St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
| 11/05/2025 08:00 PM UTC |
|
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
| 11/12/2025 08:00 PM UTC |
|
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads:
- Cours Carson St, Mandeville, LA;
- Debellvue Pl, Mandeville, LA;
- Joans St, Mandeville, LA;
-Kramer Ct, Mandeville, LA;
-Pecan Pass, Mandeville, LA; and
- Rosedown Way, Mandeville, LA.
| 11/13/2025 08:00 PM UTC |
|
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of
subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
| 11/18/2025 08:00 PM UTC |
|
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
| 11/20/2025 08:00 PM UTC |
|
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
| 11/20/2025 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
316-00-17-47-2
Lake Village Drainage Improvements/N. Pearl Dr Mill and Overlay.....
A. Lake Village Drainage Improvements
o Selective tree removal
o Demolition and removal of existing catch basins and storm drains.
o Installation of new junction boxes and catch basins.
o Installation of approximately 2,000 linear feet of 60” RCP storm drain and miscellaneous storm drains ranging from 15” to 24” diameter.
o Roadway repair, sidewalk construction, and driveway construction.
o Grading, erosion and sediment control, traffic control, and vegetation establishment.
B. North Pearl Mill and Overlay
o 2” mill and overlay from Station 01+38 (Gause Boulevard) to Station 44+50 (Lake Erie Drive) as shown in the Plans.
o Guardrail system at W-15 Canal crossing
o Striping
| 09/07/2017 07:00 PM UTC |
|
315-05-17-50-2
2017 Districts 6 & 5 Road Improvements.....This is a district capital road improvement project for Districts 6 & 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Firetower Rd (R06H001) Section 5 Township 7S Range 14E; St Amand St (R10C002) Section 19 Township 6S Range 12E; Sandy Ln (R04D057) Section 27 Township 7S Range 11E; and Harper Rd #2 (R06F005) Section 15 Township 7S Range 14E.
| 09/05/2017 07:00 PM UTC |
|
311-00-17-52-2
2017 District 11 Road Improvements....This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Azalea Ln (R06L005) Section 33 Township 7S Range 13E ; Red Mill Rd (R07C042) Section 28 Township 8S Range 13E (Lacombe, La.).
| 09/05/2017 07:00 PM UTC |
|
416-15-17-53-2
Lower W-15 Area Drainage Improvements...............................The completed Work will provide Owner with a regional stormwater detention pond known as the Tenet Pond. Additional details describing the work are provided in Section 01 11 00 of Division 01, Technical Specifications.
| 08/31/2017 07:00 PM UTC |
|
015-60-17-51-2
Windshield Repair/ Replacement
| 08/16/2017 07:00 PM UTC |
|
303-00-17-49-2
2017 District 3 Road Improvements.....This is a District Capital Road Improvement Project for District 3. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; and Stephanie Ln (R01B021) Section 8 Township 6S Range 10E, Covington, Louisiana.
| 08/01/2017 07:00 PM UTC |
|
339-00-17-46-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
| 07/27/2017 07:00 PM UTC |
|
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
| 07/27/2017 07:00 PM UTC |
|
522-00-17-45-2
HVAC Controllers Upgrade... The Contractor must provide, install, program, and commission new HVAC network controllers, server and associated equipment in two (2) Parish facilities, as per the specifications.
| 07/20/2017 07:00 PM UTC |
|
304-00-17-44-2
Woodridge Blvd Drainage and Canary Pine Ct Drainage....
The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, excavation and embankment on Woodridge Blvd (R04C004) Section 19 Township 8 Range 15 and Canary Pine Court (R04C006) Section 19 Township 8 Range 15.
| 07/18/2017 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.