General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-12-2
Lower Tchefuncte Breakwater Restoration----- The scope of work shall include constructing approximately 800’ coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
12/17/2025 08:00 PM UTC
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/06/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/08/2026 08:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
315-45-17-43-2
2017 District 4 Road Improvements.... This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Copal St (R04C032) Section 45 Township 8S Range 11E; Northlake Dr (R03K061) Section 45 Township8S Range 11E; and Dogwood Dr (R03K020) Section 37 Township 7S Range 11E.
06/27/2017 07:00 PM UTC
622-10-17-35-2
Submersible Pump Annual.....This is not a new bid - previous bid inadvertently closed. The Parish, as a function of Tammany Utilities, owns and operates approximately 50 wastewater treatment plants, 40 water wells, over 200 sewage lift stations and miles of water distribution and sewage collection lines. Tammany Utilities, therefore, routinely has the need for submersible pumps.
06/15/2017 07:00 PM UTC
310-00-17-42-2
Marigny Avenue Drainage Improvements........................ The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, and performing drainage excavation on Marigny Avenue (R04E115) Section 38 Township 7 South Range 11.
06/14/2017 07:00 PM UTC
300-00-17-36-2
Dove Park Rd. Mill and Overlay ---------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
06/13/2017 07:00 PM UTC
622-10-17-35-2
Submersible Pump Annual.....The Parish, as a function of Tammany Utilities, owns and operates approximately 50 wastewater treatment plants, 40 water wells, over 200 sewage lift stations and miles of water distribution and sewage collection lines. Tammany Utilities, therefore, routinely has the need for submersible pumps.
06/08/2017 07:00 PM UTC
315-05-17-38-2
2017 District 6 Road Improvements ---------- This is a District Capital Road Improvement Project for District 6. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing road surfaces, as specified, along Sunny Meadow Dr (R10F003) Section 28 Township 6S Range 12E ; and Keen Rd (R10F002) Section 28 Township 6S Range 12E.
06/06/2017 07:00 PM UTC
313-00-17-41-2
Ranch Rd. Drainage Ph 1...... The Contractor will provide all labor, equipment, tools, and materials necessary to improve drainage by the removal of existing drainage structures and drives and for the installation of drainage structures, drives, and pavement patching.
06/06/2017 07:00 PM UTC
300-00-17-40-2
Tchefuncte Parc Bridge at Black River.....The Contractor must provide all labor, equipment, tools, and materials necessary for the removal of timber trestle bridge on timber piles, asphalt paving, installation of class II base course, prcb culvert, concrete headwalls, and incidental sanitary sewer relocation.
05/31/2017 07:00 PM UTC
622-10-17-34-2
Sewer and Appurtenances Annual
05/17/2017 07:00 PM UTC
302-00-17-32-2
Woodland Dr Road Improvements.......................................... The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing the road surface and applying an asphalt reinforcement grid, as specified.
05/16/2017 08:02 PM UTC
651 - 660 of 932 Solicitations
1 2 62 63 64 66 68 69 70 93 94