Upcoming Solicitations

Number Deadline
CP3427
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT B/C SLUDGE PROCESSING IMPROVEMENTS CAPITAL PROJECT NUMBER CP3427 I. Scope of Services: Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following: • Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors. • Installation of Access Hardware for Operation/Maintenance of Digestors. • Construction of New Blower Building for Process Equipment. • Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion. • Construction of New Motor Control Center. • Reconstruction of Existing Sludge Pump Station. • Construction of New Sludge Processing Building. • Installation of Screw Presses for Solids Processing. • Installation of Dewatering Polymer Feed System. • Installation of Conveyance System for Solids Handling/Disposal. • Interconnections to Owner’s SCADA for Control/Monitoring. • Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
12/16/2025 08:45 PM UTC
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana Muirfield Drive Drainage-Phase II Project No. 2025-748 Capital Project No. 3224 The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
01/06/2026 08:45 PM UTC
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726 Capital Project No. 3019 Sale Road Bridge Repair City of Lake Charles, LA The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes: • Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall; • Replace failed drainage concrete pipe and boxes; • Removal and replacement of reinforced concrete pavement; • The associated traffic management, including detour signage.
01/06/2026 08:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Project No. CP3040
City of Lake Charles, Louisiana 1st AVENUE TRAIL NORTH OF BROAD TO I-10 STATE PROJECT NO. H.014658 CITY OF LAKE CHARLES PROJECT NO. CP 3040 City of Lake Charles project, ‘1st Avenue Trail North of Broad to I-10’ consist of site work improvements for an identified recreational trail development area. The site work consists of traffic control, erosion control, clearing and grubbing, grading, and stockpiling of topsoil and vegetative much, saw cutting, demolition of asphaltic and concrete pavement, installation of concrete pavement, and installation of concrete curb and gutter build back, as outlined on the contract documents. This project is a Federal-Aid Construction Project with reference and inclusion of Form FHWA 1273 and its required outlined provisions for Prime Contractor, Sub-Contractors, and Lower Tier Sub-contracts.
11/01/2022 07:45 PM UTC
CP HL-14
City of Lake Charles, Louisiana Lake Charles Civic Center - Coliseum Interior Repairs CP HL-14 Return Lake Charles Civic Center Coliseum Hurricane Laura Repair Project Pre-Disaster Condition (PDC)
10/18/2022 07:45 PM UTC
RFP #2023-01, File ID #180-22
Request for Proposals for Professional Services - Program Manager for City of Lake Charles Community Development Block Grant-Disaster Recovery (CDBG-DR) Direct Allocation
10/04/2022 07:45 PM UTC
HL-83, HL-85, HL-86A, HL-86B, HL-88, HL-96, HL-101, HL-103, HL-110, HL-116
CITY OF LAKE CHARLES, LOUISIANA WATER TREATMENT PLANTS MISCELLANEOUS BUILDING REPAIRS CAPITAL PROJECT NO. HL-83, HL-85, HL-86A, HL-86B, HL-88, HL-96, HL-101, HL-103, HL-110, HL-116 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred minimal to severe damages to multiple buildings located at the Southwest, George H. West, Center East, Center West, Chennault, and McNeese Water Treatment Plants. This project will serve to provide necessary repairs to reinstate building functionality to pre-storm conditions. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of building repairs, in response to damages incurred as a result of Hurricane Laura (DR-4559-LA), to pre-storm conditions and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Southwest Water Treatment Plant (4300 Alma Lane) • Pump/Administration Building (Insurance SOV No. 116) George H. West Water Treatment Plant (225 N. Ryan Street) • Distribution/Linemen Building (Insurance SOV No. 083) • Pump/Administration Building (Insurance SOV No. 085) • Chlorine Building (Insurance SOV No. 086A) • Chlorine Building (Insurance SOV No. 086B) • Utility Building (Insurance SOV No. 088) Center East Water Treatment Plant (3207 Center Street) • Main Building (Insurance SOV No. 101) Center West Water Treatment Plant (3208 Center Street) • Pump Building (Insurance SOV No. 103) Chennault Water Treatment Plant (1501 W. Main Street) • Chlorine Building (Insurance SOV No. 096) McNeese Water Treatment Plant (617 E. McNeese Street) • Pump Building (Insurance SOV No. 110) Design services shall be as per the City of Lake Charles A&E Manual.
10/04/2022 07:45 PM UTC
HL-24, 25A, 29E, 29G, 29H, 32, 33, 81A, 81.D.1, 81M, 126E, 126C, 126D, 126J, 126K, 126F
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANTS MISCELLANEOUS BUILDING REPAIRS CAPITAL PROJECT NO. HL-24, 25A, 29E, 29G, 29H, 32, 33, 81A, 81.D.1, 81M, 126E, 126C, 126D, 126J, 126K, 126F I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred minimal to severe damages to multiple buildings located at Wastewater Treatment Plants A, B/C, and D. This project will serve to provide necessary repairs to reinstate building functionality to pre-storm conditions. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of building repairs, in response to damages incurred as a result of Hurricane Laura (DR-4559-LA), to pre-storm conditions and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Wastewater Treatment Plant A (128 W. Railroad Ave., Lake Charles, LA 70601) • Office/Administration/Blower Pump Room Building (Insurance SOV No. 081A) • Storage Building No.1 (Insurance SOV NO. 081.D.1) • Sludge Processing Building (Insurance SOV No. 081M) Wastewater Treatment Plant B/C (1132 W. 18th St., Lake Charles, LA 70601) • Equipment Building (Insurance SOV No. 024) • Portable Building (Insurance SOV NO. 25A) • RAS/WAS Pump Station (Insurance SOV No. 029E) • Motor Control Center No. 1 Building (Insurance SOV No. 029G) • Motor Control Center No. 2 Building (Insurance SOV No. 029H) • Electrical Storage Building (Insurance SOV No. 32) • Portable Building (Insurance SOV No. 33) Wastewater Treatment Plant D (3820 Tank Farm Rd., Lake Charles, LA 70601) • Press Building (Insurance SOV No. 126C) • Tertiary Filter Building (Insurance SOV No. 126D) • Maintenance Building (Insurance SOV No. 126E) • Control Room Building (Insurance SOV No. 126F) • MCC Building (Insurance SOV No. 126J) • MCC Building (Insurance SOV No. 126K) • Oxidation Ditch No. 1 (Insurance SOV No. 126.A.1) Design services shall be as per the City of Lake Charles A&E Manual.
10/04/2022 07:45 PM UTC
CP HL-14
City of Lake Charles, Louisiana Lake Charles Civic Center – Marquee Replacement CP HL-14 Scope of Work: 1. Construct new 60' marquee sign as shown on attached drawing to replace the existing marquee. 2. Reuse existing pipe column structure and existing electrical and data service. 3. New marquee shall include new signage and digital message boards. 4. Provide updated electrical and data. Modify and relocate panels as required. 5. Provide (2) directional pylon signs in front of Civic Center to replace existing damaged signs. (Alternate Bid, See attached drawing). 6. Remove rust; clean and paint existing steel pipe bollards and existing metal pipe structure.
09/20/2022 07:45 PM UTC
HL-138
City of Lake Charles, Louisiana Lake Charles Police Dept Annex-Demo HL-138 Remove existing single story building, foundation, paving, and all related components in their entirety. Project includes asbestos abatement of hazardous material in building. Build back sidewalk along street.
08/02/2022 07:45 PM UTC
Capital Project Number CP3367
City of Lake Charles Wastewater Treatment Plant A Basin A-08 Rehabilitation Capital Project Number CP3367 I. Scope of Services: The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. A. The Work includes, but is not necessarily limited to, the following: A. Base Bid: a. There is approximately 12,197 LF of 8-inch and 930 LF of 12-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, open cut replacement, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 229 active sewer service laterals. B. Alternate No. 1: a. There is approximately 1,916 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 33 active sewer service laterals. C. Alternate No. 2: a. There is approximately 2,105 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 38 active sewer service laterals. D. Alternate No. 3: a. There is approximately 2,695 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 49 active sewer service laterals.
07/19/2022 07:45 PM UTC
Capital Project Number CP3251
City of Lake Charles, Louisiana University Area Red Sub Basin Sewer Rehabilitation Capital Project Number CP3251 I. Scope of Services A. The University area is one of the oldest areas in the City of Lake Charles. Wastewater flow studies have indicated excessive inflow and infiltration during rain events, causing peak flows up to 14 times the average daily wastewater rate. B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. C. This scope of work covers the repair of the collection system in the University – Red Sub-Basin Sewer Rehabilitation Project. The Work includes, but is not necessarily limited to, the following: a. Base Bid: i. There is approximately 8,418 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, open cut replacement, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 145 active sewer service laterals. b. Alternate No. 1: i. There is approximately 1,605 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 33 active sewer service laterals. c. Alternate No. 2: i. There is approximately 1,246 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 12 active sewer service laterals.
07/19/2022 07:45 PM UTC
CP 3424
City of Lake Charles, Louisiana Water Billing Department Build Out at Transit Facility CP 3424 Interior buildout at existing tenant space. Work includes, wall framing, sheetrock, electrical, and window installation.
07/19/2022 07:45 PM UTC
91 - 100 of 385 Solicitations