City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP3511
Huber Park Playground and Parking Improvements
Lake Charles City Project No. CP3511
1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park.
2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
| 05/06/2025 07:45 PM UTC |
CP3450
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT ‘A’
OPERATIONAL RELIABILITY IMPROVEMENTS
LIFT STATION ELECTRICAL UPGRADES
CAPITAL PROJECT NUMBER CP3450
I. Scope of Services:
Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following:
• Booker Street Lift Station (120 N. Booker Street)
o Earthwork to Erect Access Driveways for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• N. Blake Street Lift Station (1306 N. Blake Street)
o Clearing and Grubbing to Facilitate the Work
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Opelousas Street Lift Station (3038 Opelousas Street)
o Furnish and Install Domestic Water Service
o Furnish and Install Bypass Connection for Temporary Service
o Remove and Replace Existing Wet Well Topping Slab and Valve Vault
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation
o Removal and Replacement of Existing Electrical Rack
o Installation and Commissioning of an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Installation and Commissioning of a Duplex Pump Control Panel
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Broad Street Lift Station (3219 Broad Street)
o Furnish and Install Bypass Connection for Temporary Service
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• 3rd Ave. & 3rd St. Lift Station (949 Third Avenue)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Colletta Street Lift Station (2218 Colletta Street)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• St. John Street Lift Station (1318 St. John Street)
o Furnish and Install Bypass Connection for Temporary Service
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Cline Street Lift Station (2715 Cline Street)
o Clearing and Grubbing to Facilitate the Work
o Erection of Concrete Revetment for Embankment Protection
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
| 05/20/2025 07:45 PM UTC |
CP2876
CITY OF LAKE CHARLES, LOUISIANA
CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT
CAPITAL PROJECT NUMBER CP2876
I. Background:
In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide.
II. Scope of Services:
Design of complete electrical and back-up power solutions. This Work shall include:
• Furnish and Install 450KW, Natural Gas Generator
• Furnish and Install an Automatic Transfer Switch
• Installation of Generator Slab
• Installation of a new exterior MCC building
• Installation of a new MCC
• Installation of splice blocks, conduit and wire to extend existing feeds to MCC building.
• Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc.
• Interconnections of Generator/MCC improvements to existing infrastructure
| 05/20/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Project #HL-66
City of Lake Charles, Louisiana
LCPD Central Station Restoration-
Project # HL-66
Scope of Work:
Remove and install new roofing over the existing building and parking canopy against building. Repair indoor water damage at front lobby and at men’s and women’s restroom and janitor closet.
| 08/03/2021 07:45 PM UTC |
RFQ #2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
| 08/03/2021 07:45 PM UTC |
CP 3339
City of Lake Charles, Louisiana
Lakefront Parking Garage – Phase II
CP 3339
Lakefront Parking Garage – Phase II
Estimate of Probable Cost
6/3/2021
1. The Work includes repairs to existing parking garage structure.
a. Demolition and removal of misc. metal and CMU walls.
b. Replacement of existing electrical equipment, new lighting & specialty lighting.
c. New storefront systems for elevator lobby.
d. New curtain wall system.
e. New exterior metal stair units.
f. Repairs to existing buildings including roofing, fascia, soffit, pre-finished metal siding, framing, sheathing, flooring, re-painting etc.
g. New retaining wall foundations and waterproofing.
h. Fascade replacement of pre-finished metal wall panels.
i. Re-stripping of parking area & misc. painting.
| 07/20/2021 07:45 PM UTC |
HL - 02, 06, 135, 136
City of Lake Charles, Louisiana
Hurricane Laura storm Repairs – Multiple Ball Park Repairs
HL - 02, 06, 135, 136
1. The Work includes repairs to multiple existing park facilities including ball fields, concession
stands, restrooms, bleachers and covers.
a. Repair existing bleacher cover structures. Replace damaged bleachers.
b. Chain-link fencing repair/replacement.
c. Repairs to lighting and mechanical systems.
d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, gypsum board, painting etc.
| 07/20/2021 07:45 PM UTC |
HL - 55
City of Lake Charles, Louisiana
Hurricane Laura Storm Repairs – Central School - Interiors
HL - 55
The general scope of work will include repair to damaged plaster walls and ceilings, repainting, repair/replacement of damaged wood trim, wood floor repair, carpet replacement, installing a new mechanical yard for replaced HVAC systems, electrical repairs, misc. plumbing and site drainage repairs.
| 07/20/2021 07:45 PM UTC |
CP3231
City of Lake Charles, Louisiana
2nd Street Rehabilitation (6th Avenue to 8th Avenue) CP3231
The referenced project will include the following improvements to 2nd Street from 6th Avenue to 8th Avenue:
• Rehabilitation of existing asphalt roadway with cement stabilized base and new asphalt pavement
• Installation of concrete sidewalk
• Installation of subsurface drainage system
| 07/20/2021 07:45 PM UTC |
Project No. CP 3316
City of Lake Charles, Louisiana
Mallard Golf Club Lake Charles
Clubhouse & Pro Shop
CP 3316
New 7000 SF Clubhouse facility will include Pro Shop, Offices, Restrooms, Dinning/Bar and Kitchen
| 07/06/2021 07:45 PM UTC |
HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA
HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM
WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
I. Background:
Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the chemical feed systems at the Center East, Center West, Chennault, and McNeese Water Treatment Plants, to the point where the systems are not operational. This project will serve to re‐instate operation of ALL chemical feed systems and return the water system to its pre‐storm operation. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards.
II. Scope of Services:
Design and implementation of mechanical and electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR‐4559‐LA), to reinstate the damaged systems to pre‐storm conditions and to upgrade these existing systems to coincide with newly applicable codes, standards, and regulations as imposed by governmental bodies with the appropriate jurisdictional authority.
This Work shall include the following:
Center East Water Treatment Plant (3207 Center Street)
• Chlorine Feed System (Insurance SOV #101)
o Remove and Replace Exterior Door w/Panic Hardware and Inspection Window
o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4)
• Fluoride Feed System (Insurance SOV #102)
o Removal and Disposal of ~600 Gallons of Diluted Chemical
o Repair Apparent Leak on Bulk Storage Discharge Line (1‐Inch)
o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent
o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Phosphate Feed System (Insurance SOV #104)
o Removal and Disposal of ~700 Gallons of Diluted Chemical
o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure
o Remove and Replace Damaged Exhaust Fan on Fiberglass Enclosure
o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Caustic Feed System (Insurance SOV #108)
o Removal and Disposal of ~700 Gallons of Diluted Chemical
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Remove and Replace Seal Fittings on Existing Junction Box (TYP. of 3, 3/4”)
o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure
o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
Center West Water Treatment Plant (3208 Center Street)
• Caustic Feed System (Insurance SOV #103)
o Removal and Disposal of ~1,300 Gallons of Diluted Chemical
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Remove and Replace Damaged Isolation Valve on Bulk Storage Discharge (1‐Inch)
o Furnish and Install 200 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Phosphate Feed System (Insurance SOV #105)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports
o Re‐Terminate Electrical Service from Pump Building and Well Controls
o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances
o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Fluoride Feed System (Insurance SOV #106)
o Removal and Disposal of ~1,100 Gallons of Diluted Chemical
o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure
o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
Chennault Water Treatment Plant (1501 W. Main Street)
• Caustic Feed System (Insurance SOV #95)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Furnish and Install Electrical Wiring/Conduit for Electrical Service and Controls
o Terminate Electrical Service into Existing Low Voltage Panelboard and QDS PLC
o Furnish/Install/Relocate Fiberglass Enclosure w/Appurtenances
o Re‐Terminate into Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 150 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Chlorine Feed System (Insurance SOV #96)
o Remove and Replace Exterior Door w/Panic Hardware and Inspection Window
o Remove and Replace Damaged Exterior Windows (TYP. of 3)
o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4)
• Fluoride Feed System (Insurance SOV #98)
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure
o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Phosphate Feed System (Insurance SOV #99)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Furnish and Install Electrical Wiring/Conduit for Electrical Service and Controls
o Terminate Electrical Service into Existing Low Voltage Panelboard and QDS PLC
o Furnish/Install/Relocate Fiberglass Enclosure w/Appurtenances
o Re‐Terminate into Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
McNeese Water Treatment Plant (617 E. McNeese Street)
• Caustic Feed System (Insurance SOV #110)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Furnish and Install 200 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Chlorine Feed System (Insurance SOV #112)
o Remove and Replace Damaged Electrical Conduit & Wiring w/Support Brackets
o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4)
o Remove/Replace/Anchor Fiberglass Enclosure w/Appurtenances
• Fluoride Feed System (Insurance SOV #113)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports
o Re‐Terminate Electrical Service from Pump Building and Well Controls
o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances
o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Phosphate Feed System (Insurance SOV #114)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports
o Re‐Terminate Electrical Service from Pump Building and Well Controls
o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances
o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
| 07/06/2021 07:45 PM UTC |
Repair Project HL-SOV-081
City of Lake Charles
WWTP A Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-081
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP A
1. Remove and dispose of settled debris in Digester No. 1 (SOV 81.F.1).
2. Remove and dispose of settled debris in Digester No. 2 (SOV 81.F.2).
3. Remove and dispose of settled debris in Aeration Basin No. 1 (SOV 81.G.1).
4. Remove and dispose of settled debris in Aeration Basin No. 2 (SOV 81.G.2).
5. Remove and dispose of settled debris in Aeration Basin No. 3 (SOV 81.G.3).
6. Remove and dispose of settled debris in Aeration Basin No. 4 (SOV 81.G.4).
| 06/01/2021 07:45 PM UTC |
Repair Project HL-SOV-029
City of Lake Charles
WWTP B/C Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-029
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP B/C
1. Remove and dispose of debris in Digester No. 1 (SOV 29).
2. Remove and dispose of debris in Aeration Basin No. 1 (SOV 29.A.1).
| 06/01/2021 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.