CP3427
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT B/C
SLUDGE PROCESSING IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3427
I. Scope of Services:
Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following:
• Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors.
• Installation of Access Hardware for Operation/Maintenance of Digestors.
• Construction of New Blower Building for Process Equipment.
• Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion.
• Construction of New Motor Control Center.
• Reconstruction of Existing Sludge Pump Station.
• Construction of New Sludge Processing Building.
• Installation of Screw Presses for Solids Processing.
• Installation of Dewatering Polymer Feed System.
• Installation of Conveyance System for Solids Handling/Disposal.
• Interconnections to Owner’s SCADA for Control/Monitoring.
• Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
| 12/16/2025 08:45 PM UTC |
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Repair Project HL-SOV-029
City of Lake Charles
WWTP B/C Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-029
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP B/C
1. Remove and dispose of debris in Digester No. 1 (SOV 29).
2. Remove and dispose of debris in Aeration Basin No. 1 (SOV 29.A.1).
| 06/01/2021 07:45 PM UTC |
|
Repair Project HL-SOV-126
City of Lake Charles
WWTP D Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-126
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP D
1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1).
2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2).
3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3).
4. Remove and dispose of debris in Oxidation Ditch No. 1 (SOV 126.A.1).
5. Remove and dispose of debris in Oxidation Ditch No. 2 (SOV 126.A.2).
6. Remove and dispose of debris in Oxidation Ditch No. 3 (SOV 126.A.3).
7. Remove and dispose of debris in Anoxic Tank No. 1 (SOV 126.A.4).
8. Remove and dispose of debris in Anoxic Tank No. 2 (SOV 126.A.5).
| 06/01/2021 07:45 PM UTC |
|
2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
| 06/01/2021 07:45 PM UTC |
|
Various Fire Stations Interior & Exterior Repairs
City of Lake Charles, Louisiana
Various Fire Stations Interior & Exterior Repairs
Project #HL-56, HL-57, HL-58, HL-59, HL-62, HL-119, HL-121, HL-122
Scope of work: Repairs to water damage at interior of buildings consisting of removing and replacing painted sheetrock, ceiling tiles and other items at select stations. Exterior work will consist of fastener replacement at metal roofs and fence / gate replacement.
| 04/13/2021 07:45 PM UTC |
|
Repair Project HL-SOV-081
City of Lake Charles
WWTP A Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-081
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Remove storm blown debris from open top wastewater tanks.
2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill.
3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant.
4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill.
5. The landfilled product shall have a minimum solids content of 16%.
6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP A
1. Remove and dispose of debris in Digester No. 1 (SOV 81.F.1).
2. Remove and dispose of debris in Digester No. 2 (SOV 81.F.2).
3. Pump water/debris from Aeration Basin No. 1 (SOV 81.G.1) to head of plant.
4. Pump water/debris from Aeration Basin No. 2 (SOV 81.G.2) to head of plant.
5. Pump water/debris from Aeration Basin No. 3 (SOV 81.G.3) to head of plant.
6. Pump water/debris from Aeration Basin No. 4 (SOV 81.G.4) to head of plant.
| 04/13/2021 07:45 PM UTC |
|
Repair Project HL-SOV-029
City of Lake Charles
WWTP B/C Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-029
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Remove storm blown debris from open top wastewater tanks.
2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill.
3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant.
4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill.
5. The landfilled product shall have a minimum solids content of 16%.
6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP B/C
1. Remove and dispose of debris in Digester No. 1 (SOV 29).
2. Pump water/debris from Aeration Basin No. 1 (SOV 29.A.1) to head of plant.
| 04/13/2021 07:45 PM UTC |
|
Repair Project HL-SOV-126
City of Lake Charles
WWTP D Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-126
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Remove storm blown debris from open top wastewater tanks.
2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill.
3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant.
4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill.
5. The landfilled product shall have a minimum solids content of 16%.
6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP D
1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1).
2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2).
3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3).
4. Pump water/debris from Oxidation Ditch No. 1 (SOV 126.A.1) to head of the plant.
5. Pump water/debris from Oxidation Ditch No. 2 (SOV 126.A.2) to head of the plant.
6. Pump water/debris from Oxidation Ditch No. 3 (SOV 126.A.3) to head of the plant.
7. Pump water/debris from Anoxic Tank No. 1 (SOV 126.A.4) to head of the plant.
8. Pump water/debris from Anoxic Tank No. 2 (SOV 126.A.5) to head of the plant.
9. Pump water/debris from Anoxic Tank No. 3 (SOV 126.A.6) to head of the plant.
| 04/13/2021 07:45 PM UTC |
|
Project No. HL-201
City of Lake Charles, Louisiana
City of Lake Charles Emergency Traffic Control Signals
HL-201
The work consists of the installation of new traffic signals, complete and operable,
including but not limited to actuated traffic controller, pull boxes, poles, mast arms,
foundations, conduits, luminaire support, cables, wire, connection fees, coordination with
Entergy and City of Lake Charles Traffic Department, and the removal of existing traffic
signals. This new equipment is to be installed at the intersection as shown on the plans.
Unless otherwise specified, all materials shall be new.
Existing equipment to be removed shall be removed in such manner as to avoid damage
to said equipment, and proper care and protection shall be exercised after its removal.
All incidental parts which are not shown on the plans, or specified herein or in the Special
Provisions, and which are necessary to complete the traffic signal or other electrical
systems or required for modifying existing systems, shall be furnished and installed as
though such parts were shown on the plans or specified herein. All systems shall be
complete and in operation to the satisfaction of the Engineer at the time of final
acceptance.
| 03/30/2021 07:45 PM UTC |
|
Project No. HL-54
City of Lake Charles, Louisiana
Storm Repairs – Old City Hall Interiors
HL - 54
Scope of Work: Restoration of interior finishes damaged during Hurricanes Laura and
Delta.
Work involves removal and reapplication of plaster off of wood lath backing at ceiling
and wall locations throughout. Repair of damaged gypsum drywall assemblies in other
locations. Sanding and refinishing of existing wood floor. New paint and trim stained
throughout. Miscellaneous repairs to plaster walls. Salvage, repair, and reinstallation of
door hardware and fixtures as necessary.
| 03/23/2021 07:45 PM UTC |
|
Project No. HL-02
City of Lake Charles, Louisiana
Hurricane Laura Storm Repairs - Henry Heights Park
HL - 02
The Work includes repairs to existing park facilities including ball fields, concession stands,
restrooms, bleachers and covers.
a. Repair existing bleacher cover structures. Replace damaged bleachers.
b. Chain-link fencing repair/replacement.
c. Repairs to lighting and mechanical systems.
d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing,
flooring, painting etc.
| 03/23/2021 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.