General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-10016.1
Structure Replacement Bridge No. 09-0066 McGeorge Rd over Alex Branch Forest District 09, Moshannon State Forest Lawrence Township, Clearfield County, Pennsylvania This project consists of demolition of existing corrugated metal pipe arch structure and stone wingwalls carrying McGeorge Road over Alex Branch and replacement with a single cell precast reinforced concrete box culvert. Other work includes rock lining, architectural surface treatment, DSA approach roadway, and guide rail. DGS Small Business Certification Required Engineer's Estimate: $300,000-$550,000
09/25/2025 05:00 PM UTC
FDC-016-10759.1
Structure Replacements & Preservation Bridge A: No. 16-0043 Landrus Road OVER UNT to Babb Creek Bridge B: No. 16-0044 Landrus Road over Bear RUN Bridge C: No. 16-0045 Landrus Road over Silver Run Forest District 16, Tioga State Forest Bloss Township, Tioga County, Pennsylvania This project is the replacement two corrugated metal pipe culverts and a preservation of a corrugated metal pipe culvert along Landrus Road. Bridge A replacement will consist of a corrugated galvanized steel pipe arch culvert with flared concrete end sections. Bridge B replacement will consist of an integral abutment bridge with a composite prestressed concrete spread box beam superstructure. Bridge C preservation will consist of paving the invert/flowline of the pipe to eliminate further pipe invert deterioration and loss of bearing material beneath the pipe invert and placement of riprap for scour protection. SDB Participation Goal: 21% VBE Participation Goal: 3% Engineer's Estimate: $1,000,000-$ 2,000,000
09/25/2025 05:00 PM UTC
FDC-015-10031.1
Structure Replacement Bridge No. 15-9006 Horton Run Road Over UNT to Horton Run Forest District 15, Wharton Township, Potter County Pennsylvania Demolition of the existing structure consisting of a single span reinforced concrete slab superstructure supported on stone masonry abutments. This structure will be replaced a precast reinforced concrete box culvert with a precast reinforced concrete end section (downstream) and two precast reinforced concrete wingwalls (upstream). DGS Small Business Certification Required Engineer's Estimate: $350,000-$550,000
09/25/2025 05:00 PM UTC
FDC-009-10014.1
Structure Replacement, Bridge A No. 09-0062, Wallace Mine Road Over UNT to Alex Branch, Bridge B No. 09-0065, Wallace Mine Road Over UNT to Trout Run, Forest District 09, Moshannon State Forest, Lawrence & Goshen Townships, Clearfield County, Pennsylvania Bridge A: replacement of a corrugated metal pipe with precast reinforced concrete pipe with precast reinforced concrete end sections. Bridge B: replacement of a smooth wall corrugated high-density polyethylene pipe with precast reinforced concrete pipe with precast reinforced concrete end sections. DGS Small Business Certification Required Engineer's Estimate: $100,000.00 - $500,000.00
10/09/2025 05:00 PM UTC
FDC-013-10029.1
Structure Replacements, Bridge No. 13-0078, Simons Lane Over Bender Run, Bridge No. 13-0079, Simon Lane Over Portable Run, Forest District 13, Elk State Forest, Shippen Township, Cameron County, Pennsylvania This project will replace two (36” and 48” diameter) corrugated metal pipe culverts on Simons Lane. The existing culverts are both undersized, misaligned with their respective stream channel, and are in poor condition or collapsing. The proposed replacement structures are 6’-0” and 12’-0” precast reinforced concrete box culverts and end sections. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $500,000.00 - $1M
10/09/2025 05:00 PM UTC
FDC-007-10055.1
Structure Replacement, Bridge No. 07-9011, Pine Creek Hollow Road Over UNT to Pine Creek, Forest District 07, Bald Eagle State Forest, Haines Township, Centre County, Pennsylvania This project consists of the demolition of existing corrugated metal pipe arch structure and stone wingwalls and replacement with a precast reinforced concrete rigid frame. Other work includes rock lining, channel lining, architectural surface treatment, guide rail and driving surface aggregate (DSA) approach roadway. DGS Small Business Certification Required Engineer's Estimate: $500,000.00 - $1M
10/09/2025 05:00 PM UTC
FDC-326-10983.1
Iron Master's Mansion Rehabilitation, Susquehanna Riverlands State Park, Hellam Township, York County, Pennsylvania Rehabilitate the Iron Master's Mansion exterior shell and do selective demolition on the interior of the building. SDB Participation Goal 13% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
10/09/2025 05:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
FDC-422-102768.1
PM Septic Tank Repair/Replacement Nockamixon State Park Haycock Township, Bucks County Project Description: Work includes the complete construction and start-up of a new residential sandmound style septic sewage disposal system at the Nockamixon State Park Deerwood Lane Residence DGS Small Business Certification Required Engineer's Estimate:30,000-60,000
06/27/2024 06:00 PM UTC
FDC-407-103143.1
Stream Assessment/Streambank Stabilization Jacobsburg Environmental Education Center Bushkill Township, Northampton County, Pennsylvania Work includes the complete construction of streambank stabilization and stream restoration measures along a 1,600 linear feet section of Bushkill Creek, located at the Jacobsburg Environmental Education Center. The Contractor will construct all streambank stabilization and stream restoration features in accordance with the plans, cross sections and details. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
06/13/2024 06:00 PM UTC
FDC-012-103509.1
Tomb Flats - ADA Fishing Access Forest District 12, Tiadaghton State Forest Brown Township, Lycoming County Pennsylvania The work under this project consists of constructing a new ADA fishing platform, ADA parking, concrete walkways, a concrete boat ramp extension, and other miscellaneous site improvements at Tomb Flats Campground in Tiadaghton State Forest. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
06/06/2024 06:00 PM UTC
FDC-128-10325.1
Structure Repairs, Bridge No. 6128-1600 Kinzua Gorge Overlook Over Kinzua Gorge Kinzua Bridge State Park Hamlin Township, McKean County, Pennsylvania Perform a restoration of the existing Kinzua Gorge Overlook over the Kinzua Gorge (6128-1600). The work will include removal and replacement of the timber deck, railings and glass floor system, structural steel repairs to the girders and towers, replacement of girder bearings at the abutment, replacement of girder bearings at select towers, cleaning and painting of the structural steel, and other miscellaneous work. SDB Participation Goal 5% VBE Participation Goal 3% Engineer's Estimate: Over $1M
05/30/2024 06:00 PM UTC
FDC-210-04405.4R
Replace Bike Rental Concession Building and Public Restrooms Moraine State Park Worth Township, Butler County, Pennsylvania Work included under this Contract consists of installation of a new electrical service entrance for a new concession building at Moraine State Park. Major items of work include demolition of existing electrical facilities, as required, and coordination and installation of new electrical service entrance for the building. This is a design build contract that requires design documents and permitting prepared by the electrical contractor and, coordination with the General Contractor to prepare an overall set of construction plans. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
05/30/2024 06:00 PM UTC
FDC-461-10174.1
Ida Flood Repairs at Bowmans Hill Wildflower Preserve Washington Crossing Historic Park. Solebury and Upper Makefield Townships Bucks County, Pennsylvania Project Description: The work under this project consists of providing and installing a propane gas packaged engine generator system at the District Office on the grounds of Sproul State Forest DGS Small Business Certification Required Engineer's Estimate:100,000-200,000
05/16/2024 06:00 PM UTC
FDC-020-102683.4
Emergency Backup Power Hillsgrove HQ Forest District 20, Loyalsock State Forest Hillsgrove Township, Sullivan County The work under this project consists of providing and installing a diesel packaged engine generator system at the Hillsgrove Maintenance Headquarters on the grounds of Loyalsock State Forest (4 Dry Run Road, Hillsgrove, PA). DGS Small Business Certification Required Engineer's Estimate: $100,00 - $500,000
05/16/2024 06:00 PM UTC
FDC-010-100893.4
District Office Generator Forest District 10, Sproul State Forest Noyes Township, Clinton County Project Description The work under this project consists of providing and installing a propane gas packaged engine generator system at the District Office on the grounds of Sproul State Forest DGS Small Business Certification Required Engineer's Estimate:100,000-200,000
05/16/2024 06:00 PM UTC
FDC-306-11035.1
Bituminous Roadway Repairs Gifford Pinchot State Park Warrington Township, York County, Pennsylvania Project Description: Work includes the placement of 9.5mm Superpave Wearing Course, 19mm Superpave Binder Course, 25mm Superpave Base Course, and 2A Aggregate. Additional work includes excavation, culvert installation, inlet installation, tack coating, shoulder back up, pavement demolition, and pavement markings. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $ 1 Million
04/25/2024 06:00 PM UTC
FDC-143-101480.1
Cherry Springs Astronomy Programming Area Rehabilitation Cherry Springs State Park West Branch Township Potter County, Pennsylvania Project Description: The work under this project consists of the development and construction of the Pavilion, Contact Building, Water Treatment Building, new access roads, parking areas, sidewalks, landscaping and associated utilities. SDB Participation Goal: 8% VBE Participation Goal: 3% Engineer's Estimate: Over $1 Million
04/25/2024 06:00 PM UTC
111 - 120 of 199 Solicitations
1 2 8 9 10 12 14 15 16 19 20