General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3427
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT B/C SLUDGE PROCESSING IMPROVEMENTS CAPITAL PROJECT NUMBER CP3427 I. Scope of Services: Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following: • Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors. • Installation of Access Hardware for Operation/Maintenance of Digestors. • Construction of New Blower Building for Process Equipment. • Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion. • Construction of New Motor Control Center. • Reconstruction of Existing Sludge Pump Station. • Construction of New Sludge Processing Building. • Installation of Screw Presses for Solids Processing. • Installation of Dewatering Polymer Feed System. • Installation of Conveyance System for Solids Handling/Disposal. • Interconnections to Owner’s SCADA for Control/Monitoring. • Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
12/16/2025 08:45 PM UTC
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana Muirfield Drive Drainage-Phase II Project No. 2025-748 Capital Project No. 3224 The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
01/06/2026 08:45 PM UTC
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726 Capital Project No. 3019 Sale Road Bridge Repair City of Lake Charles, LA The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes: • Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall; • Replace failed drainage concrete pipe and boxes; • Removal and replacement of reinforced concrete pavement; • The associated traffic management, including detour signage.
01/06/2026 08:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Repair Project HL-SOV-029
City of Lake Charles WWTP B/C Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-029 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP B/C 1. Remove and dispose of debris in Digester No. 1 (SOV 29). 2. Remove and dispose of debris in Aeration Basin No. 1 (SOV 29.A.1).
06/01/2021 07:45 PM UTC
Repair Project HL-SOV-126
City of Lake Charles WWTP D Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-126 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP D 1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2). 3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3). 4. Remove and dispose of debris in Oxidation Ditch No. 1 (SOV 126.A.1). 5. Remove and dispose of debris in Oxidation Ditch No. 2 (SOV 126.A.2). 6. Remove and dispose of debris in Oxidation Ditch No. 3 (SOV 126.A.3). 7. Remove and dispose of debris in Anoxic Tank No. 1 (SOV 126.A.4). 8. Remove and dispose of debris in Anoxic Tank No. 2 (SOV 126.A.5).
06/01/2021 07:45 PM UTC
2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
06/01/2021 07:45 PM UTC
Various Fire Stations Interior & Exterior Repairs
City of Lake Charles, Louisiana Various Fire Stations Interior & Exterior Repairs Project #HL-56, HL-57, HL-58, HL-59, HL-62, HL-119, HL-121, HL-122 Scope of work: Repairs to water damage at interior of buildings consisting of removing and replacing painted sheetrock, ceiling tiles and other items at select stations. Exterior work will consist of fastener replacement at metal roofs and fence / gate replacement.
04/13/2021 07:45 PM UTC
Repair Project HL-SOV-081
City of Lake Charles WWTP A Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-081 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Remove storm blown debris from open top wastewater tanks. 2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill. 3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant. 4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill. 5. The landfilled product shall have a minimum solids content of 16%. 6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP A 1. Remove and dispose of debris in Digester No. 1 (SOV 81.F.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 81.F.2). 3. Pump water/debris from Aeration Basin No. 1 (SOV 81.G.1) to head of plant. 4. Pump water/debris from Aeration Basin No. 2 (SOV 81.G.2) to head of plant. 5. Pump water/debris from Aeration Basin No. 3 (SOV 81.G.3) to head of plant. 6. Pump water/debris from Aeration Basin No. 4 (SOV 81.G.4) to head of plant.
04/13/2021 07:45 PM UTC
Repair Project HL-SOV-029
City of Lake Charles WWTP B/C Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-029 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Remove storm blown debris from open top wastewater tanks. 2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill. 3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant. 4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill. 5. The landfilled product shall have a minimum solids content of 16%. 6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP B/C 1. Remove and dispose of debris in Digester No. 1 (SOV 29). 2. Pump water/debris from Aeration Basin No. 1 (SOV 29.A.1) to head of plant.
04/13/2021 07:45 PM UTC
Repair Project HL-SOV-126
City of Lake Charles WWTP D Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-126 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Remove storm blown debris from open top wastewater tanks. 2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill. 3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant. 4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill. 5. The landfilled product shall have a minimum solids content of 16%. 6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP D 1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2). 3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3). 4. Pump water/debris from Oxidation Ditch No. 1 (SOV 126.A.1) to head of the plant. 5. Pump water/debris from Oxidation Ditch No. 2 (SOV 126.A.2) to head of the plant. 6. Pump water/debris from Oxidation Ditch No. 3 (SOV 126.A.3) to head of the plant. 7. Pump water/debris from Anoxic Tank No. 1 (SOV 126.A.4) to head of the plant. 8. Pump water/debris from Anoxic Tank No. 2 (SOV 126.A.5) to head of the plant. 9. Pump water/debris from Anoxic Tank No. 3 (SOV 126.A.6) to head of the plant.
04/13/2021 07:45 PM UTC
Project No. HL-201
City of Lake Charles, Louisiana City of Lake Charles Emergency Traffic Control Signals HL-201 The work consists of the installation of new traffic signals, complete and operable, including but not limited to actuated traffic controller, pull boxes, poles, mast arms, foundations, conduits, luminaire support, cables, wire, connection fees, coordination with Entergy and City of Lake Charles Traffic Department, and the removal of existing traffic signals. This new equipment is to be installed at the intersection as shown on the plans. Unless otherwise specified, all materials shall be new. Existing equipment to be removed shall be removed in such manner as to avoid damage to said equipment, and proper care and protection shall be exercised after its removal. All incidental parts which are not shown on the plans, or specified herein or in the Special Provisions, and which are necessary to complete the traffic signal or other electrical systems or required for modifying existing systems, shall be furnished and installed as though such parts were shown on the plans or specified herein. All systems shall be complete and in operation to the satisfaction of the Engineer at the time of final acceptance.
03/30/2021 07:45 PM UTC
Project No. HL-54
City of Lake Charles, Louisiana Storm Repairs – Old City Hall Interiors HL - 54 Scope of Work: Restoration of interior finishes damaged during Hurricanes Laura and Delta. Work involves removal and reapplication of plaster off of wood lath backing at ceiling and wall locations throughout. Repair of damaged gypsum drywall assemblies in other locations. Sanding and refinishing of existing wood floor. New paint and trim stained throughout. Miscellaneous repairs to plaster walls. Salvage, repair, and reinstallation of door hardware and fixtures as necessary.
03/23/2021 07:45 PM UTC
Project No. HL-02
City of Lake Charles, Louisiana Hurricane Laura Storm Repairs - Henry Heights Park HL - 02 The Work includes repairs to existing park facilities including ball fields, concession stands, restrooms, bleachers and covers. a. Repair existing bleacher cover structures. Replace damaged bleachers. b. Chain-link fencing repair/replacement. c. Repairs to lighting and mechanical systems. d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, painting etc.
03/23/2021 07:45 PM UTC
161 - 170 of 385 Solicitations
1 2 13 14 15 17 19 20 21 38 39