Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP3511
Huber Park Playground and Parking Improvements
Lake Charles City Project No. CP3511
1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park.
2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
| 05/06/2025 07:45 PM UTC |
CP3450
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT ‘A’
OPERATIONAL RELIABILITY IMPROVEMENTS
LIFT STATION ELECTRICAL UPGRADES
CAPITAL PROJECT NUMBER CP3450
I. Scope of Services:
Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following:
• Booker Street Lift Station (120 N. Booker Street)
o Earthwork to Erect Access Driveways for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• N. Blake Street Lift Station (1306 N. Blake Street)
o Clearing and Grubbing to Facilitate the Work
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Opelousas Street Lift Station (3038 Opelousas Street)
o Furnish and Install Domestic Water Service
o Furnish and Install Bypass Connection for Temporary Service
o Remove and Replace Existing Wet Well Topping Slab and Valve Vault
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation
o Removal and Replacement of Existing Electrical Rack
o Installation and Commissioning of an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Installation and Commissioning of a Duplex Pump Control Panel
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Broad Street Lift Station (3219 Broad Street)
o Furnish and Install Bypass Connection for Temporary Service
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• 3rd Ave. & 3rd St. Lift Station (949 Third Avenue)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Colletta Street Lift Station (2218 Colletta Street)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• St. John Street Lift Station (1318 St. John Street)
o Furnish and Install Bypass Connection for Temporary Service
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Cline Street Lift Station (2715 Cline Street)
o Clearing and Grubbing to Facilitate the Work
o Erection of Concrete Revetment for Embankment Protection
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
| 05/20/2025 07:45 PM UTC |
CP2876
CITY OF LAKE CHARLES, LOUISIANA
CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT
CAPITAL PROJECT NUMBER CP2876
I. Background:
In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide.
II. Scope of Services:
Design of complete electrical and back-up power solutions. This Work shall include:
• Furnish and Install 450KW, Natural Gas Generator
• Furnish and Install an Automatic Transfer Switch
• Installation of Generator Slab
• Installation of a new exterior MCC building
• Installation of a new MCC
• Installation of splice blocks, conduit and wire to extend existing feeds to MCC building.
• Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc.
• Interconnections of Generator/MCC improvements to existing infrastructure
| 05/20/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Project No. 2021-710 Capital Project No. 3391
Project No. 2021-710
Capital Project No. 3391
West Oak Lane Drainage
City of Lake Charles, LA
The general scope of work for this project is the installation of new underground drainage on the north and south sides of West Oak Lane from Ryan Street west to Olive Street. This new system will extend south on the east side of Olive Street to an existing 48” storm drainage pipe located approximately 400 feet south of W. Oak Lane. This new underground system will consist of new drainage inlets and pipe ranging from 12” to 30” in diameter, as well as associated pavement work.
| 10/05/2021 07:45 PM UTC |
RFP #2021-22, File ID #151-21
Request for Proposals for Automated Water Meter Infrastructure (AMI) System
| 08/17/2021 07:45 PM UTC |
RFP #2021-24
Program Management of the Critical Drainage Improvement Program
| 08/17/2021 07:45 PM UTC |
Project #HL-67 & HL-68
City of Lake Charles, Louisiana
Communications Tower – 706 Enterprise Boulevard
Project #HL-67 & HL-68
Base Bid:
1. Provide a new 350’ tall communications with associated site and foundation concrete drill shafts.
2. Attached antennae and cabling.
3. Commission tower to designed function & capacity.
Alternate #1:
1. Extend tower height to 450’ as specified.
| 08/17/2021 07:45 PM UTC |
Project No. 2018-681 Capital Project No. 3279
Project No. 2018-681
Capital Project No. 3279
6th Avenue Reconstruction
3rd Street to 6th Street
City of Lake Charles, LA
The general scope of work for Project No. 2018-681, 6th Avenue Reconstruction from 3rd Street to 6th Street includes the following:
a. Reconstruction of roadways
b. Storm drainage improvements
c. New water distribution system
d. New sidewalks & ADA compliant sidewalk ramps
| 08/17/2021 07:45 PM UTC |
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA
HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM
WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
The Contractor shall furnish all labor, materials, equipment, tools, services, supervision, and incidentals required to complete the Work as shown on the Plans and specified herein. This Work includes, but is not necessarily limited to, the following:
1. Chlorine Feed System (Insurance SOV #101) @ Center East WTP (3207 Center Street)
a. Remove and Replace Exterior Door w/Panic Hardware
b. Remove and Replace Security Chains for Chlorine Cover
2. Fluoride Feed System (Insurance SOV #102) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
3. Phosphate Feed System (Insurance SOV #104) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
4. Caustic Feed System (Insurance SOV #108) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Remove and Replace Bulk Storage Tank
5. Caustic Feed System (Insurance SOV #103) @ Center West WTP (3208 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Furnish and Install Day Tank w/Transfer Pump
d. Remove and Replace Bulk Storage Tank
6. Phosphate Feed System (Insurance SOV #105) @ Center West WTP (3208 Center Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
7. Fluoride Feed System (Insurance SOV #106) @ Center West WTP (3208 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
8. Caustic Feed System (Insurance SOV #95) @ Chennault WTP (1501 W. Main Street)
a. Furnish and Install Fiberglass Enclosure
b. Furnish and Install Electrical Wiring/Conduit
c. Furnish and Install Process Piping
d. Furnish and Install New Bulk Fill Line (2-Inch)
e. Furnish and Install Duplex Metering Pump Skid
f. Furnish and Install Day Tank w/Transfer Pump
g. Remove and Replace Bulk Storage Tank
9. Chlorine Feed System (Insurance SOV #96) @ Chennault WTP (1501 W. Main Street)
a. Remove and Replace Exterior Door w/Panic Hardware
b. Remove and Replace Exterior Single-Pane Windows
c. Remove and Replace Security Chains for Chlorine Cover
10. Fluoride Feed System (Insurance SOV #98) @ Chennault WTP (1501 W. Main Street)
a. Furnish and Install Electrical Wiring/Conduit
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Remove and Replace Bulk Storage Tank
11. Phosphate Feed System (Insurance SOV #99) @ Chennault WTP (1501 W. Main Street)
a. Remove and Replace Fiberglass Enclosure
b. Furnish and Install Electrical Wiring/Conduit
c. Furnish and Install New Bulk Fill Line (2-Inch)
d. Furnish and Install Duplex Metering Pump Skid
e. Furnish and Install Day Tank w/Transfer Pump
f. Remove and Replace Bulk Storage Tank
12. Caustic Feed System (Insurance SOV #110) @ McNeese WTP (617 E. McNeese Street)
a. Furnish and Install New Bulk Fill Line (2-Inch)
b. Furnish and Install Day Tank w/Transfer Pump
c. Remove and Replace Bulk Storage Tank
13. Chlorine Feed System (Insurance SOV #112) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Remove and Replace Security Chains for Chlorine Cover
14. Fluoride Feed System (Insurance SOV #113) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
15. Phosphate Feed System (Insurance SOV #114) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
| 08/17/2021 07:45 PM UTC |
Project No. 2019-697 Capital Project No. 3288
Project No. 2019-697
Capital Project No. 3288
Holly Hill Road Sewer Line Rehabilitation Phase 3
City of Lake Charles, LA
The general scope of work for Project No. 2019-697, Capital Project No. 3288, includes the rehabilitation of approximately 2500 feet of 48-inch sewer main by cured-in-place (CIPP) lining including sewer manholes on Holly Hill Road from Wickersham Drive/Moss Loop north to Chrysler Street. Sewer manhole rehabilitation to continue northerly to Prien Lake Road Roundabout.
| 08/03/2021 07:45 PM UTC |
Project Number HL-SOV-93
CITY OF LAKE CHARLES, LOUISIANA
HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM
GEORGE H. WEST WATER TREATMENT PLANT
WELLS G-8 & G-9 STARTER REPLACEMENTS
PROJECT NUMBER HL-SOV-93
I. Background:
Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the motor starters/cabinets on wells G-8 and G-9 which are located at the N. Ryan and Railroad Ave well site associated with the Water Treatment Plant. The damage to the starters is to the point where functions of the systems no longer provide reliable operation and are in need of replacement. This project will serve to replace the starters, controls, and cabinets associated with Wells G-8 and G-9 and return the water system to its pre-storm operation. This project is necessary to ensure the City of Lake Charles is able to adequately provide reliable service to their consumers.
II. Scope of Work:
Implementation of electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA), to reinstate damaged well starters to their pre-storm condition, as well as, improve equipment installation in conformance with applicable codes and standards and improve the ability of the Owner to service and maintain the proposed equipment. This Work shall include:
• Removal and Disposal of Existing, Defective Starter Cabinets
• Installation of Pad-Mounted 2,300V to 480V Transformer
• Installation of Main Service Disconnect (per Entergy requirements)
• Installation of MCC with Starter Cabinets for Well Starters w/Soft Starts
• Installation of Service Disconnect for Each Starter (TYP of 2)
• Removal and Replacement of 150HP Well Motors (TYP of 2)
• Termination of Electrical Connections into Existing Plant Service/Controls
| 08/03/2021 07:45 PM UTC |
Capital Project No. HL-15
Project No. 2021-715
Lake Charles City Capital Project No. HL-15
Bord du Lac Drive - Marina Repairs
City of Lake Charles, LA
The general scope of work is the restoration of the Lake Charles Civic Center Marina Docks A, B, and C to pre-hurricane loss conditions.
The general scope of repair includes the following general items:
• Complete removal of damaged float assemblies and walers, water line, electrical conductors, gangway, service pedestals, and related side pile guides.
• Installation of new float assemblies and walers, side pile guides, thru rods, water and electrical system, service pedestals, and missing filler panels and covers.
• Re-coat damaged guide piles.
| 08/03/2021 07:45 PM UTC |
CP HL-14
City of Lake Charles, Louisiana
Emergency Generator Replacement of Lake Charles Civic Center
CP HL-14
Scope of Work: Disconnect and abandon the existing non-functioning diesel generator. Disconnect and remove the existing automatic transfer switch. Provide and install a new 350kw / 437.5kva 277/480v 3p 4w diesel generator in a weatherproof sound attenuated enclosure mounted onto a UL2085 diesel storage tank. Mount onto a new concrete slab adjacent to the cooling tower – east side. Provide and install new underground feeders thru the basement to a new Automatic Transfer Switch - ATS location and reconnect all previous feeds/loads.
| 08/03/2021 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.