St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
| 11/05/2025 08:00 PM UTC |
|
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
| 11/12/2025 08:00 PM UTC |
|
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads:
- Cours Carson St, Mandeville, LA;
- Debellvue Pl, Mandeville, LA;
- Joans St, Mandeville, LA;
-Kramer Ct, Mandeville, LA;
-Pecan Pass, Mandeville, LA; and
- Rosedown Way, Mandeville, LA.
| 11/13/2025 08:00 PM UTC |
|
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of
subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
| 11/18/2025 08:00 PM UTC |
|
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
| 11/20/2025 08:00 PM UTC |
|
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
| 11/20/2025 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
015-15-16-63-2
Hot Mix Asphalt
| 12/29/2016 08:00 PM UTC |
|
015-45-16-64-2
Plastic Culvert Pipe
| 12/29/2016 08:00 PM UTC |
|
015-25-16-61-2
Corrugated Steel Culverts
| 12/29/2016 08:00 PM UTC |
|
010-35-16-62-2
Fuel & Oil
| 12/29/2016 08:00 PM UTC |
|
015-60-16-66-2
Windshield Repair/ Replacement
| 12/29/2016 08:00 PM UTC |
|
015-80-16-60-2
Trace Bridge Repairs - The Contractor must provide all labor, materials, equipment and supervision necessary to remove and replace decayed timber piles, stringers, and bent caps. The work is to include all necessary cribbing, jacking and supports required to hold up deck and all galvanized connectors, as well as all hardware required to install materials. Timber is to be replaced.
| 12/09/2016 08:00 PM UTC |
|
314-00-16-55-2
Voters Rd. - Curve to Allen Rd. Mill and Overlay ----- This is a 2016 Capital Road Improvement Project for District 13 and District 14. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by milling and overlaying and improve drainage by installing subsurface drainage as specified along Voters Rd (R08V002) Section 24 Township 9S Range 14E.
| 10/18/2016 07:00 PM UTC |
|
015-45-16-58-2
2016 DPW Maintenance Overlays Phase 2
The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2 inch asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12 inch patching and 1.5 inches cold planing as specified. See specifications attached for: 9th Street (R04A038); 11th Street (R04A003); Brookside (R04D035); Cody Lane (R02O028); Fincher Road (R05E016); Green Court (R04E162); La Salle Street (R04D059); Le Cirque (R01J073); Meadow Court (R04E160); Nelson Road (R05F018); Passman Road (R03F031); Prairie Court (R04E164); Raehyo Lane (R03E013); Ridge Court (R04E163); Rue Mon Jardin (R01J070); St. Ann Street (R03J035); Trail Court (R04E159); Walker Street (R03J034); and Ward Road (R05E015).
| 10/18/2016 07:00 PM UTC |
|
312-00-16-56-2
2016 District 12 Road Improvements ----- This is a 2016 Capital Road Improvement Project for District 12. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with a 2” mill and overlaying, and removing and replacing concrete panels as specified along Behrman Street (R08U015) Section 23 Township 9S Range 14E ; and Bosworth Street (R08U020) Section 23 Township 9S Range 14E.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 09/28/2016 07:00 PM UTC |
|
015-35-16-54-2
2016 DPW Maintenance Overlays Phase 1
------
The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2” Asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12” patching and manhole adjustment, as specified. See specifications attached for Coci Road (R06E015); Dixie Road (R09I002); Donnis Drive (R09B007); Golden Lane (R08A006); Jefferson Street (R09D035); John Anthon Road (R06G022); Lynn Road (R09F007); Marina Lane (R09H042); Miller Creek Lane (R08I004); Neal Lane (R08K010); Pebblebrook Lane (R08I003); Shirmac Drive (R08N069); Sleepy Hollow Lane (R08I011); Sue Street (R09F006); Susan Lane (R08K009); and Third Street (R09I016).
The time period for completion of the project is 90 calendar days + calculated rain days.
The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 09/27/2016 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.