General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
CP1303287-Student Services Building-East Wing Ground Floor Remodel
This project will remodel multiple rooms, hallways and stairwells in the East Wing of the Student Services Building. The scope of work includes, but is not limited to, patching and painting; new flooring; new upper and lower cabinets; new furniture, tables, and chairs; new cabinetry; and new carpet and blinds.
05/05/2026 07:01 PM UTC
CP1311894-Veterinary Medical Research Institute Animal Holding #40-85kW Generator Replacement
This project will replace the existing 85kW indoor open-frame natural gas generator in VMRI 40 with a similarly sized outdoor natural gas generator with weather and sound-insulated housing. The scope of work includes installing a concrete pad, removing and replacing the generator, and reconfiguring all related electrical connections to meet current codes. Patch and repair the existing hole, and grade and seed.
05/05/2026 07:01 PM UTC
CP1289132-Reiman Gardens Conservatory-Boilers-Replacement
This project will remove and replace four existing boilers; increase the size of existing concrete curbs to support new equipment; install a new domestic water heat exchanger and all associated electrical, plumbing, and gas piping to complete the work.
05/07/2026 07:01 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
CP002412 - Curtiss Hall-Third Floor Renovation
The project consists of, but is not limited to, the alteration of a classroom, office areas, and public hallways on the 3rd floor of Curtiss Hall.
01/24/2019 08:01 PM UTC
CP002492 - Scheman Building-Brunnier Art Museum-Storage and Entrance Remodel
The project consists of, but is not limited to, renovation of permanent collection storage and museum entrance including installation of high density compact storage units, installation of LED lighting, alteration of walls at museum entrance, updated materials and finishes at museum entrance, and remodel of existing office space to accommodate a second exit from the suite.
01/17/2019 08:01 PM UTC
CP002467 - Food Sciences Building-Room 2379 Renovation
The project consists of, but is not limited to, renovation of a teaching classroom, with general, mechanical, and electrical construction in adjacent areas to modify services to serve the classroom. Project includes roof modifications and patching.
12/13/2018 08:01 PM UTC
CP002487-Helser Residence Hall-Window Replacement
This project consists of, but is not limited to, the installation of new aluminum windows throughout Helser Residence Hall to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction where necessary to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
12/13/2018 08:01 PM UTC
CP002536 - Science Hall 2-Rooms 0220, 0224 and 0228 Remodel
The remodel will convert one wet lab, a teaching prep room, and a small classroom into one larger multi-purpose room. The work will include, but is not limited to, demolishing dividing walls and modifying the mechanical and electrical systems as required; installing new acoustical lay-in ceiling grid and tile, light fixtures, carpet, whiteboards, and technology.
11/15/2018 08:01 PM UTC
CP002519 - Institutional Roads 2019-University Boulevard and Wallace Road Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards at the intersection of University Boulevard and Wallace Road on the Iowa State University campus. Scope of work includes new signal poles, heads, controllers, count down timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing and ADA compliant crosswalk controls.
11/08/2018 08:01 PM UTC
CP002529 - Gilman Hall-Rooms 2659, 2701, and 2705 Remodel
The project consists of, but is not limited to, remodeling existing laboratories into office space.
11/08/2018 08:01 PM UTC
CP002488 - Birch-Welch-Roberts-Residence Halls-Window Replacement
This project consist of, but is not limited to, the installation of new aluminum windows throughout Birch, Welch, and Roberts Residence Halls to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
11/01/2018 07:01 PM UTC
CP002511 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 3
The project consists of, but is not limited to, the removal and replacement of fifty-five (55) fan coil units and accessories. Complete installation per each unit(s) in a single room to be completed in three (3) work days. Work involves installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
10/23/2018 07:01 PM UTC
CP002411 - Curtiss Hall-Second Floor Renovation
The Project consists of the alteration of public hallways and office areas on second floor of Curtiss Hall, including the addition of a single use restroom, lactation room, and custodian’s closet.
09/27/2018 07:01 PM UTC
331 - 340 of 399 Solicitations
1 2 30 31 32 34 36 37 38 39 40