General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-16-2
Rosedown Way Drainage Phase 2-------------- The Contractor shall provide all labor, equipment, tools, testing, and materials necessary to complete drainage improvements in accordance with the construction plans and specifications for the Rosedown Subdivision, located in Mandeville, Louisiana, 70471. The work includes replacement of existing drainage infrastructure along Camden Court, construction of a new concrete-lined channel to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all incidental work, such as replacement of concrete street panels, sidewalks, and driveways, utility relocations, installation of sewer and water conflict boxes, and placement of rip rap at the outfall.
03/31/2026 07:00 PM UTC
26-8-1
123 Kelly Dr. & 222 S. Queens Dr. Drainage---------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials, for cleaning and sealing pipe joints and catch basins, removing and replacing panels, and rebuilding CB-06 to improve drainage as specified along Kelly Dr (R081005) and S Queens Dr (R081072) located in Slidell, Louisiana.
03/31/2026 07:00 PM UTC
26-7-1
Cody Ln Drainage---------------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary for the removal and replacement of existing structures to restore proper drainage, including installing or replacing drain pipes, cleaning existing ditches, driveways, and turnouts, and completing miscellaneous related work and sod restoration as specified along Cody Ln (R020028); located in Covington, Louisiana.
03/31/2026 07:00 PM UTC
26-17-2
Slemmer Rd Drainage Ph 2--------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing, replacing, and/or repairing drainpipes, catch basins, driveways, and sod as specified along Slemmer Rd (R03L006), located in Covington, LA.
04/01/2026 07:00 PM UTC
26-9-1
Paradise CT Drainage------------------------------ The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by repairing sinkholes and eroded pipes as specified along Paradise Ct (R04D154), Covington, Louisiana.
04/01/2026 07:00 PM UTC
26-13-2
Justice Center Boilers--------------------------Base Bid to include the removal of (2) existing hot water heating boilers with (1) new boiler to be replaced in a configuration similar to existing. Piping for the second boiler shall be stubbed out and capped for future replacement. A rental boiler shall be included to maintain building heating during the project. A new opening and roll door in the boiler room wall to be installed to accommodate boiler removal and installation as well as future service. The door to the loading dock area will be replaced with a pair of 3'-0" x 8'-0" hollow metal doors and hardware to accommodate boiler replacement.
04/08/2026 07:00 PM UTC
26-18-2
2026 District 7 Road Improvements------------- The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying road surfaces along various District 7 Parish roads.
04/14/2026 07:00 PM UTC
26-19-2
2026 District 2, 3 Road Improvements---------- The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying, patching, and reconstructing road surfaces as specified along various District 2 and District 3 Parish roads.
04/14/2026 07:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
010-07-17-29-2
2017 Official Journal
04/13/2017 07:00 PM UTC
010-01-17-25-2
SUV Chevrolet Suburban
04/13/2017 02:39 PM UTC
314-00-17-21-2
2017 Districts 8, 13 & 14 Panel Replacements - This is a District Capital Panel Replacement Project for Districts 8, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by removing and replacing various concrete panels and rollover curbs as specified along Devonshire Dr. (R08V039) Section 32 Township 6S Range 12E ; Hampton Ln (R08V042) Section 24 Township 9S Range 14E; Lake Superior Dr. (R08L047) Section 31 Township 8S Range 15E; Lake Michigan Dr. (R08L050) Section 31 Township 8S Range 15E; Montgomery Blvd (R08V044) Section 24 Township 9S Range 14E ; and Shylock Dr. (R08V059) Section 32 Township 6S Range 12E.
04/12/2017 07:00 PM UTC
460-00-17-24-2
Safe Haven Handicap Day Center Rehab.......Site,Exterior and interior renovations to an existing building. Work to include, but not limited to civil, architectural, mechanical and electrical labor as indicated on construction documents.
04/12/2017 07:00 PM UTC
304-00-17-19-2
2017 District 1&4 Road Improvements................This is a District Capital Road Improvement project for Districts 1 & 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and/or milling and overlaying roads as specified along Oak Park Dr. (R01I004) Section 16 Township 8S Range 10E; Perrilloux Rd (R01I001) Section 16 Township 7S Range 10E; Wager Cemetery Rd (R01I002) Section 9 Township 7S Range 10E; Black River Dr. (R01J042) Section 42 Township 7S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
04/11/2017 07:00 PM UTC
318-00-17-23-2
Fairgrounds Phase 3
04/11/2017 07:00 PM UTC
307-00-17-14-2
Wax Wing Canal Improvements --------------------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by grading banks to proper slope and installing armormax anchored reinforced vegetation system as specified along Wax Wing Canal (D04EW01174) Section 55 Township 8S Range 11E.
04/07/2017 07:00 PM UTC
303-00-17-10-2
2017 District 3 Road Improvements ------ This is a District Capital Road Improvement Project for District 3. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing them as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Hay Hollow (R02F027) Section 4 Township 5E Range 10E; Penn Mill Lakes Blvd (R03D031) Section 13 Township 6S Range 10E; and Savannah Rd (R01G001) Section 4 Township 7S Range 10E.
04/04/2017 07:00 PM UTC
307-00-17-22-2
2017 District 7 Road Improvements-----------This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Cedar Dr. (R04F038) Section 7 Township 7S Range 12E; Elm St (R04F039) Section 7 Township 7S Range 12E; Hemlock Dr. (R04F037) Section 7 Township 7S Range 12E; Joans St (R04E056) Section 1 Township 8S Range 11E; Labarre St (R04E026) Section 38 Township 8S Range 11E; and Redwood Dr. (R04F040) Section 7 Township 7S Range 12E . The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is sixty (60) calendar days + Calculated Rain Days per attached specifications.
04/04/2017 07:00 PM UTC
015-05-17-17-2
Road Signs
03/23/2017 07:00 PM UTC
691 - 700 of 950 Solicitations
1 2 66 67 68 70 72 73 74 94 95