General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-40-2
Nolan Rd Ph 2--------------------Work to include subsurface drainage on both sides of Nolan Rd, in addition to widening, overlaying, and striping the entirety of the roadway. Work shall include the excavation and/or embankment, clearing and grubbing, driveway replacement, signage replacement, and hydroseeding, as specified along Nolan Rd (R10D003) Section 30 Township 7S Range 12E, located in Covington, LA.
09/22/2026 07:00 PM UTC
26-41-2
French Branch Pond Expansion------------The project consists of the construction of an approximately 47.77 acre pond and associated drainage infrastructure. The work includes, but is not limited to, construction of a stone access road; installation of inlet and outlet concrete structures; installation of subsurface drainage structures; construction of weirs and headwalls; and off-site disposal of excavated materials.
10/01/2026 07:00 PM UTC
26-42-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings
10/14/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
307-00-18-13-2
2018 District 7 Panel Replacements ----- This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadway by removing/replacing/repairing concrete panels and concrete rollover curbs as specified along Autumn Wind Ln (R04F063) Section 7 Township 7S Range 12E; Autumn Woods Dr (R04E246) Section 48 Township 8S Range 12E; Sycamore Pl (R04E120) Section 6 Township 8S Range 12E.
07/11/2018 07:00 PM UTC
303-00-18-18-2
2018 District 3 Road Improvements ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Blackwell Cemetery Rd (R02E011) Section 11 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Factory Rd (R02D004) Section 1 Township 5S Range 10E; Lela Belle Rd (R02A006) Section 19 Township 4S Range 10E; Willie Garrett Rd (R02A012) Section 28 Township 4S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
07/09/2018 07:00 PM UTC
302-00-18-20-2
2018 District 2 Road Improvements ...........................The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Artesian Dr (R03J006) Section 26 Township 6S Range 11E; Barker Blvd (R02R019) Section 26 Township 5S Range 11E; Jackies Ln (R03K030) Section 36 Township 6S Range 11E; Jenkins Ave Cont (R03K062) Section 42 Township 6S Range 11E; Oak Crest Dr (R02R020) Section 26 Township 5S Range 11E; Pennino Rd (R03F008) Section 3 Township 6S Range 11E; River Hill Ct (R03K125) Section 42 Township 7S Range 11E.
07/03/2018 07:00 PM UTC
303-00-18-18-2
2018 District 3 Road Improvements ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Blackwell Cemetery Rd (R02E011) Section 11 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Factory Rd (R02D004) Section 1 Township 5S Range 10E; Lela Belle Rd (R02A006) Section 19 Township 4S Range 10E; Willie Garrett Rd (R02A012) Section 28 Township 4S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
06/26/2018 07:00 AM UTC
311-00-18-28-2
2017 District 11 Rd Improvements...........................This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by reconstructing, milling and overlaying, and/or overlaying with patching road surfaces as specified along Dummyline Rd (R06G006) Section 27 Township 7S Range 14E; Maxi Ln (R08A003) Section 3 Township 8S Range 14E; Murray Rd (R08A002) Section 2 Township 8S Range 14E.
06/20/2018 07:00 PM UTC
312-00-18-29-2
City Dr Drainage, Ph. 2...........................The Contractor must provide all labor, equipment, tools, and materials necessary to improve the drainage system along the existing roadside ditches. Work to include removing/replacing driveway culverts, drainage pipes, concrete walks and driveways, excavation, installing catch basins, and concrete headwalls as specified along City Dr. (R09J050) in Slidell, Louisiana (Section 22 Township 9S Range 14E).
06/19/2018 07:00 PM UTC
300-00-18-27-2
Christwood Blvd Ext.............The Contractor must provide all labor, equipment, tools, and materials necessary to perform the following: • Clearing and grubbing of the new right-of-way, including stripping topsoil, grubbing, and hauling off of trees, vegetation, and topsoil; • Construction of a two lane undivided roadway, cul-de-sac(s), and driveways, including roadway/driveway base and sub-base, striping, and signage; • Construction of roadside ditches, including culverts and sweeping of an existing ditch; • Removal of existing asphalt, including temporary stockpiling and haul-off; • Construction of a right turn lane from Brewster Road to Christwood Boulevard Extension, including pavement base and sub-base, curb and gutter, striping and signage; and • Other items as shown on the plans, specifications and supplemental specifications.
06/08/2018 07:00 PM UTC
300-00-18-19-2
Three Rivers Road Widening Phase 2............ The Contractor must provide all labor, equipment, tools, and materials necessary to perform road improvements as specified along Three Rivers Road in Covington, Louisiana, including: cold planing existing asphalt, widening and overlay of asphalt and concrete, drainage structures, driveway reconstruction, and striping and pavement signing.
05/30/2018 07:00 PM UTC
304-00-18-10-2
2018 District 4 Road Improvements ----- This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Black River Dr (R01J042) Section 42 Township 7S Range 10E; Fountain St (R04C039) Section 45 Township 8S Range 11E; Hawthorne Hollow (R01J041) Section 42 Township 7S Range 10E; Iberville St (R04A006) Section 34 Township 7S Range 11E; Magnolia Ridge Ct (R01J054) Section 42 Township 7S Range 10E; Magnolia St (R04C031) Section 45 Township 8S Range 11E; Pelican Ridge Dr (R01J053) Section 42 Township 7S Range 10E; Rock Bass Ct (R01J052) Section 42 Township 7S Range 10E.
05/22/2018 07:00 PM UTC
309-00-18-12-2
2018 District 9 Road Improvements ----- This is a District Capital Road Improvement Project for District 9. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Bristol Pl (R08N027) Section 38 Township 9S Range 15E; Camden St (R08N024) Section 38 Township 9S Range 15E; Carey Rd (R08A036) Section 10 Township 8S Range 14E; Piney Cir (R08N074) Section 39 Township 9S Range 15E; Spring Ridge Cir (R08N073) Section 39 Township 9S Range 15E; Starling Dr (R08N051) Section 39 Township 9S Range 15E; Starling Dr (R08N151) Section 16 Township 9S Range 15E.
05/22/2018 07:00 PM UTC
661 - 670 of 1000 Solicitations
1 2 63 64 65 67 69 70 71 99 100