CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
11/11/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002479 - Music-AHU2 Humidification System Replacement
The project consists of, but is not limited to, replacing the existing supply air handling unit including: cooling/dehumidifying coil, heat/reheat coil, blower, and direct-injection humidifier. The project also includes electrical power for new humidifier and new AHU Johnson Controls.
04/10/2018 07:01 PM UTC
CP002458 - Union Drive Community Center-Clyde's Dining Renovation
The project consists of, but is not limited to, renovated seating/dining area, renovated serving stations, renovated back-of-house (BOH) space that includes foodservice kitchen and dry storage, new interior entrances with overhead coiling security grilles from adjacent building spaces, renovated vestibule, of an existing foodservice and dining facility in Union Drive Community Center.
03/29/2018 07:01 PM UTC
CP002418 - Memorial Union-Dining Services Central Space Remodel
The project consists of, but is not limited to, renovation of the central food court space located on the first floor of the Memorial Union. Scope includes a new food service salad bar, counters, POS stations and food service equipment. Finish upgrades to include new flooring tile, wall finishes, and an acoustic ceiling tile cloud. A new security grille will be installed at the main entry. The project includes limited scope within each of the five venues serving the food court. This includes replacement of existing acoustic ceiling tile and grid, minor painting, and patching of fiber reinforced plastic paneling. Scope of work also includes mechanical and electrical construction in adjacent areas to modify services to serve the space. Some services will be routed through excavated tunnels below.
03/27/2018 07:01 PM UTC
CP002446 - Zaffarano Physics Addition-Exterior Repairs
The project consists of, but is not limited to: 1. Cleaning of existing precast and masonry. 2. Removal of all existing sealant and backer rods. 3. Patch precast concrete panels. 4. Masonry tuckpointing. 5. Install new sealant and backer systems. 6. Repair soffits.
03/22/2018 07:01 PM UTC
CP002475 - Utilities-South Campus-No. 1 Feeder Replacement
The project consists of, but is not limited to, installing new 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations on above ground switchgear and transformer. Perform hi-pot cable tests on installed cable, splices, and terminations. De-energize and remove existing abandoned cable after new cable is installed.
03/15/2018 07:01 PM UTC
CP002422 - Hilton Coliseum Parking Expansion
The project consists of, but is not limited to, removal of existing HMA and PCC pavement, new HMA pavement with PCC curb and gutter and reclaimed HMA base, PCC sidewalks, storm sewer structures and piping, bioswale, parking lot and sidewalk lighting as well as upgrades to the lighting distribution system, telecom panel and raceway for TV truck connections on site, wayfinding and parking stall signage, gate installation, pavement markings and finish grading/topsoil.
03/13/2018 07:01 PM UTC
CP002404 - Parking Lot 96-Expansion
The project consists of, but is not limited to, sidewalk removal, street lights removal/replacement, pedestrian lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, electric vault lid replacement, storm sewer intakes, storm sewer piping, PCC sidewalk, PCC curb and gutter, HMA parking lot paving, traffic control and other associated work for a parking lot expansion project on the west side of the Veterinary Medicine campus at Iowa State University in Ames, Iowa.
03/08/2018 08:01 PM UTC
CP002379-Parks Library-Restroom Renovations
The project consists of, but is not limited to, renovation of existing restroom facilities within the 1960’s portion of Parks Library. Renovation includes two (2) stacks of restrooms, with restrooms located on four floors. New restrooms will be inserted into locations on First and Fourth floors which are not currently restrooms. Project also includes reconfiguration of underground sanitary sewer, connection of piping to new owner furnished water heater, and tie-in of existing water softener to new water heater.
03/06/2018 08:01 PM UTC
CP002363 - Reiman Gardens-Southwest Corner Improvements-Landscaping
The project consists of, but is not limited to, construction of plant gardens, connecting paths, water features, a single restroom building with mechanical space, a 40’ tall steel and wood tower, and associated earth work and utility services.
03/01/2018 08:01 PM UTC
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Irrigation and Turf
The project consists of, but is not limited to, installation of athletic field irrigation system, removal of existing field organic material, installation and establishment of new natural turf.
02/22/2018 08:01 PM UTC