General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3427
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT B/C SLUDGE PROCESSING IMPROVEMENTS CAPITAL PROJECT NUMBER CP3427 I. Scope of Services: Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following: • Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors. • Installation of Access Hardware for Operation/Maintenance of Digestors. • Construction of New Blower Building for Process Equipment. • Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion. • Construction of New Motor Control Center. • Reconstruction of Existing Sludge Pump Station. • Construction of New Sludge Processing Building. • Installation of Screw Presses for Solids Processing. • Installation of Dewatering Polymer Feed System. • Installation of Conveyance System for Solids Handling/Disposal. • Interconnections to Owner’s SCADA for Control/Monitoring. • Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
12/16/2025 08:45 PM UTC
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana Muirfield Drive Drainage-Phase II Project No. 2025-748 Capital Project No. 3224 The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
01/06/2026 08:45 PM UTC
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726 Capital Project No. 3019 Sale Road Bridge Repair City of Lake Charles, LA The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes: • Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall; • Replace failed drainage concrete pipe and boxes; • Removal and replacement of reinforced concrete pavement; • The associated traffic management, including detour signage.
01/06/2026 08:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP HL-14
City of Lake Charles, Louisiana Emergency Generator Replacement of Lake Charles Civic Center CP HL-14 Scope of Work: Disconnect and abandon the existing non-functioning diesel generator. Disconnect and remove the existing automatic transfer switch. Provide and install a new 350kw / 437.5kva 277/480v 3p 4w diesel generator in a weatherproof sound attenuated enclosure mounted onto a UL2085 diesel storage tank. Mount onto a new concrete slab adjacent to the cooling tower – east side. Provide and install new underground feeders thru the basement to a new Automatic Transfer Switch - ATS location and reconnect all previous feeds/loads.
08/03/2021 07:45 PM UTC
Project #HL-66
City of Lake Charles, Louisiana LCPD Central Station Restoration- Project # HL-66 Scope of Work: Remove and install new roofing over the existing building and parking canopy against building. Repair indoor water damage at front lobby and at men’s and women’s restroom and janitor closet.
08/03/2021 07:45 PM UTC
RFQ #2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
08/03/2021 07:45 PM UTC
CP 3339
City of Lake Charles, Louisiana Lakefront Parking Garage – Phase II CP 3339 Lakefront Parking Garage – Phase II Estimate of Probable Cost 6/3/2021 1. The Work includes repairs to existing parking garage structure. a. Demolition and removal of misc. metal and CMU walls. b. Replacement of existing electrical equipment, new lighting & specialty lighting. c. New storefront systems for elevator lobby. d. New curtain wall system. e. New exterior metal stair units. f. Repairs to existing buildings including roofing, fascia, soffit, pre-finished metal siding, framing, sheathing, flooring, re-painting etc. g. New retaining wall foundations and waterproofing. h. Fascade replacement of pre-finished metal wall panels. i. Re-stripping of parking area & misc. painting.
07/20/2021 07:45 PM UTC
HL - 02, 06, 135, 136
City of Lake Charles, Louisiana Hurricane Laura storm Repairs – Multiple Ball Park Repairs HL - 02, 06, 135, 136 1. The Work includes repairs to multiple existing park facilities including ball fields, concession stands, restrooms, bleachers and covers. a. Repair existing bleacher cover structures. Replace damaged bleachers. b. Chain-link fencing repair/replacement. c. Repairs to lighting and mechanical systems. d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, gypsum board, painting etc.
07/20/2021 07:45 PM UTC
HL - 55
City of Lake Charles, Louisiana Hurricane Laura Storm Repairs – Central School - Interiors HL - 55 The general scope of work will include repair to damaged plaster walls and ceilings, repainting, repair/replacement of damaged wood trim, wood floor repair, carpet replacement, installing a new mechanical yard for replaced HVAC systems, electrical repairs, misc. plumbing and site drainage repairs.
07/20/2021 07:45 PM UTC
CP3231
City of Lake Charles, Louisiana 2nd Street Rehabilitation (6th Avenue to 8th Avenue) CP3231 The referenced project will include the following improvements to 2nd Street from 6th Avenue to 8th Avenue: • Rehabilitation of existing asphalt roadway with cement stabilized base and new asphalt pavement • Installation of concrete sidewalk • Installation of subsurface drainage system
07/20/2021 07:45 PM UTC
Project No. CP 3316
City of Lake Charles, Louisiana Mallard Golf Club Lake Charles Clubhouse & Pro Shop CP 3316 New 7000 SF Clubhouse facility will include Pro Shop, Offices, Restrooms, Dinning/Bar and Kitchen
07/06/2021 07:45 PM UTC
HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the chemical feed systems at the Center East, Center West, Chennault, and McNeese Water Treatment Plants, to the point where the systems are not operational. This project will serve to re‐instate operation of ALL chemical feed systems and return the water system to its pre‐storm operation. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of mechanical and electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR‐4559‐LA), to reinstate the damaged systems to pre‐storm conditions and to upgrade these existing systems to coincide with newly applicable codes, standards, and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Center East Water Treatment Plant (3207 Center Street) • Chlorine Feed System (Insurance SOV #101) o Remove and Replace Exterior Door w/Panic Hardware and Inspection Window o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4) • Fluoride Feed System (Insurance SOV #102) o Removal and Disposal of ~600 Gallons of Diluted Chemical o Repair Apparent Leak on Bulk Storage Discharge Line (1‐Inch) o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Phosphate Feed System (Insurance SOV #104) o Removal and Disposal of ~700 Gallons of Diluted Chemical o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure o Remove and Replace Damaged Exhaust Fan on Fiberglass Enclosure o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Caustic Feed System (Insurance SOV #108) o Removal and Disposal of ~700 Gallons of Diluted Chemical o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Remove and Replace Seal Fittings on Existing Junction Box (TYP. of 3, 3/4”) o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity Center West Water Treatment Plant (3208 Center Street) • Caustic Feed System (Insurance SOV #103) o Removal and Disposal of ~1,300 Gallons of Diluted Chemical o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Remove and Replace Damaged Isolation Valve on Bulk Storage Discharge (1‐Inch) o Furnish and Install 200 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Phosphate Feed System (Insurance SOV #105) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports o Re‐Terminate Electrical Service from Pump Building and Well Controls o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Fluoride Feed System (Insurance SOV #106) o Removal and Disposal of ~1,100 Gallons of Diluted Chemical o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity Chennault Water Treatment Plant (1501 W. Main Street) • Caustic Feed System (Insurance SOV #95) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Furnish and Install Electrical Wiring/Conduit for Electrical Service and Controls o Terminate Electrical Service into Existing Low Voltage Panelboard and QDS PLC o Furnish/Install/Relocate Fiberglass Enclosure w/Appurtenances o Re‐Terminate into Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 150 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Chlorine Feed System (Insurance SOV #96) o Remove and Replace Exterior Door w/Panic Hardware and Inspection Window o Remove and Replace Damaged Exterior Windows (TYP. of 3) o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4) • Fluoride Feed System (Insurance SOV #98) o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Phosphate Feed System (Insurance SOV #99) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Furnish and Install Electrical Wiring/Conduit for Electrical Service and Controls o Terminate Electrical Service into Existing Low Voltage Panelboard and QDS PLC o Furnish/Install/Relocate Fiberglass Enclosure w/Appurtenances o Re‐Terminate into Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity McNeese Water Treatment Plant (617 E. McNeese Street) • Caustic Feed System (Insurance SOV #110) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Furnish and Install 200 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Chlorine Feed System (Insurance SOV #112) o Remove and Replace Damaged Electrical Conduit & Wiring w/Support Brackets o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4) o Remove/Replace/Anchor Fiberglass Enclosure w/Appurtenances • Fluoride Feed System (Insurance SOV #113) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports o Re‐Terminate Electrical Service from Pump Building and Well Controls o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Phosphate Feed System (Insurance SOV #114) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports o Re‐Terminate Electrical Service from Pump Building and Well Controls o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
07/06/2021 07:45 PM UTC
Repair Project HL-SOV-081
City of Lake Charles WWTP A Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-081 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP A 1. Remove and dispose of settled debris in Digester No. 1 (SOV 81.F.1). 2. Remove and dispose of settled debris in Digester No. 2 (SOV 81.F.2). 3. Remove and dispose of settled debris in Aeration Basin No. 1 (SOV 81.G.1). 4. Remove and dispose of settled debris in Aeration Basin No. 2 (SOV 81.G.2). 5. Remove and dispose of settled debris in Aeration Basin No. 3 (SOV 81.G.3). 6. Remove and dispose of settled debris in Aeration Basin No. 4 (SOV 81.G.4).
06/01/2021 07:45 PM UTC
151 - 160 of 385 Solicitations
1 2 12 13 14 16 18 19 20 38 39