St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-16-2
Rosedown Way Drainage Phase 2--------------
The Contractor shall provide all labor, equipment, tools, testing, and materials
necessary to complete drainage improvements in accordance with the construction
plans and specifications for the Rosedown Subdivision, located in Mandeville,
Louisiana, 70471. The work includes replacement of existing drainage
infrastructure along Camden Court, construction of a new concrete-lined channel
to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all
incidental work, such as replacement of concrete street panels, sidewalks, and
driveways, utility relocations, installation of sewer and water conflict boxes, and
placement of rip rap at the outfall.
| 03/31/2026 07:00 PM UTC |
|
26-8-1
123 Kelly Dr. & 222 S. Queens Dr. Drainage---------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials, for cleaning and sealing pipe joints and catch basins, removing and replacing panels, and rebuilding CB-06 to improve drainage as specified along Kelly Dr (R081005) and S Queens Dr (R081072) located in Slidell, Louisiana.
| 03/31/2026 07:00 PM UTC |
|
26-7-1
Cody Ln Drainage---------------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary for the removal and replacement of existing structures to restore proper drainage, including installing or replacing drain pipes, cleaning existing ditches, driveways, and turnouts, and completing miscellaneous related work and sod restoration as specified along Cody Ln (R020028); located in Covington, Louisiana.
| 03/31/2026 07:00 PM UTC |
|
26-17-2
Slemmer Rd Drainage Ph 2--------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing, replacing, and/or repairing drainpipes, catch basins, driveways, and sod as specified along Slemmer Rd (R03L006), located in Covington, LA.
| 04/01/2026 07:00 PM UTC |
|
26-9-1
Paradise CT Drainage------------------------------ The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by repairing sinkholes and eroded pipes as specified along Paradise Ct (R04D154), Covington, Louisiana.
| 04/01/2026 07:00 PM UTC |
|
26-13-2
Justice Center Boilers--------------------------Base Bid to include the removal of (2) existing hot water heating boilers with (1) new boiler to be replaced in a configuration similar to existing. Piping for the second boiler shall be stubbed out and capped for future replacement. A rental boiler shall be included to maintain building heating during the project. A new opening and roll door in the boiler room wall to be installed to accommodate boiler removal and installation as well as future service. The door to the loading dock area will be replaced with a pair of 3'-0" x 8'-0" hollow metal doors and hardware to accommodate boiler replacement.
| 04/08/2026 07:00 PM UTC |
|
26-18-2
2026 District 7 Road Improvements-------------
The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying road surfaces along various District 7 Parish roads.
| 04/14/2026 07:00 PM UTC |
|
26-19-2
2026 District 2, 3 Road Improvements----------
The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying, patching, and reconstructing road surfaces as specified along various District 2 and District 3 Parish roads.
| 04/14/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
522-00-17-60-2
HVAC Controllers Upgrade
| 09/26/2017 07:00 PM UTC |
|
314-00-17-58-2
2017 District 14 Road Improvements........This is a District Capital Road Improvement Project for Districts 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Browns Village Rd (R09I001) Section 27 Township 8S Range 14E; Fifth St (R09I018) Section 27 Township 8S Range 14E; Fifteenth St (R09I056) Section 27 Township 8S Range 14E; First St (R09I010) Section 27 Township 8S Range 14E; and Javery St (R09D038) Section 34 Township 8S Range 14E.
| 09/21/2017 07:00 PM UTC |
|
311-00-17-54-2
Ranch Rd & Ranch Rd Drainage ----- This is a District Capital Road Improvement Project for Districts 11. The Contractor must provide all labor, equipment, tools, testing, and materials necessary to improve the road by reconstructing the road surface. The work will also include the removal/replacement of drain pipes, cleaning/shaping/grading ditches, installing pipe headwalls, maintenance aggregate, topsoil, and hydro-seeding, as specified, along Ranch Rd (R09E050) Section 39 Township 9S Range 13E, Slidell, LA.
| 09/19/2017 07:00 PM UTC |
|
321-00-17-55-2
Building B Buildout - Public Works...Portions of the third floor of Koop Drive, Building B shall have carpet tiles and linear base installed per the manufacturer’s specifications. All materials and demolition, surface preparation and installation work shall be included.
| 09/14/2017 07:00 PM UTC |
|
015-05-17-65-2
Road Signs
| 09/14/2017 07:00 PM UTC |
|
300-00-17-57-2
Dove Park Rd. Mill and Overlay -------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
| 09/12/2017 07:00 PM UTC |
|
316-00-17-47-2
Lake Village Drainage Improvements/N. Pearl Dr Mill and Overlay.....
A. Lake Village Drainage Improvements
o Selective tree removal
o Demolition and removal of existing catch basins and storm drains.
o Installation of new junction boxes and catch basins.
o Installation of approximately 2,000 linear feet of 60” RCP storm drain and miscellaneous storm drains ranging from 15” to 24” diameter.
o Roadway repair, sidewalk construction, and driveway construction.
o Grading, erosion and sediment control, traffic control, and vegetation establishment.
B. North Pearl Mill and Overlay
o 2” mill and overlay from Station 01+38 (Gause Boulevard) to Station 44+50 (Lake Erie Drive) as shown in the Plans.
o Guardrail system at W-15 Canal crossing
o Striping
| 09/07/2017 07:00 PM UTC |
|
315-05-17-50-2
2017 Districts 6 & 5 Road Improvements.....This is a district capital road improvement project for Districts 6 & 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Firetower Rd (R06H001) Section 5 Township 7S Range 14E; St Amand St (R10C002) Section 19 Township 6S Range 12E; Sandy Ln (R04D057) Section 27 Township 7S Range 11E; and Harper Rd #2 (R06F005) Section 15 Township 7S Range 14E.
| 09/05/2017 07:00 PM UTC |
|
311-00-17-52-2
2017 District 11 Road Improvements....This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Azalea Ln (R06L005) Section 33 Township 7S Range 13E ; Red Mill Rd (R07C042) Section 28 Township 8S Range 13E (Lacombe, La.).
| 09/05/2017 07:00 PM UTC |
|
416-15-17-53-2
Lower W-15 Area Drainage Improvements...............................The completed Work will provide Owner with a regional stormwater detention pond known as the Tenet Pond. Additional details describing the work are provided in Section 01 11 00 of Division 01, Technical Specifications.
| 08/31/2017 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.