The Contractor must provide all labor, equipment, tools, testing, and materials necessary to improve the road by reconstructing the road surface. The work will also include the removal/replacement of drain pipes, cleaning/shaping/grading ditches, installing pipe headwalls, maintenance aggregate, topsoil, and hydro-seeding, as specified, along Ranch Rd (R09E050) Section 39 Township 9S Range 13E, Slidell, LA.
09/19/2017 07:00 PM UTC
321-00-17-55-2
Building B Buildout - Public Works...Portions of the third floor of Koop Drive, Building B shall have carpet tiles and linear base installed per the manufacturer’s specifications. All materials and demolition, surface preparation and installation work shall be included.
09/14/2017 07:00 PM UTC
015-05-17-65-2
Road Signs
09/14/2017 07:00 PM UTC
300-00-17-57-2
Dove Park Rd. Mill and Overlay -------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
09/12/2017 07:00 PM UTC
316-00-17-47-2
Lake Village Drainage Improvements/N. Pearl Dr Mill and Overlay..... A. Lake Village Drainage Improvements o Selective tree removal o Demolition and removal of existing catch basins and storm drains. o Installation of new junction boxes and catch basins. o Installation of approximately 2,000 linear feet of 60” RCP storm drain and miscellaneous storm drains ranging from 15” to 24” diameter. o Roadway repair, sidewalk construction, and driveway construction. o Grading, erosion and sediment control, traffic control, and vegetation establishment. B. North Pearl Mill and Overlay o 2” mill and overlay from Station 01+38 (Gause Boulevard) to Station 44+50 (Lake Erie Drive) as shown in the Plans. o Guardrail system at W-15 Canal crossing o Striping
09/07/2017 07:00 PM UTC
531 - 540 of 833 Solicitations
1 2 50 51 52 54 56 57 58 83 84