General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-28-2
Harrison Ave Mill & Overlay----The Contractor shall furnish all labor, equipment, and materials necessary to perform roadway improvements as part of the Capital Improvement Project. Work shall include milling and overlaying approximately 36,000 square feet of asphaltic concrete pavement and installing roadway striping in accordance with project specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by the law.
09/17/2025 07:00 PM UTC
25-29-2
Belair Concrete Repair----The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways. Work shall include the removal, replacement, and repair of concrete panels and barrier rollover curbs as specified along the following roads: − Alexander Ct (R09A061) Slidell LA ; − Andrew Ct (R09A062) Slidell LA ; − Belair Blvd (R09A018) Slidell LA ; − Brook Ln (R09A022) Slidell LA ; − Carlin Ln (R09A058) Slidell LA ; − Cherie Ln (R09A056) Slidell LA ; − Clearpoint Dr (R09A024) Slidell LA ; − Fairway Ln (R09A021) Slidell LA ; − Golden Dr (R09A020) Slidell LA ; − Headwaters Dr (R09A019) Slidell LA ; − Madeline Ln (R09A063) Slidell LA ; − Palmetto Ct (R09A057) Slidell LA ; − Sandy Ln (R09A023) Slidell LA ; − Summertree Dr (R09A045) Slidell LA ; and − William Dr (R09A060) Slidell LA.
09/17/2025 07:00 PM UTC
25-21-2
Water Meters, Registers, Base Station, Repeaters------ St. Tammany Parish Government (STPG) Department of Utilities (DU) is seeking bids from qualified Providers for the supply of water meters, electronic read registers, base stations, repeaters, antennae, and mobile receivers. All equipment must be compatible with DU’s current software, Master Link / Data Collections, and compatible with Tyler Technologies Munis Software and Harmony Data Acquisitions for an AMI 2-way fixed network standard direct read and dialog 3G AMR to generate utility bills. STPG owns over 16,000 water meters used for monthly billing of DU water and sewer customers. New meters are purchased to provide for expansion and to replace broken meters and/or registers. All products shall be new and of current manufacture. Bids shall be for the approved make/brand or a Prior Approved Equal by STPG. STPG reserves the right to order meters and registers at any time and in any quantity with no minimum order for the duration of this term. Meters 5/8” to 2” shall meet or exceed all sections of the ANSI/AWWA C708 Standard, latest edition. Meters 2” or larger shall meet or exceed all sections of the ANSI/AWWA C715 Standard, latest edition, and be UL/FM approved. The Provider and applicable items shall also be compliant with SDWA, NSF ANSI 372 & NSF ANSI 61, latest standards. Meters shall be manufactured by a company with a minimum of fifteen (15) years’ experience in the manufacturing of water meters. All water meters and meter components shall be programmed and tested within the Continental United States of America. The manufacturer’s corporate home office shall be in the United States. Bids will be considered only from those companies that are actively engaged in the manufacture of a complete line of water meters of various types (i.e., multi-jet, ultrasonic, bottom-load jet). Meters shall be bid without connections. Water meters two-inch (2”) and below shall be magnetically driven multi-jet velocity type. Water meters two-inch (2”) and greater shall be ultrasonic type. Two-inch (2”) water meters shall be offered as magnetically driven multi-jet velocity type and/or ultrasonic type. The Department of Utilities reserves the right to request a sample meter to study prior to awarding the contract.
09/18/2025 07:00 PM UTC
25-30-2
Glendale Heights Drainage----------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage & roadways by installing catch basins and drain pipes as required in the specifications at designated locations in Glendale Heights, Mandeville, LA. 70471.
09/23/2025 07:00 PM UTC
25-6-2
Alton Water Systems Interconnect ----The work includes the construction of an interconnecting pipeline, approximately one thousand six hundred (1,600) linear feet in length, to provide a connection between the Alton Water System and an adjacent privately owned utility. All work shall be performed in accordance with the Contract Documents and as further detailed in the technical specifications.
10/07/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
318-00-17-23-2
Fairgrounds Phase 3
04/11/2017 07:00 PM UTC
307-00-17-14-2
Wax Wing Canal Improvements --------------------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by grading banks to proper slope and installing armormax anchored reinforced vegetation system as specified along Wax Wing Canal (D04EW01174) Section 55 Township 8S Range 11E.
04/07/2017 07:00 PM UTC
303-00-17-10-2
2017 District 3 Road Improvements ------ This is a District Capital Road Improvement Project for District 3. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing them as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Hay Hollow (R02F027) Section 4 Township 5E Range 10E; Penn Mill Lakes Blvd (R03D031) Section 13 Township 6S Range 10E; and Savannah Rd (R01G001) Section 4 Township 7S Range 10E.
04/04/2017 07:00 PM UTC
307-00-17-22-2
2017 District 7 Road Improvements-----------This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Cedar Dr. (R04F038) Section 7 Township 7S Range 12E; Elm St (R04F039) Section 7 Township 7S Range 12E; Hemlock Dr. (R04F037) Section 7 Township 7S Range 12E; Joans St (R04E056) Section 1 Township 8S Range 11E; Labarre St (R04E026) Section 38 Township 8S Range 11E; and Redwood Dr. (R04F040) Section 7 Township 7S Range 12E . The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is sixty (60) calendar days + Calculated Rain Days per attached specifications.
04/04/2017 07:00 PM UTC
015-05-17-17-2
Road Signs
03/23/2017 07:00 PM UTC
015-60-17-16-2
Windshield Repair/ Replacement
03/23/2017 07:00 PM UTC
316-00-17-11-2
Cross Gates Pond Improvements................................. This is a 2017 Capital Drainage Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve drainage by installing a concrete wet well, a submersible pump, associated drainage equipment/features, related mechanical and electrical equipment, and embankment as specified at the Cross Gates Pond (P08LW01069) Section 38 Township 9S Range 15E.
03/21/2017 07:00 PM UTC
306-00-17-09-2
2017 District 6 Road Improvements..................................... This is a District Capital Road Improvement Project for District 6. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Becky Lake Dr (R06C010) Section 40 Township 6S Range 14E; Chat Ct (R05B044) Section 27 Township 5S Range 12E; Dolph Gaines (R06E009) Section 27 Township 7E Range 14E; Marcus Rd (R05G026) Section 33 Township 4S Range 13E; O Wager Rd (R10B017) Section 10 Township 6S Range 12E; S Davis Rd (R10B016) Section 10 Township 6S Range 12E; Tot Polk Rd (R06I013) Section 39 Township 6S Range 14E; Warrior Trace (R02U003) Section 11 Township 5S Range 11E; and Wilson Ln (R06I012) Section 38 Township 6S Range 14E.
03/15/2017 07:00 PM UTC
309-00-17-08-2
2017 District 9 Road Improvements---------------This is a District Capital Road Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Audubon St (R08G009) Section 31 Township 8S Range 15E; Autumn Lakes Rd (R08N097) Section 38 Township 9S Range 15E; Blackbeard Dr (R08N043) Section 17 Township 9E Range 15E; Doubloon Dr (R08N042) Section 17 Township 9S Range 15E; Pearl River St (R08N014) Section 38 Township 9S Range 15E; Waverly Dr (R08L068) Section 38 Township 9S Range 15E; and Walnut St (R08G002) Section 31 Township 8S Range 15E.
03/14/2017 07:00 PM UTC
310-00-17-07-2
2017 Districts 5 & 10 Road Improvements This is a District Capital Road Improvement Project for Districts 5 & 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Strain Rd (R04F001) Section 19 Township 7S Range 12E ; America St (R04E331) Section 38 Township 8S Range 11E ; and Orleans St (R04E129) Section 38 Township 8E Range 11E.
03/13/2017 07:00 PM UTC
651 - 660 of 905 Solicitations
1 2 62 63 64 66 68 69 70 90 91