CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
07/22/2025 07:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP002379-Parks Library-Restroom Renovations
The project consists of, but is not limited to, renovation of existing restroom facilities within the 1960’s portion of Parks Library. Renovation includes two (2) stacks of restrooms, with restrooms located on four floors. New restrooms will be inserted into locations on First and Fourth floors which are not currently restrooms. Project also includes reconfiguration of underground sanitary sewer, connection of piping to new owner furnished water heater, and tie-in of existing water softener to new water heater.
03/06/2018 08:01 PM UTC
CP002363 - Reiman Gardens-Southwest Corner Improvements-Landscaping
The project consists of, but is not limited to, construction of plant gardens, connecting paths, water features, a single restroom building with mechanical space, a 40’ tall steel and wood tower, and associated earth work and utility services.
03/01/2018 08:01 PM UTC
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Irrigation and Turf
The project consists of, but is not limited to, installation of athletic field irrigation system, removal of existing field organic material, installation and establishment of new natural turf.
02/22/2018 08:01 PM UTC
CP002447 - Hamilton Hall-Window Replacement-Phase 2
The project consists of, but is not limited to, furnish and install new aluminum window system at areas indicated. Windows will be removed and disposed of by Owner’s abatement contractor. Coordinate removal of existing window assemblies and installation of new windows with Owner’s abatement contractor. Remove and reinstall existing window shades/blinds. Patch and paint adjacent walls as needed due to window replacement.
02/15/2018 08:01 PM UTC
CP002394 - Beardshear Hall-Air Handling Unit Replacement
The project consists of, but is not limited to, the removal and demolition of the existing air-handling unit in the mechanical space and the installation of a new air-handling unit in the same location
01/30/2018 08:01 PM UTC
CP002443 - Welch Avenue-CyRide Turnaround
The project consists of, but is not limited to, sidewalk removal, street & sidewalk lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, PCC sidewalk, PCC curb and gutter, PCC street paving, traffic control and other associated work for a bus turnaround project near the intersection of Welch Avenue and Storm Street in Ames, Iowa on the Iowa State University campus.
01/30/2018 08:01 PM UTC
CP002436 - Friley Residence Hall Window Replacement
The project consists of, but is not limited to the installation of new aluminum windows throughout Friley Hall to replace existing windows removed under separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during multiple phases during summers only – see Construction Progress Schedule and substantial completion dates.
01/25/2018 08:01 PM UTC
CP002409 - Barton-Lyon-Freeman-Roof Replacements
The project consists of roof replacement work at Barton, Freeman and Lyon Residence Halls. Work consists of, but is not limited to, removal of slate roof system, slate dormer sidewall tiles, dispose. Remove metal gutters and downspouts, dispose. Install new metal gutter and downspouts. Install new asphalt shingle roof system over ice and water shield membrane and roofing accessories. Repair and/or replace damaged wood items as indicated in documents.
01/23/2018 08:01 PM UTC
CP002249 - MacKay Hall-Center Wing Window Replacement
The project consists of, but is not limited to, the replacement of 23 window assemblies and 3 door assemblies on the south side, center wing of MacKay Hall. Windows are on the basement, first, and second floors and shall be replaced with metal clad wood windows.
01/18/2018 08:01 PM UTC
CP002324 - Utilities-Chilled Water West Campus Distribution Improvements
The project consists of, but is not limited to, installing new underground utilities consisting of 24 inch chilled water supply and return piping, 12 inch to 42 inch storm sewer system with associated roadway intakes, 10 inch domestic water main, 10 inch sanitary sewer, a steam tunnel extension and underground electrical system for site lighting all under Bissell Road and the adjacent sidewalks from Osborn Drive to Union Drive. Additionally the project includes complete replacement Bissell Road, adjacent sidewalks and all new site lighting for areas affected by the underground utilities.
01/18/2018 08:01 PM UTC