City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project #CP3303
City of Lake Charles, Louisiana
Transit Storage Paving
Project #CP3303
The project consists of the new construction of a 20,000 square foot of paving and 25,000 square of aggregate lay down area.
| 10/05/2021 07:45 PM UTC |
|
CP 3336
City of Lake Charles, Louisiana
Oak Park Lateral Drainage Improvements
CP 3336
Project scope consists of improvements to subsurface storm drainage system along lateral streets adjoining Oak Park Boulevard. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as new storm drain inlets and subsurface piping to improve drainage flow and maintain the integrity of the property through which it serves.
Project scope includes locations along Oak Park Boulevard and neighboring streets between 1st Avenue and 4th Avenue.
| 10/05/2021 07:45 PM UTC |
|
Project No. 2021-710 Capital Project No. 3391
Project No. 2021-710
Capital Project No. 3391
West Oak Lane Drainage
City of Lake Charles, LA
The general scope of work for this project is the installation of new underground drainage on the north and south sides of West Oak Lane from Ryan Street west to Olive Street. This new system will extend south on the east side of Olive Street to an existing 48” storm drainage pipe located approximately 400 feet south of W. Oak Lane. This new underground system will consist of new drainage inlets and pipe ranging from 12” to 30” in diameter, as well as associated pavement work.
| 10/05/2021 07:45 PM UTC |
|
RFP #2021-22, File ID #151-21
Request for Proposals for Automated Water Meter Infrastructure (AMI) System
| 08/17/2021 07:45 PM UTC |
|
RFP #2021-24
Program Management of the Critical Drainage Improvement Program
| 08/17/2021 07:45 PM UTC |
|
Project #HL-67 & HL-68
City of Lake Charles, Louisiana
Communications Tower – 706 Enterprise Boulevard
Project #HL-67 & HL-68
Base Bid:
1. Provide a new 350’ tall communications with associated site and foundation concrete drill shafts.
2. Attached antennae and cabling.
3. Commission tower to designed function & capacity.
Alternate #1:
1. Extend tower height to 450’ as specified.
| 08/17/2021 07:45 PM UTC |
|
Project No. 2018-681 Capital Project No. 3279
Project No. 2018-681
Capital Project No. 3279
6th Avenue Reconstruction
3rd Street to 6th Street
City of Lake Charles, LA
The general scope of work for Project No. 2018-681, 6th Avenue Reconstruction from 3rd Street to 6th Street includes the following:
a. Reconstruction of roadways
b. Storm drainage improvements
c. New water distribution system
d. New sidewalks & ADA compliant sidewalk ramps
| 08/17/2021 07:45 PM UTC |
|
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA
HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM
WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
The Contractor shall furnish all labor, materials, equipment, tools, services, supervision, and incidentals required to complete the Work as shown on the Plans and specified herein. This Work includes, but is not necessarily limited to, the following:
1. Chlorine Feed System (Insurance SOV #101) @ Center East WTP (3207 Center Street)
a. Remove and Replace Exterior Door w/Panic Hardware
b. Remove and Replace Security Chains for Chlorine Cover
2. Fluoride Feed System (Insurance SOV #102) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
3. Phosphate Feed System (Insurance SOV #104) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
4. Caustic Feed System (Insurance SOV #108) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Remove and Replace Bulk Storage Tank
5. Caustic Feed System (Insurance SOV #103) @ Center West WTP (3208 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Furnish and Install Day Tank w/Transfer Pump
d. Remove and Replace Bulk Storage Tank
6. Phosphate Feed System (Insurance SOV #105) @ Center West WTP (3208 Center Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
7. Fluoride Feed System (Insurance SOV #106) @ Center West WTP (3208 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
8. Caustic Feed System (Insurance SOV #95) @ Chennault WTP (1501 W. Main Street)
a. Furnish and Install Fiberglass Enclosure
b. Furnish and Install Electrical Wiring/Conduit
c. Furnish and Install Process Piping
d. Furnish and Install New Bulk Fill Line (2-Inch)
e. Furnish and Install Duplex Metering Pump Skid
f. Furnish and Install Day Tank w/Transfer Pump
g. Remove and Replace Bulk Storage Tank
9. Chlorine Feed System (Insurance SOV #96) @ Chennault WTP (1501 W. Main Street)
a. Remove and Replace Exterior Door w/Panic Hardware
b. Remove and Replace Exterior Single-Pane Windows
c. Remove and Replace Security Chains for Chlorine Cover
10. Fluoride Feed System (Insurance SOV #98) @ Chennault WTP (1501 W. Main Street)
a. Furnish and Install Electrical Wiring/Conduit
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Remove and Replace Bulk Storage Tank
11. Phosphate Feed System (Insurance SOV #99) @ Chennault WTP (1501 W. Main Street)
a. Remove and Replace Fiberglass Enclosure
b. Furnish and Install Electrical Wiring/Conduit
c. Furnish and Install New Bulk Fill Line (2-Inch)
d. Furnish and Install Duplex Metering Pump Skid
e. Furnish and Install Day Tank w/Transfer Pump
f. Remove and Replace Bulk Storage Tank
12. Caustic Feed System (Insurance SOV #110) @ McNeese WTP (617 E. McNeese Street)
a. Furnish and Install New Bulk Fill Line (2-Inch)
b. Furnish and Install Day Tank w/Transfer Pump
c. Remove and Replace Bulk Storage Tank
13. Chlorine Feed System (Insurance SOV #112) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Remove and Replace Security Chains for Chlorine Cover
14. Fluoride Feed System (Insurance SOV #113) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
15. Phosphate Feed System (Insurance SOV #114) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
| 08/17/2021 07:45 PM UTC |
|
Project No. 2019-697 Capital Project No. 3288
Project No. 2019-697
Capital Project No. 3288
Holly Hill Road Sewer Line Rehabilitation Phase 3
City of Lake Charles, LA
The general scope of work for Project No. 2019-697, Capital Project No. 3288, includes the rehabilitation of approximately 2500 feet of 48-inch sewer main by cured-in-place (CIPP) lining including sewer manholes on Holly Hill Road from Wickersham Drive/Moss Loop north to Chrysler Street. Sewer manhole rehabilitation to continue northerly to Prien Lake Road Roundabout.
| 08/03/2021 07:45 PM UTC |
|
Project Number HL-SOV-93
CITY OF LAKE CHARLES, LOUISIANA
HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM
GEORGE H. WEST WATER TREATMENT PLANT
WELLS G-8 & G-9 STARTER REPLACEMENTS
PROJECT NUMBER HL-SOV-93
I. Background:
Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the motor starters/cabinets on wells G-8 and G-9 which are located at the N. Ryan and Railroad Ave well site associated with the Water Treatment Plant. The damage to the starters is to the point where functions of the systems no longer provide reliable operation and are in need of replacement. This project will serve to replace the starters, controls, and cabinets associated with Wells G-8 and G-9 and return the water system to its pre-storm operation. This project is necessary to ensure the City of Lake Charles is able to adequately provide reliable service to their consumers.
II. Scope of Work:
Implementation of electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA), to reinstate damaged well starters to their pre-storm condition, as well as, improve equipment installation in conformance with applicable codes and standards and improve the ability of the Owner to service and maintain the proposed equipment. This Work shall include:
• Removal and Disposal of Existing, Defective Starter Cabinets
• Installation of Pad-Mounted 2,300V to 480V Transformer
• Installation of Main Service Disconnect (per Entergy requirements)
• Installation of MCC with Starter Cabinets for Well Starters w/Soft Starts
• Installation of Service Disconnect for Each Starter (TYP of 2)
• Removal and Replacement of 150HP Well Motors (TYP of 2)
• Termination of Electrical Connections into Existing Plant Service/Controls
| 08/03/2021 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.