General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-6-1
619 Plantation Blvd Pipe Liner--------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to clean and install a CIPP Liner through the existing pipe to improve drainage as specified along Plantation Blvd (R04D129) located in Mandeville, Louisiana.
02/26/2026 08:00 PM UTC
26-4-2
Area 1 Panel & Curb Replacement---------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to remove and replace concrete panels and concrete rollover and barrier curbs in order to improve roadway conditions, as specified, along Palm Ct (R01J091) Madisonville ; Coconut Palm Dr (R01J092) Madisonville ; Del Sol Ct (R01E025) Covington ; Del Sol E (R01E026) Covington ; Del Sol Pass (R01E024) Covington ; Del Sol W (R01E027) Covington ; Covington Meadow Cir (R03L160) Covington, Louisiana.
03/03/2026 08:00 PM UTC
26-5-2
Hickory Area Drainage Maintenance------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by installing drain pipes, catch basins, and improving the turning radius as specified along the following Parish roads: • Blueberry Lp (R06H009) Pearl River, LA; • E Ridgewood Dr (R06H007) Pearl River, LA; • Mockingbird Lp (R06H010) Pearl River, LA; • Silas Thomas Rd (R06H006) Pearl River, LA; and • W Ridgewood Dr (R06H008) Pearl River, LA
03/04/2026 08:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
24-4-2
Third St Drainage-------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage and turning radius starting at Third Street (R04D025) Section 34 Township 7S Range 11E located in Mandeville, Louisiana.
04/17/2024 07:00 PM UTC
24-7-2
2024 West District Panel Replacement------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as required in specifications along various Parish roads.
04/17/2024 07:00 PM UTC
24-14-1
Autumn Haven Subdivision Sinkholes - Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to increase area drainage by replacing/resealing catch basins, pipe repair, and installing sod, located along Autumn Haven Cir (R04E249) Section 48 Township 8S Range 12E ; Autumn Woods Dr (R04E246) Section 48 Township 8S Range 12E ; Haven Way (R04E247) Section 48 Township 8S Range 12E in Lacombe, Louisiana.
04/04/2024 07:00 PM UTC
24-15-1
Bard Circle Drainage and Panels - The Parish requests a contractor to reseal interior joints of the existing subsurface pipe and remove/replace concrete road panels located along Bard Cir (R08I050) Section 25, Township 9S, Range 14E, located in Slidell, Louisiana.
04/04/2024 07:00 PM UTC
24-10-1
Bel Air Subdivision------The Parish requires the Contractor to improve the roadway by removing, replacing, and repairing concrete panels and curbs along Palmetto Ct. (R09A057) Section 18, Township 8S, Range 14E, and Headwaters Dr. (R09A019) Section 19, Township 8S, Range 14E, located in Slidell, Louisiana.
04/04/2024 07:00 PM UTC
24-11-1
Parma Cir------The Parish requires the Contractor to improve the roadway by removing, replacing, and repairing concrete panels, and mountable curbs along Parma Circle (R01A023) Section 21, Township 6S, Range 10E, located in Covington, Louisiana.
04/04/2024 07:00 PM UTC
23-52-2
S. Military Rd US 190 & Rue Esplanade Water Main------This project includes the installation of PVC (6”, 8”, and 10”) and HDPE (8”, 10”, and 12”) water mains utilizing open cut and directional drilling methods. Also included is the installation of 2” and 1” PE water service lines, Fire Hydrants, Insertion Valves, Tapping Sleeves, Gate Valves, Air Release Valves, Sample Stations, Automatic Flushing Station, Water main tie-ins, Driveway removal and replacement, Drainage removal and replacement, Sodding, Hydroseeding, and other work incidental to the installation of the water main.
04/03/2024 07:00 PM UTC
24-8-1
Foy St Drainage--------The Parish requests a contractor to provide and install new catch basins and pipes, improving drainage, along Foy Street (R04E122) Section 10, Township 8S, Range 11E, located in Mandeville, Louisiana.
04/02/2024 07:00 PM UTC
24-9-1
Amber St.------The Parish requests the Contractor to provide materials necessary to improve the road turnout conditions and subsurface drainage along Amber St (R08M023) Section 6, Township 9S, Range 15E, located in Slidell, Louisiana.
04/02/2024 07:00 PM UTC
24-7-1
Oak Cir Drainage------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage by remove/replace/repairing drainage catch basins as specified on Oak Circle (R08I036) Section 35, Township 8S, Range 14E, located in Slidell, Louisiana. The time period to complete the work shall be forty-five (45) calendar days from issuance of the Notice to Proceed by the Parish. Contractor shall provide all signage and barricades. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
03/28/2024 07:00 PM UTC
221 - 230 of 942 Solicitations
1 2 19 20 21 23 25 26 27 94 95