General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3427
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT B/C SLUDGE PROCESSING IMPROVEMENTS CAPITAL PROJECT NUMBER CP3427 I. Scope of Services: Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following: • Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors. • Installation of Access Hardware for Operation/Maintenance of Digestors. • Construction of New Blower Building for Process Equipment. • Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion. • Construction of New Motor Control Center. • Reconstruction of Existing Sludge Pump Station. • Construction of New Sludge Processing Building. • Installation of Screw Presses for Solids Processing. • Installation of Dewatering Polymer Feed System. • Installation of Conveyance System for Solids Handling/Disposal. • Interconnections to Owner’s SCADA for Control/Monitoring. • Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
12/16/2025 08:45 PM UTC
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana Muirfield Drive Drainage-Phase II Project No. 2025-748 Capital Project No. 3224 The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
01/06/2026 08:45 PM UTC
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726 Capital Project No. 3019 Sale Road Bridge Repair City of Lake Charles, LA The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes: • Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall; • Replace failed drainage concrete pipe and boxes; • Removal and replacement of reinforced concrete pavement; • The associated traffic management, including detour signage.
01/06/2026 08:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Project No. 2020-704 Capital Project No. 3177
Project No. 2020-704 Capital Project No. 3177 W. Prien Lake Widening Cove Lane to Ihles Road City of Lake Charles, LA The general scope of work for Project No. 2020-704, W. Prien Lake Road Widening Cove Lane to Ihles Road, includes the following: A. PRIEN LAKE ROAD FROM COVE LANE SOUTH TO IHLES ROAD (APPROXIMATELY 5100 FEET): i. Paving: Construct a new 10” thick, 49- to 61-foot-wide reinforced concrete pavement with integral curb and 12” thick compacted stone base with geogrid reinforcement. Construct a new 5-lane signalized intersection at Sale Road. Construct a new 8-foot-wide concrete sidewalk on the west side and a new 5-foot wide concrete sidewalk on the east side of the street. ii. Water: The existing 12" water line will remain in place where possible. However, portions of this system will be replaced with new including a new 12” waterline on W. Prien Lake Road from Ihles Road west to Prien Terre Road. Additionally, new 8" water taps will be installed and stubbed down Prienwood Drive & Timber Lane for future extension. iii. Sanitary Sewer: A new sewer lift station, along with associated force main, will be installed on the west side of W. Prien Lake Road near Sale Road. New gravity sewer lines shall be installed to incorporate this new lift station as well as extend the existing sewer system. iv. Storm Sewer: Installation of three new underground drainage systems. The northern drainage system will outfall into an existing ditch located on the north side of 3624 W. Prien Lake Road. The central drainage system will outfall approximately 1300 feet down Henderson Bayou Road into Henderson Bayou. The southern drainage system will outfall approximately 500 feet west of the intersection of Prien Lake Road and Ihles Road into Henderson Bayou. All systems will include drainage pipe ranging from 15" to 72" in diameter. B. SALE ROAD FROM PRIEN LAKE ROAD EAST TO RUE CHAN ANN (APPROXIMATELY 2,300 FEET): i. Paving: Construct a new 9” thick (8” thick in “tee” west of West Prien Lake Road), 36-foot-wide reinforced concrete pavement with integral curb and 8” thick compacted stone base. Construct a new 4-foot-wide concrete sidewalk on the north side. ii. Water: The existing 12" water line will remain in place from Prien Lake Road to Phillips Lane. The 12" water line will be replaced and relocated from Phillips Lane east to Rue Chan Ann. iii. Sanitary Sewer: The existing sewer system will remain in place. iv. Storm Sewer: Installation of a new underground drainage system, including drainage pipe as large as 60" in diameter. C. HENDERSON BAYOU ROAD FROM PRIEN LAKE ROAD WEST TO INDIAN BAY DRIVE (APPROXIMATELY 650 FEET): i. Paving: Construct a new 8” thick, 25- to 37-foot-wide reinforced concrete pavement with integral curb and 12” thick compacted stone base with geogrid reinforcement. This portion of Henderson Bayou Road is being reconstructed to introduce a new left turn lane. ii. Storm Sewer: Installation of a new underground drainage system, including drainage pipe as large as 60" in diameter. This new system will serve as the outfall for the central Prien Lake Road drainage system referenced above. The existing 54" drainage line on the south side will remain in place.
03/16/2021 07:45 PM UTC
Project No. 2020-698 Capital Project No. 3360
Project No. 2020-698 Capital Project No. 3360 Foster Street & Riverside Drive Drainage Rehabilitation City of Lake Charles, LA The general scope of work for Project No. 2020-698, Foster Street & Riverside Drive Drainage Rehabilitation consists of the installation of new drainage pipe and catch basins. This includes the removal and reinstallation of the associated roadway pavement and sidewalks, as well as any required waterline adjustments to facilitate the new drainage pipes.
03/16/2021 07:45 PM UTC
HD-SOV-0082 EM-3547-LA Capital Project No. HD-0082
City of Lake Charles North Booker Street Lift Station Repair HD-SOV-0082 EM-3547-LA Capital Project No. HD-0082 I. Scope of Services: Design and implementation of mechanical and electrical repairs, in response to damage incurred as a result of Hurricane Delta (EM-3547-LA), to reinstate the damaged systems to pre-storm conditions and to upgrade these existing systems to coincide with newly applicable codes, standards, and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: 1. Removal and replacement of the three (3) existing motors with three (3) new motors. 2. Removal and replacement of the three (3) existing pumps with three (3) new pumps. 3. Removal and replacement of the one (1) existing sump pump with one (1) new sump pump. 4. Removal and replacement of the one (1) existing ventilation system with one (1) new ventilation system. 5. Removal of the complete electrical systems (main disconnect, meter base, main breakers, starters, controls, SCADA equipment, etc.) all located within the dry-pit of the station. 6. Furnishing and installation of new above grade complete electrical systems (main disconnect, meter base, manual transfer switch, , main breakers, starters, controls, SCADA equipment, etc.). 7. Removal and disposal of all existing valves and piping required for the installation of new pumps. 8. Furnishing and installation of new valves and piping required for the installation of new lift station pumps. 9. Cleaning, preparing and coating of the existing lift station wet well. 10. Furnishing and installation of 6-foot tall chain link fencing with green privacy slats. 11. Furnishing and installation of piping and fittings required for the installation of new pumps, valves, and bypass connection.
03/02/2021 08:45 PM UTC
Project No. HL-16 (REBID)
City of Lake Charles, Louisiana HL-16 DOWNTOWN LAKEFRONT SITE WORK (REBID) ~ City of Lake Charles project, ‘HL-16 DOWNTOWN LAKEFRONT SITE WORK - LAKEFRONT BOARDWALK’ consist of repair and/or replace of site components of the lakefront boardwalk area. The site work consist of concrete pavement removal and build back, brick paving work, Stone relocation, erosion control, rip rap shore line replacement, and concrete landing construction as outlined on the contract documents dated January28, 2021. This project addresses specific damage repairs due to the high winds and heavy rain presented by Hurricane Laura.
03/02/2021 08:45 PM UTC
Project Number HL-55
City of Lake Charles, Louisiana STORM REPAIRS – CENTRAL SCHOOL – ROOF REPLACEMENT HL - 55 Scope of Work 1. Remove existing roof membrane, insulation and related sheet metal items down to the wood deck as indicated on roof plan. 2. Review plans for removal existing mechanical and electrical items. 3. Repair, replace and secure decking as required. 4. At main roof area, mechanically attach 2.5” and 2” Polyisocyanurate insulation (V.O.J.), 1/4” tapered Polyisocyanurate crickets and ½” gyp board together into the wood deck. Over base layer of insulation, contractor shall loose lay fire retardant slip sheet. 5. At North roof area, mechanically attach 2.5” and 2” Polyisocyanurate insulation (V.O.J.), 1/8” tapered Polyisocyanurate and ½” gyp board together into the wood deck. Over base layer of insulation, contractor shall loose lay fire retardant slip sheet. 6. Install specified Hot Mop applied SBS Modified roofing system. 7. Install two ply modified base flashing systems. 8. Install new through wall scuppers, counter flashings and miscellaneous sheet metal items as specified. 9. Terminate flashings on top of parapet wall and seal as Detailed. 10. Issue specified 30-year warranty for SBS Roofing & 75-year warranty for Slate Roofing
02/09/2021 08:45 PM UTC
Project Number HL-48
City of Lake Charles, Louisiana STORM REPAIRS – MALLARD COVE CLUBHOUSE EXTERIOR REPAIRS HL - 48 The Work includes exterior repair and restoration of the Mallard Cove Clubhouse. 1. Replace existing shingle roof, concrete rid caps, gutters and downspouts. 2. Repair/replace existing wood doors and door hardware. 3. Re-painting and refinishing of exterior building elements. 4. Replace select exterior light fixtures. 5. Replace misc. gates. 6. Misc. cleaning and pressure washing.
02/09/2021 08:45 PM UTC
Project Number HL-10
City of Lake Charles, Louisiana STORM REPAIRS – PURPLE HEART ROOF REPLACEMENT HL - 10 A. Project Summary: 1. Remove existing gravel, roof, insulation, metal deck and related sheet metal items down to the existing bar joist. 2. Install new metal decking and treated wood blocking at perimeter. 3. Mechanically attach specified Polyisocyanurate and Gypsum board to the metal deck as specified. 4. Heat fuse one ply of SBS modified base sheet over the insulation. 5. Fabricate and install all miscellaneous sheet metal items. Strip in with SBS modified base sheet. 6. Flash all wall flashing and curb type penetrations with one ply of the specified SBS modified base sheet. 7. Fabricate and install ANSI-SPRI ES-1 metal edge, new drip edge, gutters and downspouts as specified. Strip in with SBS modified base sheet. 8. Install one ply of a high-performance mineral surfaced modified cap sheet across the field of the roof and up 2” above cant strip. Immediately broadcast granules into bleed out. 9. Install one ply of a high-performance mineral surfaced modified cap sheet at all wall flashing and curb type penetrations. 10. Inspect roof area with Owner and Owner’s rep prior to surfacing. 11. After 30 days, apply two applications of the specified protective coating. 12. Issue 30 year NDL warranty with wind rider up to the design pressures in stamped wind uplift calculations.
02/09/2021 08:45 PM UTC
Project Number HL-03
City of Lake Charles, Louisiana HURRICANE LAURA REPAIRS – GOOSPORT – ROOF REPLACEMENT HL - 03 Scope of Work: 1. Remove existing roof membrane, shingles and related sheet metal items down to the wood deck and gypsum deck as indicated on roof plan. 2. Disconnect and raise existing curbs as required to be 8” above finished roof surface as required. 3. At wood deck areas, repair, replace and secure decking as required. 4. At gypsum deck area, repair as specified. 5. Mechanically attach specified base sheet at all roof areas. 6. At wood deck area, loose lay specified base layer of Polyisocyanurate insulation and cover with FR slip sheet, install specified tapered insulation and gypsum board. Fasteners should penetrate into wood deck a minimum of 1. 7. At gypsum deck area, mechanically attach specified gypsum board. 8. Install specified torch applied SBS Modified roofing system. 9. Install two ply modified base flashing systems. 10. Install new drip edge, gutters, downspouts, counter flashings, leads and miscellaneous sheet metal items as specified. 11. Provide and install new pre-fabricated metal coping assembly. 12. Coat entire roof with a non-fibered aluminum coating. 13. Issue specified 30-year warranty.
02/09/2021 08:45 PM UTC
Project Number HL-54
City of Lake Charles, Louisiana STORM REPAIRS – OLD CITY HALL INTERIORS HL - 54 Scope of Work: Restoration of interior finishes damaged during Hurricanes Laura and Delta. Work involves removal and reapplication of plaster off of wood lath backing at ceiling and wall locations throughout. Repair of damaged gypsum drywall assemblies in other locations. Sanding and refinishing of existing wood floor. New paint and trim stained throughout. Miscellaneous repairs to plaster walls. Salvage, repair, and reinstallation of door hardware and fixtures as necessary.
02/09/2021 08:45 PM UTC
Capital Project Number CP3333
CITY OF LAKE CHARLES, LOUISIANA WWTP A – BASIN A-07 SEWER REHABILITATION CAPITAL PROJECT NUMBER CP3333 I. Scope of Services: The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-07. The Work includes, but is not necessarily limited to, the following: Base Bid 1. There is approximately 10,198 LF of 8-inch through 18-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, cured-in-place lining, and manhole lining. This work shall also include the furnishing and installation of three new manholes. Alternate No.1 1. There are approximately 33 active service laterals to be reinstated as part of this project. 2. There is approximately 1,862 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods cured-in-place lining.
02/02/2021 08:45 PM UTC
171 - 180 of 385 Solicitations
1 2 14 15 16 18 20 21 22 38 39