General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-40-2
Nolan Rd Ph 2--------------------Work to include subsurface drainage on both sides of Nolan Rd, in addition to widening, overlaying, and striping the entirety of the roadway. Work shall include the excavation and/or embankment, clearing and grubbing, driveway replacement, signage replacement, and hydroseeding, as specified along Nolan Rd (R10D003) Section 30 Township 7S Range 12E, located in Covington, LA.
09/22/2026 07:00 PM UTC
26-41-2
French Branch Pond Expansion------------The project consists of the construction of an approximately 47.77 acre pond and associated drainage infrastructure. The work includes, but is not limited to, construction of a stone access road; installation of inlet and outlet concrete structures; installation of subsurface drainage structures; construction of weirs and headwalls; and off-site disposal of excavated materials.
10/01/2026 07:00 PM UTC
26-42-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings
10/14/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
300-00-18-37-2
Airport Rd Mill and Overlay ----- This is a 2018 Capital Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, tools and materials necessary to improve roadway surfaces by milling and overlaying of asphaltic concrete, installing roadway striping, and improving sidewalks, as specified along Airport Rd. (R09C037) Section 33 Township 8S Range 14E in Slidell, Louisiana, and Northshore Blvd. Section 37 Township 8S Range 14E, City of Slidell.
08/15/2018 07:00 PM UTC
314-00-18-34-2
Carroll Rd. ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadway with a 2” mill and overlay as specified along Carroll Rd. (R09G062) Section 9 Township 9S Range 14E.
08/08/2018 07:00 PM UTC
301-00-18-08-2
2018 District 1 Road Improvements ----- This is a District Capital Road Improvement Project for District 1. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Camellia Dr (R01D004) Section 47 Township 7S Range 10E; Helen St (R01I007) Section 16 Township 8S Range 10E; Three Rivers Rd (R03A001) Section 48 Township 7S Range 11E; Zinnia Dr (R01D006) Section 47 Township 7S Range 10E; Adrienne St (R01H005) Section 18 Township 7S Range 10E; River Bend Dr (R03A011) Section 17 Township 7S Range 11E.
08/08/2018 07:00 PM UTC
305-00-18-11-2
2018 District 5 Road Improvements ----- This is a District Capital Road Improvement Project for District 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces, and installation of a guard rail as specified along Armel Rd (R04F009) Section 30 Township 7S Range 12E; Bayou Ct (R03L068) Section 11 Township 7S Range 11E; Marion St (R04F011) Section 20 Township 7S Range 12E; Marquette St (R04D026) Section 34 Township 7S Range 11E; Nick’s Rd (R04F055) Section 19 Township 7S Range 12E; North Ln (R04F062) Section 19 Township 7S Range 12E; Palmetto Ave (R04D007) Section 22 Township 7S Range 11E.
08/08/2018 07:00 PM UTC
310-00-18-25-2
2018 District 10 Road Improvements.......................... The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Albert St (R04E027) Section 46 Township 8S Range 11E; Caroline St (R04D170) Section 39 Township 8S Range 11E; McNamara St (R04D169) Section 39 Township 8S Range 11E; Oak St (R04D111) Section 39 Township 8S Range 11E; Orleans St (R04D172) Section 39 Township 8S Range 11E; Webster St (R04D051) Section 39 Township 8S Range 11E.
08/07/2018 07:00 PM UTC
314-00-18-33-2
2018 District 14 Road Improvements.....The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Barbara Dr (RO8U003) Section 11 Township 9S Range 14E; Beech Ave (RO8V003) Section 13 Township 9S Range 14E; Bernard Rd (R09G072) Section 9 Township 9S Range 14E; Brookter Rd (R08V008) Section 13 Township 9S Range 14E; Browns Village Rd (RO9I001) Section 27 Township 8S Range 14E; Grace Dr (RO8U007) Section 11 Township 9S Range 14E; Homer Ave (RO8U008) Section 11 Township 9S Range 14E.
08/07/2018 07:00 PM UTC
622-10-18-31-2
Colonial Court Lift Station Upgrade - Partial demolition of the existing lift station (436 Colonial Ct., Mandeville, LA 70471), installation of a new wet well and submersible duplex lift station and the conversion of the existing wet well to act as a trash and grease trap.
07/24/2018 07:00 PM UTC
314-00-18-23-2
2018 District 12 & 14 Panel Replacements ............The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by removing/replacing/repairing concrete panels and curbs as specified along Admiral Nelson Dr (R08V034) Section 23 Township 9S Range 14E; Brookter St (R08V118) Section 24 Township 9S Range 14E; Chancer Ln (R08V062) Section 24 Township 9S Range 14E; Dylan Dr (R08V068) Section 24 Township 9S Range 14E; Heather Ln (R08V048) Section 24 Township 9S Range 14E; Oak Harbor Blvd (R09J090) Section 44 Township 9S Range 14E.
07/12/2018 07:00 PM UTC
311-00-18-32-2
2018 District 11 Rd Improvements..........................The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing, milling and overlaying, overlaying with patching, and/or patching road surfaces as specified along Chinkapin Ct (R09A040) Section 30 Township 8S Range 14E; Ezell Rd (R07B003) Section 8 Township 8S Range 13E; Narcisse St (R09H010) Section 38 Township 9S Range 14E; Red Bud Ln (R09A042) Section 30 Township 8S Range 14E; S Tranquility Rd (R09E001) Section 34 Township 8S Range 13E; Tupelo St (R06G005) Section 33 Township 7S Range 14E; Chateau Dr (R09B001) Section 19 Township 8S Range 14E; Carolyn Ln (R09E010) Section 3 Township 9S Range 13E.
07/11/2018 07:00 PM UTC
308-00-18-14-2
2018 District 8 Panel Replacements ----- This is a District Capital Road Improvement Project for District 8. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by removing/replacing/repairing concrete panels and concrete rollover curbs as specified along Amber Ct (R08L058) Section 31 Township 8S Range 15E; Defiance Dr (R08I054) Section 25 Township 8S Range 14E; E Forest Dr (R08I039) Section 35 Township 8S Range 14E; Heather Dr (R08I053) Section 25 Township 8S Range 14E; Lake Ontario Ct (R08L052) Section 31 Township 8S Range 15E; Lake Village Blvd (R08L026) Section 36 Township 8S Range 15E; Meredith Dr (R08I058) Section 25 Township 8S Range 14E; Timbers Dr (R08I043) Section 26 Township 8S Range 14E; W Lake Catahoula Ct (R08L060) Section 31 Township 8S Range 15E.
07/11/2018 07:00 PM UTC
651 - 660 of 1000 Solicitations
1 2 62 63 64 66 68 69 70 99 100