General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-5-2
Pinnacle Parkway------------------------------------------------The work specified in this project will require the contractor to provide the labor, equipment, and materials necessary to improve the roadway surface along Pinnacle Parkway (R01D020) Section 47, Township 7S Range 11E, Mandeville, LA.
04/30/2025 07:00 PM UTC
25-23-1
Solomon Dr. Sinkhole Repair----------------------------------The Parish requests a contractor to repair the sinkhole by cleaning/repairing/resealing the catch basin and interior pipe joints on Solomon Dr., Covington, LA 70433
04/30/2025 07:00 PM UTC
25-22-1
Lenwood Dr Pond & Lowe Pond Fence Repairs----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to repair existing fence and install new fence and gates, as specified along Lenwood Dr (P08IW01132); and Lowe Pond (P08AW02007) located in Slidell, Louisiana.
04/30/2025 07:00 PM UTC
25-14-2
Official Journal ----The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
05/06/2025 07:00 PM UTC
25-26-1
Lake Erie Dr Drainage -------The Parish requests a contractor to repair/replace/reseal existing structure(s) to restore area drainage by repair/replace/reseal drain pipe, catch basin, and sod, as specified along Lake Erie Dr (R08L056); located in Slidell, Louisiana.
05/06/2025 07:00 PM UTC
25-13-2
Coroner Chiller Addition--- This Project consists of the addition of one 200-ton Chiller and the furnishing and installation of new piping systems to connect to existing piping in existing building systems as shown on the drawings. The Project also consists of removing the existing and providing new Temperature Control devices as shown on drawings.
05/14/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
23-50-1
Brookside Drive Drainage Improvements--------------------------------------------------------The Parish requires a Contractor to remove concrete walks and drives, remove pipe(storm drain), clean ditches, and concrete as specified on Brookside Drive (R04D035;S42-T8-R11) in Mandeville, Louisiana 70471.
11/15/2023 08:00 PM UTC
23-49-1
Cherry Laurel Drainage/Curb Repair----Contractor must provide all labor, materials, tools, supervision, and equipment to remove/replace concrete driveway, curb and gutter specified on Cherry Laurel (R04A032; S37-T7-R11) located in Covington, Louisiana. The time period of completion is thirty (30) days from the issuance of the Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
11/14/2023 08:00 PM UTC
23-21-2
Safe Haven Water Utility Improvements----The work of this contract comprises the rehabilitation and upgrade to two existing water well facilities (PWS ID 1103039), including, but not limited to, demolition and replacement of the existing chemical buildings, new chemical feed skids, new electrical service and components, new control panels, and a new well pump and piping improvements at Well #1.
11/08/2023 08:00 PM UTC
23-41-1
Installation of Fuel Tanks and Removal of the Existing Fuel Tanks at Department of Public Works Facilities--------To supply all equipment, materials, and labor to place two (2) five thousand (5,000) gallon above ground fuel tanks at each location with all required equipment to supply diesel fuel and unleaded gasoline for governmental equipment usage. Requirements: •Submit all fire marshal paperwork for the scope of work for the project. •Form up a properly sized concrete footing for tank saddlers with welded anchoring. •Install bollards for each tank that is properly sized and meets all regulations. •Pour tank pad and bollards with four thousand (4,000) PSI ready mix concrete. •Supply and install two (2) five thousand (5,000) gallon cylinder Fireguard UL2085, or equal, above ground fuel tank with all required fittings and piping from the fuel tank to the fuel delivery system or approved equal per location. If not biding as specified, specify Make/Model: __________________________________ •Properly ground the fuel tank •Supply and install split containment and overfill protection. •Supply and install a Green Leaf Gauge, or equal, level gauge. If not biding as specified, specify Make/Model: __________________________________ •Install a cap to manually test the fuel level. •Supply an atmospheric vent cap to meet regulations. •Connect and modify to existing fuel delivery system for complete/functional installation comparable with Petrovend software that communicates with Phoenix fuel system. •All waste/debris will be removed from the site and disposed of properly by the completion of the job. •All work should be Monday thru Friday between 7 am and 3 pm unless prior approval from DPW Director. •All equipment shall have a minimum one (1) year manufacturer’s warranty. Workmanship shall be covered by a one (1) year warranty for all installation work. This project time will be for ninety (90) calendar days.
11/02/2023 07:00 PM UTC
23-4-2
Cross Gates Water System Well Improvements------New water well, controls, control building, generator, fencing, electrical service, equipment, utility lines, and various related items at the Ozone Pines site. Well improvements, new controls, control building, generator, equipment, utility lines, and related items at the Willow Wood site.
11/01/2023 07:00 PM UTC
23-45-1
Foxbriar Street Drainage Repair------Contractor must provide all labor, materials, tools, supervision, and equipment to remove/replace existing concrete sidewalk, panels and wrap pipe joints due to base failures as specified on Foxbriar Street (R08V020; S13-T9-R14) located in Slidell, Louisiana. The time period to complete the work shall be forty-five (45) calendar days from issuance of the Notice to Proceed issued by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
11/01/2023 07:00 PM UTC
23-47-1
Leonelle Circle & Bard Circle Drainage Repair----Contractor must provide all labor, materials, tools, and equipment to remove/ replace and/ or repair concrete sidewalk, concrete curbing and CB-06 at Leonelle Circle (R08I065; S25-T8-R14) in Slidell, and reseal pipe joints, remove/ replace concrete road panels and sidewalks at Bard Circle (R08I050; S25- T8-R14) located in Slidell, Louisiana as specified. The time period of completion is forty-five (45) days from the issuance of the Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
11/01/2023 07:00 PM UTC
23-46-1
Place St. Charles & Place St. Germain Sinkhole Repairs----------------------------The Parish requires a Contractor to excavate around existing pipe and reseal the exterior of the pipe joint at Place St. Charles (R01E020; S47-T7-R11),and at Place St. Germain (R01E030; S47- T7-R10) in Covington, Louisiana.
11/01/2023 07:00 PM UTC
23-48-1
Kingspoint Blvd------------------------------------------------------------------------------------The Parish requires a Contractor to remove/replace concrete sidewalk panels on Kingspoint Blvd (R08V019; S13-T9-R14) in Slidell, Louisiana.
11/01/2023 07:00 PM UTC
23-39-2
Berry Todd Rd Bridge - The Contractor must provide all labor, equipment, materials, and tools necessary for the removal of concrete approach slabs and guard rail and installation of concrete approach slabs, and guard rail, as required per the construction drawings and specifications. The project location is Berry Todd Rd, Sections 43 and 39, Township 8, Range 13E in Lacombe, LA.
10/25/2023 07:00 PM UTC
181 - 190 of 863 Solicitations
1 2 15 16 17 19 21 22 23 86 87