Number Deadline
WP074801: Oak Leaf Trail Connectivity - Bender Park
Work of the Project includes building a 10-foot-wide asphalt shared-use path approximately 1.33 miles long. Work includes earthwork, storm sewer, concrete ramps, biofilter, signage, native seeding and plants. Optional Pre-Bid Meeting: Wednesday October 15th, 2025, at 1:30 PM. Meet outside near the boat launch at Bender Park, 4503 E. Ryan Road, Oak Creek, WI 53154.
11/06/2025 08:00 PM UTC
5740-26999-01: Job Order Contracting (JOC) - General Construction
5740-26999-01: Job Order Contracting (JOC) General Construction Optional Pre-Bid Meeting: November 12, 2025 at 2:00pm. Meet in person at The Avenue, 275 W. Wisconsin Ave., 2nd Floor, Intersection Conference Room, Milwaukee, WI. OR Meet virtually via Microsoft Teams link: https://teams.microsoft.com/meet/2408489376002?p=MQBHkeJo08qsdPNSYa Attendance to either option is highly encouraged.
11/25/2025 08:00 PM UTC
5740-26999-02: Job Order Contracting (JOC) - Mechanical
5740-26999-02: Job Order Contracting (JOC) Mechanical Optional Pre-Bid Meeting: November 12, 2025 at 2:00pm. Meet in person at The Avenue, 275 W. Wisconsin Ave., 2nd Floor, Intersection Conference Room, Milwaukee, WI. OR Meet virtually via Microsoft Teams link: https://teams.microsoft.com/meet/2408489376002?p=MQBHkeJo08qsdPNSYa Attendance to either option is highly encouraged.
11/25/2025 08:00 PM UTC
5740-26999-03: Job Order Contracting (JOC) - Electrical
5740-26999-03: Job Order Contracting (JOC) Electrical Optional Pre-Bid Meeting: November 12, 2025 at 2:00pm. Meet in person at The Avenue, 275 W. Wisconsin Ave., 2nd Floor, Intersection Conference Room, Milwaukee, WI. OR Meet virtually via Microsoft Teams link: https://teams.microsoft.com/meet/2408489376002?p=MQBHkeJo08qsdPNSYa Attendance to either option is highly encouraged.
11/25/2025 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
6533-21400-04 -2021Time & Material (MKE) Behavior Health Division
Contract 4: Heating & Ventilating
09/08/2021 07:00 PM UTC
6533-21400-05 -2021Time & Material (MKE) Behavior Health Division
Contract 5: Electrical
09/08/2021 07:00 PM UTC
6533-21400-06 -2021Time & Material (MKE) Behavior Health Division
Contract 6: Painting
09/08/2021 07:00 PM UTC
6533-21400-07 -2021Time & Material (MKE) Behavior Health Division
Contract 7: Roofing
09/08/2021 07:00 PM UTC
5041-21402-03 - 2021Time & Material (MKE) General Mitchell International Airport
Contract 3: Carpet & Resilient Flooring
08/25/2021 07:00 PM UTC
P727-20199: Oak Leaf Trail Union Pacific Segment Crestwood Stream Culvert
Contract 1- Oak Leak Trail Culvert Replacement Work consists of replacing an existing stone arch culvert under the Oak Leaf Trail with a corrugated metal culvert pipe. Excavate and remove existing stone and debris from Crestwood Stream channel through the culvert. Install an arch corrugated metal pipe culvert, backfill and restore the disturbed area. Project Completion: Work of Contract shall be Substantially Complete by June 1, 2022. Pre-Bid Meeting: August 5, 2021 at 2:00 pm, meet at the 2200 block of W. Florist Avenue at the service entrance to Johnson Control Inc., Glendale, WI. Prime Contractor shall perform at least 30 percent of the original contract amount with contractor's own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid.
08/18/2021 07:00 PM UTC
C216-20187: CH Complex Improvements CJF Caulking Phase 2
CONTRACT 1: 1) Phase 2 would consist of 100% sealant joint replacement on the existing façade limestone panels from the bottom of the third level to the ground level. The exterior joint replacement on the main CJF exterior walls would be accessed by swing stage scaffolding. Exterior joint replacement would include removal of existing joint material, prep joint, install new joint filler as needed, new backer rood (compression seal) and polyurethane sealant (tooled finish). 2) Also Phase 2 would include spall repair on the existing limestone panels, limestone crack repair, replacement of damaged / deteriorated limestone panels that are beyond repair, and replacement of 100% parapet coping sealant joints with new backer rod, sealant , and new lead T-caps. Pre-Bid Meeting for CONTRACT-1, Bid Package 1 Takes place on July 14, 2021 at 1:30 PM, 633 West Wisconsin Avenue, Milwaukee, Wisconsin 53203, SEVENTH FLOOR, ROOM 730 – Todd M. Beamer Memorial Training Center
07/21/2021 07:00 PM UTC
O889-20190: Marcus Center For The Performing Arts Pedestrian Pavement Replacement
Contract 1: Pedestrian Pavement Replacement Work consists of reconstructing the east/main entrance to the Marcus Center and along the Milwaukee River/west side of the Peck Pavilion. Safety bollard, cable barrier, and decorative colored concrete will be utilized as indicated in the project Bid documents. Pre-Bid Meeting: One Pre-Bid meeting will take place on July 14th, 2021 at 1:00 PM at the Marcus Center (outside under the main entry canopy along North Water Street), 929 N. Water Street, Milwaukee, WI 53202. This will be an in-person meeting, please bring masks and follow COVID guidelines. It is strongly recommended that the contractors attend, but it is not mandatory.
07/21/2021 07:00 PM UTC
9525-21405-04: 2021 Time and Material Zoological Gardens
Contract 4: Electrical
07/14/2021 07:00 PM UTC
9525-21405-05: 2021 Time and Material Zoological Gardens
Contract 5: Fences and Gates
07/14/2021 07:00 PM UTC