25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
11/25/2025 08:00 PM UTC
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
12/03/2025 08:00 PM UTC
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
12/03/2025 08:00 PM UTC
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
12/03/2025 08:00 PM UTC
25-65-1
Traffic Calming Program Military Rd PH. 1-------------------------------- The Parish requests a contractor to implement traffic calming improvements by installing asphaltic concrete speed tables, updating related pavement markings and signage within the Cross Gates Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars, with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River, LA.
12/04/2025 08:00 PM UTC
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
12/09/2025 08:00 PM UTC
25-66-1
Chris Kennedy Rd Drainage/Murray Rd Loop ----------------------------------The Parish requests a contractor to improve drainage by removing and replacing driveway culverts and subsurface drainage along Murray Rd Loop in Pearl River, LA, benefiting the Chris Kennedy Lateral, as specified in the project documents.
12/09/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
25-12-2
Lower Tchefuncte Breakwater Restoration----- The scope of work shall include constructing approximately 800’ coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
12/17/2025 08:00 PM UTC
11 Solicitations

Closed Solicitations

Number Deadline
24-5-1
Trace Maintenance Barn - Contractor will remove old ceiling tile, grid, electrical lighting, ceiling and wooden mezzanine flooring. Contractor will replace with new structurally sound lumber to correct sagging ceiling and reinstall lighting fixtures, ceiling grid and ceiling tile. Contractor will remove and dispose of all construction/demo debris.
02/22/2024 08:00 PM UTC
24-1-2
Safe Haven Water Utility Improvements------The work to be performed under this contract consists of furnishing and delivering all labor, materials, supervision, construction equipment, mechanical and electrical equipment not furnished by the St. Tammany Parish Department of Utilities, travel utilities, transportation, supplies, tools and services necessary for performing all work as specified in the Contract Documents, plus whatever work may be added as extra work under the provisions stated elsewhere in these documents.
02/15/2024 08:00 PM UTC
23-56-2
Bigner Rd Turn Lane------The work specified in this project will require the contractor to provide labor, equipment, and material necessary to improve the roadway surface by milling and overlaying approximately 300 feet of asphaltic concrete and installing roadway striping. The intersection of Bigner Rd and State Highway 22 will undergo widening for the addition of a right-hand turn lane, as well as the movement of drainage on the east side of the widened road, as specified along Bigner Rd (R04C017) Section 54 Township 7 Range 11E.
02/08/2024 08:00 PM UTC
24-1-1
Biosolids Transport and Disposal---------------------------------------------------------The Department of Utilities (DU) is solicitating quotes from those who are interested in providing Biosolids Transport and Disposal services including but not limited to; providing roll-off containers, transportation and disposal of non-hazardous biosolids generated from the Parish’s Wastewater Treatment Plant (WWTP) facilities .
02/07/2024 08:00 PM UTC
23-54-2
2023 District 12, 13, 14 Supplemental------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying and patching road surfaces as specified along the following Parish roads: * Garden Dr (R09G051) Section 38 Township 9S Range 14E Slidell; * Jefferson Ave (R09G015) Section 38 Township 9S Range 14E Slidell; * Middle Pearl Dr (R08P010) Section 15 Township 9S Range 15E Slidell; * Possum Hollow Rd (R08U001) Section 11 Township 9S Range 14E Slidell; * Dr. TJ Smith Senior Mem Pkwy (R09I168) Section 30 Township 8S Range 14E Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
01/25/2024 08:00 PM UTC
23-53-2
2023 District 7,9 Supplemental------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along the following Parish roads: * Montmartre St (R04E138) Section 38 Township 8S Range 12E Mandeville; * N 14th St (R07E080) Section 40 Township 8S Range 12E Lacombe; * Nehl St (R07E017) Section 48 Township 8S Range 12E Lacombe; * Oscar St (R04E066) Section 32 Township 7S Range 12E Mandeville; * Paradise Ln (R04E211) Section 48 Township 8S Range 12E Lacombe; * S 12th St (R07G003) Section 40 Township 8S Range 12E Lacombe; * Henry Rd (R08H024) Section 13 Township 8S Range 14E Slidell; * Poplar Dr (R08F022) Section 30 Township 8S Range 15E Slidell.
01/25/2024 08:00 PM UTC
23-55-2
2023 District 2,3 Supplemental-------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces along various District 2 & 3 roads.
01/25/2024 08:00 PM UTC
23-41-2
Pearl River Diversion Canal Restoration--------------------------------------------------The work of this project comprises the dredging of the Pearl River Diversion Canal beginning at the intersection with the W. Pearl River and heading upstream within the canal approximately 1,500 feet. The excavated material will be disposed on site per the plans and a concrete armoring mat system with the necessary embankment work will be installed per the drawings.
01/09/2024 08:00 PM UTC
23-50-2
Cross Gates Water System Well Improvements----New water well, electrical service, and various related items at the Ozone Pines site. Well improvements, utility lines, and related items at the Willow Wood site.
01/09/2024 08:00 PM UTC
23-44-2
Lower W-15 Area Drainage Improvements Phase III – Diversion -----The project includes excavation of earthen materials and associated clearing activities for the construction of a diversion canal between the existing W-15 (French Branch) Canal and the Reine Canal. W-15 Diversion Canal in Slidell between the W-15 Canal and connecting to the Reine Canal. Approximate coordinates for the project are 30°17’35”N and 89°44’32”W.
12/14/2023 08:00 PM UTC