General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Project No. 2020-698 Capital Project No. 3360
Project No. 2020-698 Capital Project No. 3360 Foster Street & Riverside Drive Drainage Rehabilitation City of Lake Charles, LA The general scope of work for Project No. 2020-698, Foster Street & Riverside Drive Drainage Rehabilitation consists of the installation of new drainage pipe and catch basins. This includes the removal and reinstallation of the associated roadway pavement and sidewalks, as well as any required waterline adjustments to facilitate the new drainage pipes.
03/16/2021 07:45 PM UTC
HD-SOV-0082 EM-3547-LA Capital Project No. HD-0082
City of Lake Charles North Booker Street Lift Station Repair HD-SOV-0082 EM-3547-LA Capital Project No. HD-0082 I. Scope of Services: Design and implementation of mechanical and electrical repairs, in response to damage incurred as a result of Hurricane Delta (EM-3547-LA), to reinstate the damaged systems to pre-storm conditions and to upgrade these existing systems to coincide with newly applicable codes, standards, and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: 1. Removal and replacement of the three (3) existing motors with three (3) new motors. 2. Removal and replacement of the three (3) existing pumps with three (3) new pumps. 3. Removal and replacement of the one (1) existing sump pump with one (1) new sump pump. 4. Removal and replacement of the one (1) existing ventilation system with one (1) new ventilation system. 5. Removal of the complete electrical systems (main disconnect, meter base, main breakers, starters, controls, SCADA equipment, etc.) all located within the dry-pit of the station. 6. Furnishing and installation of new above grade complete electrical systems (main disconnect, meter base, manual transfer switch, , main breakers, starters, controls, SCADA equipment, etc.). 7. Removal and disposal of all existing valves and piping required for the installation of new pumps. 8. Furnishing and installation of new valves and piping required for the installation of new lift station pumps. 9. Cleaning, preparing and coating of the existing lift station wet well. 10. Furnishing and installation of 6-foot tall chain link fencing with green privacy slats. 11. Furnishing and installation of piping and fittings required for the installation of new pumps, valves, and bypass connection.
03/02/2021 08:45 PM UTC
Project No. HL-16 (REBID)
City of Lake Charles, Louisiana HL-16 DOWNTOWN LAKEFRONT SITE WORK (REBID) ~ City of Lake Charles project, ‘HL-16 DOWNTOWN LAKEFRONT SITE WORK - LAKEFRONT BOARDWALK’ consist of repair and/or replace of site components of the lakefront boardwalk area. The site work consist of concrete pavement removal and build back, brick paving work, Stone relocation, erosion control, rip rap shore line replacement, and concrete landing construction as outlined on the contract documents dated January28, 2021. This project addresses specific damage repairs due to the high winds and heavy rain presented by Hurricane Laura.
03/02/2021 08:45 PM UTC
Project Number HL-55
City of Lake Charles, Louisiana STORM REPAIRS – CENTRAL SCHOOL – ROOF REPLACEMENT HL - 55 Scope of Work 1. Remove existing roof membrane, insulation and related sheet metal items down to the wood deck as indicated on roof plan. 2. Review plans for removal existing mechanical and electrical items. 3. Repair, replace and secure decking as required. 4. At main roof area, mechanically attach 2.5” and 2” Polyisocyanurate insulation (V.O.J.), 1/4” tapered Polyisocyanurate crickets and ½” gyp board together into the wood deck. Over base layer of insulation, contractor shall loose lay fire retardant slip sheet. 5. At North roof area, mechanically attach 2.5” and 2” Polyisocyanurate insulation (V.O.J.), 1/8” tapered Polyisocyanurate and ½” gyp board together into the wood deck. Over base layer of insulation, contractor shall loose lay fire retardant slip sheet. 6. Install specified Hot Mop applied SBS Modified roofing system. 7. Install two ply modified base flashing systems. 8. Install new through wall scuppers, counter flashings and miscellaneous sheet metal items as specified. 9. Terminate flashings on top of parapet wall and seal as Detailed. 10. Issue specified 30-year warranty for SBS Roofing & 75-year warranty for Slate Roofing
02/09/2021 08:45 PM UTC
Project Number HL-48
City of Lake Charles, Louisiana STORM REPAIRS – MALLARD COVE CLUBHOUSE EXTERIOR REPAIRS HL - 48 The Work includes exterior repair and restoration of the Mallard Cove Clubhouse. 1. Replace existing shingle roof, concrete rid caps, gutters and downspouts. 2. Repair/replace existing wood doors and door hardware. 3. Re-painting and refinishing of exterior building elements. 4. Replace select exterior light fixtures. 5. Replace misc. gates. 6. Misc. cleaning and pressure washing.
02/09/2021 08:45 PM UTC
Project Number HL-10
City of Lake Charles, Louisiana STORM REPAIRS – PURPLE HEART ROOF REPLACEMENT HL - 10 A. Project Summary: 1. Remove existing gravel, roof, insulation, metal deck and related sheet metal items down to the existing bar joist. 2. Install new metal decking and treated wood blocking at perimeter. 3. Mechanically attach specified Polyisocyanurate and Gypsum board to the metal deck as specified. 4. Heat fuse one ply of SBS modified base sheet over the insulation. 5. Fabricate and install all miscellaneous sheet metal items. Strip in with SBS modified base sheet. 6. Flash all wall flashing and curb type penetrations with one ply of the specified SBS modified base sheet. 7. Fabricate and install ANSI-SPRI ES-1 metal edge, new drip edge, gutters and downspouts as specified. Strip in with SBS modified base sheet. 8. Install one ply of a high-performance mineral surfaced modified cap sheet across the field of the roof and up 2” above cant strip. Immediately broadcast granules into bleed out. 9. Install one ply of a high-performance mineral surfaced modified cap sheet at all wall flashing and curb type penetrations. 10. Inspect roof area with Owner and Owner’s rep prior to surfacing. 11. After 30 days, apply two applications of the specified protective coating. 12. Issue 30 year NDL warranty with wind rider up to the design pressures in stamped wind uplift calculations.
02/09/2021 08:45 PM UTC
Project Number HL-03
City of Lake Charles, Louisiana HURRICANE LAURA REPAIRS – GOOSPORT – ROOF REPLACEMENT HL - 03 Scope of Work: 1. Remove existing roof membrane, shingles and related sheet metal items down to the wood deck and gypsum deck as indicated on roof plan. 2. Disconnect and raise existing curbs as required to be 8” above finished roof surface as required. 3. At wood deck areas, repair, replace and secure decking as required. 4. At gypsum deck area, repair as specified. 5. Mechanically attach specified base sheet at all roof areas. 6. At wood deck area, loose lay specified base layer of Polyisocyanurate insulation and cover with FR slip sheet, install specified tapered insulation and gypsum board. Fasteners should penetrate into wood deck a minimum of 1. 7. At gypsum deck area, mechanically attach specified gypsum board. 8. Install specified torch applied SBS Modified roofing system. 9. Install two ply modified base flashing systems. 10. Install new drip edge, gutters, downspouts, counter flashings, leads and miscellaneous sheet metal items as specified. 11. Provide and install new pre-fabricated metal coping assembly. 12. Coat entire roof with a non-fibered aluminum coating. 13. Issue specified 30-year warranty.
02/09/2021 08:45 PM UTC
Project Number HL-54
City of Lake Charles, Louisiana STORM REPAIRS – OLD CITY HALL INTERIORS HL - 54 Scope of Work: Restoration of interior finishes damaged during Hurricanes Laura and Delta. Work involves removal and reapplication of plaster off of wood lath backing at ceiling and wall locations throughout. Repair of damaged gypsum drywall assemblies in other locations. Sanding and refinishing of existing wood floor. New paint and trim stained throughout. Miscellaneous repairs to plaster walls. Salvage, repair, and reinstallation of door hardware and fixtures as necessary.
02/09/2021 08:45 PM UTC
Capital Project Number CP3333
CITY OF LAKE CHARLES, LOUISIANA WWTP A – BASIN A-07 SEWER REHABILITATION CAPITAL PROJECT NUMBER CP3333 I. Scope of Services: The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-07. The Work includes, but is not necessarily limited to, the following: Base Bid 1. There is approximately 10,198 LF of 8-inch through 18-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, cured-in-place lining, and manhole lining. This work shall also include the furnishing and installation of three new manholes. Alternate No.1 1. There are approximately 33 active service laterals to be reinstated as part of this project. 2. There is approximately 1,862 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods cured-in-place lining.
02/02/2021 08:45 PM UTC
Capital Project Number CP9778
City of Lake Charles, Louisiana Rosa Hart Theatre Repair Capital Project Number CP9778 (REBID #2)
02/02/2021 08:45 PM UTC
161 - 170 of 374 Solicitations