Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WC0227 Milwaukee County Courthouse Elevator Modernization
The elevators in the Milwaukee County Courthouse need to be modernized. This project addresses the modernization of 13 elevators.
The Mandatory Pre-Bid Meeting is on Monday, 02/24/25 from 10:00am - 12:00pm at 901 N 9th St, Milwaukee, WI 53233 Room G1. Pre-Registration is Required. for this meeting. Please contact Martina Foss Ashworth at mfoss@millerdunwiddie.com to register.
Project Contact: Martina Foss Ashworth
Contact Email: mfoss@millerdunwiddie.com
| 04/10/2025 07:00 PM UTC |
WA0413 MKE Rehabilitate Bullseye
This project is for the rehabilitation of pavements and shoulders
inside hold lines of Runways 1L-19R and 7RL-25L at Milwaukee
General Mitchell International Airport (MKE).
Project Completion: The number of consecutive calendar days the contractor has available to substantially complete the project, excluding punch list items is 165 Calendar Days. The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates close in proximity.
Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM
Pre-Bid meeting will be done virtually via Teams. To acquire the
meeting link to the pre bid meeting, please contact Kwame
Amegashitsi at kamegashitsi@mitchellairport.com prior to
Monday, March 24, 2025, at 5:00PM. Later requests are not
guaranteed a timely response.
| 04/16/2025 07:00 PM UTC |
WA0400 MKE North Ramp Rehabilitation
This project is for the rehabilitation of the North Apron at
Milwaukee Mitchell International Airport (MKE). This project
involves an asphalt mill & overlay, storm sewer structure
replacement and pavement marking.
Additive Alternate: WA0417 MKE Rehabilitate Taxiway F
This project is for the rehabilitation of Taxiway F between
Runways 1L/19R and 7L/25R at Milwaukee Mitchell International
Airport (MKE).
Project Completion: If MKE North Ramp Rehabilitation is awarded, the contractor shall have a total of 137 calendar days to substantially complete the project, excluding punch list. If additive alternative, MKE Rehabilitate Taxiway F is awarded, no additional calendar days will be awarded to the contract:
Base Bid Only = 137 Calendar Days
Base Bid + Alternate = 137 Calendar Days
The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates in close proximity.
Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM
Pre-Bid meeting will be done virtually via Teams. To acquire the
meeting link to the pre bid meeting, please contact Kwame
Amegashitsi at kamegashitsi@mitchellairport.com prior to
Monday, March 24, 2025, at 5:00PM. Later requests are not
guaranteed a timely response.
| 04/16/2025 07:00 PM UTC |
Number | Deadline |
---|---|
O889-20190: Marcus Center For The Performing Arts Pedestrian Pavement Replacement
Contract 1: Pedestrian Pavement Replacement
Work consists of reconstructing the east/main entrance to the Marcus Center and along the Milwaukee River/west side of the Peck Pavilion. Safety bollard, cable barrier, and decorative colored concrete will be utilized as indicated in the project Bid documents.
Pre-Bid Meeting: One Pre-Bid meeting will take place on July 14th, 2021 at 1:00 PM at the Marcus Center (outside under the main entry canopy along North Water Street), 929 N. Water Street, Milwaukee, WI 53202. This will be an in-person meeting, please bring masks and follow COVID guidelines. It is strongly recommended that the contractors attend, but it is not mandatory.
| 07/21/2021 07:00 PM UTC |
9525-21405-04: 2021 Time and Material Zoological Gardens
Contract 4: Electrical
| 07/14/2021 07:00 PM UTC |
9525-21405-05: 2021 Time and Material Zoological Gardens
Contract 5: Fences and Gates
| 07/14/2021 07:00 PM UTC |
9525-21405-06: 2021 Time and Material Zoological Gardens
Contract 6: General Construction
| 07/14/2021 07:00 PM UTC |
9525-21405-07: 2021 Time and Material Zoological Gardens
Contract 7: Metal Fabrication
| 07/14/2021 07:00 PM UTC |
9525-21405-08: 2021 Time and Material Zoological Gardens
Contract 8: Plumbing
| 07/14/2021 07:00 PM UTC |
9525-21405-09: 2021 Time and Material Zoological Gardens
Contract 9: Roofing
| 07/14/2021 07:00 PM UTC |
M051-20160: MPM - North Stairwell Structural Wall Repair - Phase 2
Contract 1: Bid Package 1
1. Water penetration in the stairway vestibule and stairwell has caused corrosion resulting in loss of section properties of the supporting angle. Though not visible, the anchors for this area are suspected for being corroded as well. Cracks in the wall adjacent to the vestibule door are likely due to shifting of the slab above the door and poor placement of reinforcement at the door jamb/header interface. The anchors supporting the mezzanine floor slab above the ground level men's toilet room are failing, likely due to a combination of inadequate embedment of anchors and minor shifting of the slab relative to the north wall.
2. Provide a new structural support for the MacArthur Square slab above stairway vestibule and stairwell. Replacing the existing deteriorated supporting angle as the means of primary structural support.
3. New waterproofing is required of the MacArthur Square slab to stop water penetration into the stairway vestibule and stairwell.
4. To provide a new means of support for the mezzanine floor slab above the ground level Men's Toilet Room.
Pre-Bid Meeting: May 10, 2021 at 1:30 P.M at Milwaukee Public Museum, 800 West Wells Street, Milwaukee, WI 53233, Student Lunchroom-Ground Level.
| 05/19/2021 07:00 PM UTC |
P628-17635-03: Brown Deer Park Roadway Reconstruction
Contract 1: Roadway Reconstruction (Phase 3)
Work consists of reconstructing the perimeter road (loop drive), west lot, east lot, new share-use path, new on-street perpendicular parking, new concrete curb and gutter, new concrete ribbon, new drainage structures and storm sewer pipes, asphalt pavement, permeable pavers, bio-filtration basins, landscaping, and LED lighting as indicated in the project Bid documents.
Pre-Bid Meeting: One Pre-bid meeting will take place on April 28, 2021, at 10:30 A.M., at the Brown Deer Park Golf Clubhouse, 7625 N. Range Line Road, Milwaukee, WI 53209. Meeting will also be available over Microsoft Teams Meeting/call in (by invite only). Request invite via email or phone for Teams Meeting/call in to Clifton Janssen at Clifton.Janssen@milwaukeecountywi.gov or 414-639-8429.
| 05/12/2021 07:00 PM UTC |
C225-20183 - Courthouse Light Court #3 & Phase 2 Facade Repair
Contract 1: Bid Package 1
Window replacement in Light Court #3 shall be limited to only the south elevation, which will be base-bid work. This entails removal of existing window systems, disassembling of the existing exterior ductwork as needed for window removal, and structural support of existing exterior ductwork directly penetrating existing window openings on the south elevation of Light Court #3 only. At existing openings, a new window replacement will be installed within the existing opening. After it is in-place the existing ductwork shall be re-assembled and new ductwork supports added and/or repair of existing of existing ductwork supports as detailed. Part - 1 base bid work shall be limited to the south elevation of Light Court #3.
Part - 2: Courthouse Limestone Facade Repair - phase 2 encompasses the following the base-bid work:
Area of Work 1: North Elevation
Replace built-in copper gutter at sixth floor cornice. Replace damaged cornice stones at sixth-floor cornice as designated by A/E. Refer to sheet A300. Refer to photo no.1/A501.
Area of work 2: (Low) Northeast Corner
Rebuild brick and limestone cladding at corner. Refer to details 1 and 5/A301.
Area of work 3: (High) Northeast Corner Cornice
Salvage and reset displaced stones at cornice. Similar to details on sheet A302. Refer to details 6 and 7/A301.
Area of Work 4: (Low) Southeast Corner
Rebuild brick and limestone cladding at corner. Refer to detail 2 and 5/A301.
Area of Work 5: (High) Southeast Corner Cornice
Salvage and reset displaced stones at cornice. Similar to details on sheet A302. Refer to photo 7/A501
Area Work 6: Built-in Gutter Replacement
Replace built-in gutter and associated sealants at sixth floor and seventh floor cornices at east elevation. Refer to details 1 and 2/A303.
Pre-Bid Meeting: 633 W. Wisconsin Avenue - Room 730, Milwaukee, WI 53203. Todd M. Beamer Memorial Training Center on April 14, 2021 at 1:30 PM.
| 04/28/2021 07:00 PM UTC |