General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-32-2
Utility Point Of Repair------------------------------- The WORK shall consist of point repairs, rehabilitation, and replacement of water and sewer infrastructure. This WORK shall include scheduled and emergency repairs of water and sewer infrastructure. The WORK may also include limited extensions of new water and/or sewer infrastructure to provide service.
06/23/2026 07:00 PM UTC
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
06/24/2026 07:00 PM UTC
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
339-00-17-46-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
07/27/2017 07:00 PM UTC
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
07/27/2017 07:00 PM UTC
522-00-17-45-2
HVAC Controllers Upgrade... The Contractor must provide, install, program, and commission new HVAC network controllers, server and associated equipment in two (2) Parish facilities, as per the specifications.
07/20/2017 07:00 PM UTC
304-00-17-44-2
Woodridge Blvd Drainage and Canary Pine Ct Drainage.... The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, excavation and embankment on Woodridge Blvd (R04C004) Section 19 Township 8 Range 15 and Canary Pine Court (R04C006) Section 19 Township 8 Range 15.
07/18/2017 07:00 PM UTC
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
07/12/2017 07:00 PM UTC
622-10-17-48-2
Sewer & Appurtenances Annual Part 2
07/12/2017 07:00 PM UTC
315-45-17-43-2
2017 District 4 Road Improvements.... This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Copal St (R04C032) Section 45 Township 8S Range 11E; Northlake Dr (R03K061) Section 45 Township8S Range 11E; and Dogwood Dr (R03K020) Section 37 Township 7S Range 11E.
06/27/2017 07:00 PM UTC
622-10-17-35-2
Submersible Pump Annual.....This is not a new bid - previous bid inadvertently closed. The Parish, as a function of Tammany Utilities, owns and operates approximately 50 wastewater treatment plants, 40 water wells, over 200 sewage lift stations and miles of water distribution and sewage collection lines. Tammany Utilities, therefore, routinely has the need for submersible pumps.
06/15/2017 07:00 PM UTC
310-00-17-42-2
Marigny Avenue Drainage Improvements........................ The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, and performing drainage excavation on Marigny Avenue (R04E115) Section 38 Township 7 South Range 11.
06/14/2017 07:00 PM UTC
300-00-17-36-2
Dove Park Rd. Mill and Overlay ---------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
06/13/2017 07:00 PM UTC
691 - 700 of 978 Solicitations
1 2 66 67 68 70 72 73 74 97 98