Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP002357 - Osborn Drive Sidewalk Widening-Phase Three-East Corridor
The project consists of, but is not limited to, curb and sidewalk removal, PCC sidewalk install, colored sidewalk install, major and minor manhole adjustments, installation of electrical conduit and wire, curb and gutter install, light pole installation and electrical vault lid replacement.
| 12/07/2017 08:01 PM UTC |
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Site Electrical and Lighting
The project consists of, but is not limited to, installation of electrical service, field lighting and lighting controls associated with recreation playing fields.
| 12/05/2017 08:01 PM UTC |
CP002435
Knoll-Exterior Repairs-Roof Replacement - The project consists of, but is not limited to, replacement of the roof to maintain the integrity of the Knoll.
| 11/30/2017 08:01 PM UTC |
CP002445
Zaffarano Physics Addition-Fan Coil Replacement-Phase 2
The project consists of, but is not limited to, the removal and replacement of forty-four (44) fan coil units and accessories.
| 11/14/2017 08:01 PM UTC |
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.01 GENERAL TRADES- The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
| 11/09/2017 08:01 PM UTC |
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.02 METAL FRAMING, GYP, and ACP - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
| 11/09/2017 08:01 PM UTC |
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.03 ACCESS FLOORING - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
| 11/09/2017 08:01 PM UTC |
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.04 SHEETMETAL and ROOFING - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
| 11/09/2017 08:01 PM UTC |
CP002427
College Creek-Bank Erosion Repair -
The project consists of, but is not limited to, bank grading, excavation, and installation of rip rap to stabilize eroding creek bank. Work includes storm sewer piping, intake installation, sidewalk removal, sidewalk replacement and all associated erosion control measures required to protect slopes.
| 10/17/2017 07:01 PM UTC |
CP002425
Veterinary Medicine-Domestic Water Line Replacement-Phase 3 - The project consists of, but is not limited to, extensions of the domestic water service and additional piping to facilitate future work to the existing domestic water service. Provide new valves, piping, piping accessories, insulation and other items required to complete the system.
| 10/12/2017 07:01 PM UTC |