General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana Muirfield Drive Drainage-Phase II Project No. 2025-748 Capital Project No. 3224 The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
01/06/2026 08:45 PM UTC
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726 Capital Project No. 3019 Sale Road Bridge Repair City of Lake Charles, LA The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes: • Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall; • Replace failed drainage concrete pipe and boxes; • Removal and replacement of reinforced concrete pavement; • The associated traffic management, including detour signage.
01/06/2026 08:45 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Repair Project HL-SOV-126
City of Lake Charles WWTP D Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-126 Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP D 1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2). 3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3). 4. Remove and dispose of debris in Oxidation Ditch No. 1 (SOV 126.A.1). 5. Remove and dispose of debris in Oxidation Ditch No. 2 (SOV 126.A.2). 6. Remove and dispose of debris in Oxidation Ditch No. 3 (SOV 126.A.3). 7. Remove and dispose of debris in Anoxic Tank No. 1 (SOV 126.A.4). 8. Remove and dispose of debris in Anoxic Tank No. 2 (SOV 126.A.5). 9. Remove and dispose of debris in Anoxic Tank No. 3 (SOV 126.A.6).
11/30/2021 08:45 PM UTC
Hurricane Laura Storm Repairs - Park Fencing Repairs
City of Lake Charles, Louisiana Hurricane Laura storm Repairs – Park Fencing Repairs HL-01 DREW PARK HL-03 GOOSPORT PARK HL-05 BELLARD PARK HL-07 NORTH BEACH HL-08 CLIFTON PARK HL-09 LOCK PARK HL-12 LANZA PARK HL-18 MILLENNIUM PLAYGROUND HL-20 McMILLIAN PARK HL-120 COLUMBUS CIRCLE HL-137 LaGRANGE SOCCER PARK HL-139 RIVERSIDE PARK HL-140 TUTEN PARK HL-142 ADMIRAL NIMITZ PARK HL-143 GRACE AND MEDORA PARK HL-144 MARY BELLE PARK HL-145 GENERAL MOORE PARK HL-146 HOLMES STREET PARK HL-147 GRACE AND CHURCH PARK 1. The Work includes repairs to existing fencing at park facilities a. Chain-link fencing repair/replacement. b. Steel fencing repairs. c. Aluminum fencing repairs/replacement.
11/16/2021 08:45 PM UTC
Project No. 2021-715
Project No. 2021-715 Lake Charles City Capital Project No. HL-15 Bord du Lac Drive - Marina Repairs (RE-BID) City of Lake Charles, LA The general scope of work is the restoration of the Lake Charles Civic Center Marina Docks A, B, and C to pre-hurricane loss conditions. The general scope of repair includes the following general items: • Complete removal of damaged float assemblies and walers, water line, electrical conductors, gangway, service pedestals, and related side pile guides. • Installation of new float assemblies and walers, side pile guides, thru rods, water and electrical system, service pedestals, and missing filler panels and covers. • Re-coat damaged guide piles.
11/16/2021 08:45 PM UTC
HL-67 & HL-68
City of Lake Charles, Louisiana Communications Tower – 706 Enterprise Boulevard Project #HL-67 & HL-68 The scope of work: Base Bid: 1. Provide a new 350’ tall communications with associated site and foundation concrete drill shafts. 2. Attached antennae and cabling. 3. Commission tower to designed function & capacity. Alternate #1: 1. Extend tower height to 450’ as specified.
11/16/2021 08:45 PM UTC
HL-65
City of Lake Charles, Louisiana Training Center Demo HL-65 Remove existing building, foundation, paving, antennae and all related components in their entirety. Project includes asbestos abatement of hazardous material in building.
11/16/2021 08:45 PM UTC
HL-02, 06, 43, 135, 136
City of Lake Charles, Louisiana Hurricane Laura storm Repairs – Multiple Ball Park Repairs HL - 02, 06, 43, 135, 136 1. The Work includes repairs to multiple existing park facilities including ball fields, concession stands, restrooms, bleachers and covers. a. Repair existing bleacher cover structures. Replace damaged bleachers. b. Chain-link fencing repair/replacement. c. Repairs to lighting and mechanical systems. d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, gypsum board, painting etc.
11/02/2021 07:45 PM UTC
RFP #2022-02, File ID #381-21
Request for Proposals for Professional Services - Select Services for Management of HUD Programs
11/02/2021 07:45 PM UTC
CP 3359
City of Lake Charles, Louisiana St. Louis Area Drainage Rehabilitation CP 3359 SCOPE OF WORK: Project scope consists of improvements to the subsurface storm drainage system in the area surrounding St. Louis High School. The project shall incorporate various rehabilitation methods such as removal & replacement, cured in place pipe (CIPP) lining, and sealing of catch basin walls to improve drainage flow and maintain the integrity of the property through which it serves. PROJECT LIMITS: Project limits are from Enterprise Blvd. to Kirkman St. in the East – West direction and from 7th St. to 12th St. in the North – South direction.
11/02/2021 07:45 PM UTC
Project # HL-66
City of Lake Charles, Louisiana LCPD Central Station Restoration- Project # HL-66 Scope of Repair Work Remove ex roof system down to deck. Ex roof has ex lightweight insulating concrete over concrete roof deck. Remove this lightweight insulating concrete down to roof deck. Install new roof drains, new exhaust fans, new roof insulation. New roof insulation to be min R-20 at all areas and tapered to slope at ¼:12 min. New roof system and flashing in its entirety to be designed for wind loads per ASCE 7-16 and as required for essential facility. Ex roof top antennae and communications system cabling to be removed and reinstalled. Ex roof system at parking canopy to be removed and new roofing and flashing installed. Remove existing roof mounted light fixtures and conduit at parapet flashing. Install new light and position to light up flagpole. Remove existing remnants of parking light pole light and bases. Install new light poles and concrete bases to comply with current wind loads per ASCE 7-16 and connect to existing circuits. Remove ex carpet and base and install new carpet and base at main lobby. Install new ceiling tiles in existing system. Install new ceiling tiles in men and women ceiling system. Remove ex ceiling system remnants and install new suspended ceiling system and one new light fixture connected to existing circuit. And other work as may be enumerated in project drawings.
11/02/2021 07:45 PM UTC
Capital Project Number CP3387
City of Lake Charles, Louisiana George H. West Water Treatment Plant Back-Up Power Improvements Capital Project Number CP3387 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for the George H. West Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Furnish and Install 2,300V Stand-by Generator with 5kV Automatic Transfer Switch • Intercept incoming Broad/Ann Street Entergy Feeds and Route into new ATS • Route new Incoming Feed from ATS to Existing Main ATS and Switchgear • Institute Operational Relays/Controls for Automatic Generator Operation • Interconnect Generator Control Panel with Owner’s SCADA and Low Voltage Supply
10/19/2021 07:45 PM UTC
131 - 140 of 386 Solicitations
1 2 10 11 12 14 16 17 18 38 39