General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-15-2
Emergency Fuel Services
03/17/2026 07:00 PM UTC
26-11-2
Tammany Trace Bridge #24--------------------------------------------------The work to be included under this contract shall consist of furnishing all labor, materials, equipment, tools, supervision, and incidentals necessary for the removal and replacement of the existing bridge structure, earthwork and path base, relocation of existing drainage ditches, installation of concrete and asphalt paving, fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
03/24/2026 07:00 PM UTC
26-14-2
2026 District Panel Replacements-----------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing and/or replacing concrete panels, concrete barriers, rollover curbs, curbs, and gutters as specified along the following Parish roads: - Kepler Lake Ct (R08L055) Slidell, LA; -Lake Michigan Dr (R08L050) Slidell, LA; - Lake Village Blvd (R08L026) Slidell, LA; - W Forest Dr (R08I034) Slidell, LA; - Willow Cir (R08I045) Slidell, LA; - Greenleaves Blvd (R04O060) Mandeville, LA; - Alisa Dr (R09A033) Slidell, LA; - Clearpoint Dr (R09A024) Slidell, LA; - Madeline Ln (R09A063) Slidell, LA; - MCH Rd (R04F064) Mandeville, LA; - Willow Wood Dr (R08M060) Slidell, LA; - Silverwood Dr (R08M062) Slidell, LA; - Goldenwood Dr (R08M061) Slidell, LA; - Larchwood Dr (R08M073) Slidell, LA; - Elizabeth Dr (R09G044) Slidell, LA; - Queen Anne Dr (R09G038) Slidell, LA; - Westminster Dr (R09G033) Slidell, LA; - Trafalgar St (R08V029) Slidell, LA; - Tumblebrook St (R08V025) Slidell, LA; - Foxcroft St (R08V019) Slidell, LA; - Almond Creek Rd (R08V021) Slidell, LA; and - Brookter St (R08V108) Slidell, LA.
03/24/2026 07:00 PM UTC
26-16-2
Rosedown Way Drainage Phase 2-------------- The Contractor shall provide all labor, equipment, tools, testing, and materials necessary to complete drainage improvements in accordance with the construction plans and specifications for the Rosedown Subdivision, located in Mandeville, Louisiana, 70471. The work includes replacement of existing drainage infrastructure along Camden Court, construction of a new concrete-lined channel to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all incidental work, such as replacement of concrete street panels, sidewalks, and driveways, utility relocations, installation of sewer and water conflict boxes, and placement of rip rap at the outfall.
03/31/2026 07:00 PM UTC
26-8-1
123 Kelly Dr. & 222 S. Queens Dr. Drainage---------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials, for cleaning and sealing pipe joints and catch basins, removing and replacing panels, and rebuilding CB-06 to improve drainage as specified along Kelly Dr (R081005) and S Queens Dr (R081072) located in Slidell, Louisiana.
03/31/2026 07:00 PM UTC
26-7-1
Cody Ln Drainage---------------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary for the removal and replacement of existing structures to restore proper drainage, including installing or replacing drain pipes, cleaning existing ditches, driveways, and turnouts, and completing miscellaneous related work and sod restoration as specified along Cody Ln (R020028); located in Covington, Louisiana.
03/31/2026 07:00 PM UTC
26-17-2
Slemmer Rd Drainage Ph 2--------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing, replacing, and/or repairing drainpipes, catch basins, driveways, and sod as specified along Slemmer Rd (R03L006), located in Covington, LA.
04/01/2026 07:00 PM UTC
26-13-2
Justice Center Boilers--------------------------Base Bid to include the removal of (2) existing hot water heating boilers with (1) new boiler to be replaced in a configuration similar to existing. Piping for the second boiler shall be stubbed out and capped for future replacement. A rental boiler shall be included to maintain building heating during the project. A new opening and roll door in the boiler room wall to be installed to accommodate boiler removal and installation as well as future service. The door to the loading dock area will be replaced with a pair of 3'-0" x 8'-0" hollow metal doors and hardware to accommodate boiler replacement.
04/08/2026 07:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
24-12-2
Purchase of 3 Fiberglass Buildings---The work to be done under these Contract Documents is to furnish, crate, and deliver three (3) reinforced fiberglass buildings, complete with all accessories, as specified in these contract documents.
04/25/2024 07:00 PM UTC
24-17-1
S Pebble Beach Ct Drainage - The Parish requires a Contractor to clean, repair, reseal existing interior pipe joints located at 106 S Pebble Beach Ct (R09B020) Section 29, Township 8S, Range 14E, in Slidell, Louisiana.
04/23/2024 07:00 PM UTC
24-16-1
Koop 3rd Floor Buildout - Bldg B - The Parish requires a contractor to provide all labor, materials and equipment necessary to create a new reception room at our Koop Campus Building B – 3rd Floor facility located at 21454 Koop Drive, Mandeville, LA 70471.
04/18/2024 07:00 PM UTC
24-8-2
2024 East District Panel Replacements----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along the following Parish roads: - Brookter St. (R08V118) Section 24 Township 9S Range 14E Slidell; - Churchill St. (R08V033) Section 24 Township 9S Range 14E Slidell; - Clearwood Dr. (R08I040) Section 36 Township 8S Range 14E Slidell; - Dylan Dr. (R08V068) Section 24 Township 9S Range 14E Slidell; - Firwood Dr. (R08I047) Section 26 Township 8S Range 14E Slidell; - Goldenwood Dr. (R08M061) Section 38 Township 9S Range 15E Slidell; - Heather Dr. (R08I053) Section 25 Township 8S Range 14E Slidell; - Heather Ln. (R08V048) Section 24 Township 9S Range 14E; and - Hempstead St. (R08V030) Section 24 Township 9S Range 14E Slidell; - Kingspoint Blvd. (R08V016) Section 13 Township 9S Range 14E Slidell; - Lakeshore Blvd N. (R09J109) Section 34 Township 9S Range 14E Slidell; - N Caleb Dr. (R08N101) Section 37 Township 9S Range 15E Slidell; - Wellington Ln. (R08V031) Section 24 Township 9S Range 14E Slidell; - Windrift Dr. (R08V017) Section 13 Township 9S Range 14E Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
04/18/2024 07:00 PM UTC
24-5-2
Tchefuncte Habitat Restoration------------------------------------------------------------- The work of this project includes the construction of a pier 300’ in length, construction of a rock breakwater approximately 400’ in length, and the construction of a vinyl sheet pile bulkhead around the existing peninsula of the Tchefuncte River Lighthouse.
04/18/2024 07:00 PM UTC
24-4-2
Third St Drainage-------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage and turning radius starting at Third Street (R04D025) Section 34 Township 7S Range 11E located in Mandeville, Louisiana.
04/17/2024 07:00 PM UTC
24-7-2
2024 West District Panel Replacement------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as required in specifications along various Parish roads.
04/17/2024 07:00 PM UTC
24-14-1
Autumn Haven Subdivision Sinkholes - Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to increase area drainage by replacing/resealing catch basins, pipe repair, and installing sod, located along Autumn Haven Cir (R04E249) Section 48 Township 8S Range 12E ; Autumn Woods Dr (R04E246) Section 48 Township 8S Range 12E ; Haven Way (R04E247) Section 48 Township 8S Range 12E in Lacombe, Louisiana.
04/04/2024 07:00 PM UTC
24-15-1
Bard Circle Drainage and Panels - The Parish requests a contractor to reseal interior joints of the existing subsurface pipe and remove/replace concrete road panels located along Bard Cir (R08I050) Section 25, Township 9S, Range 14E, located in Slidell, Louisiana.
04/04/2024 07:00 PM UTC
24-10-1
Bel Air Subdivision------The Parish requires the Contractor to improve the roadway by removing, replacing, and repairing concrete panels and curbs along Palmetto Ct. (R09A057) Section 18, Township 8S, Range 14E, and Headwaters Dr. (R09A019) Section 19, Township 8S, Range 14E, located in Slidell, Louisiana.
04/04/2024 07:00 PM UTC
221 - 230 of 947 Solicitations
1 2 19 20 21 23 25 26 27 94 95