General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
015-25-17-02-2
Road Materials
02/21/2017 08:00 PM UTC
403-09-16-59-2
Fishing Pier Phase II Offshore
02/14/2017 08:00 PM UTC
015-05-17-05-2
Road Signs
02/09/2017 08:00 PM UTC
010-35-17-03-2
Fuel & Oil
02/09/2017 08:00 PM UTC
015-45-17-04-2
Plastic Culvert Pipe
02/09/2017 08:00 PM UTC
015-25-17-01-2
Corrugated Steel Culverts
02/09/2017 08:00 PM UTC
015-60-17-06-2
Windshield Repair/ Replacement
02/09/2017 08:00 PM UTC
300-00-16-69-2
Brownswitch Rd Mill and Overlay..................................... This is a 2016 Capital Road Improvement Project for District 8 and District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete as specified along Brownswitch Rd (R08G001, R08H013, R08I095) Section 35 Township 8S Range 14E, Section 36 Township 8S Range 14E, and Section 31 Township 8S Range 15E.
01/24/2017 08:00 PM UTC
015-05-16-65-2
Road Signs
12/29/2016 08:00 PM UTC
015-25-16-67-2
Road Materials
12/29/2016 08:00 PM UTC
671 - 680 of 914 Solicitations