General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
24-9-1
Amber St.------The Parish requests the Contractor to provide materials necessary to improve the road turnout conditions and subsurface drainage along Amber St (R08M023) Section 6, Township 9S, Range 15E, located in Slidell, Louisiana.
04/02/2024 07:00 PM UTC
24-7-1
Oak Cir Drainage------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage by remove/replace/repairing drainage catch basins as specified on Oak Circle (R08I036) Section 35, Township 8S, Range 14E, located in Slidell, Louisiana. The time period to complete the work shall be forty-five (45) calendar days from issuance of the Notice to Proceed by the Parish. Contractor shall provide all signage and barricades. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
03/28/2024 07:00 PM UTC
24-6-2
One-Time Purchase for Abita Lakes & Westwood Blowers--------St. Tammany Parish Government, Department of Utilities (DU) is seeking bids for a one-time purchase of Electrical Blowers for Abita Lakes and Westwood Wastewater Treatment Plants. The price quoted shall include package and delivery to the destination.
03/28/2024 07:00 PM UTC
23-47-2
Bedico Faubourg Water Main - Windermere----The contractor must provide all labor, equipment, tools, testing, and materials necessary to complete the work in accordance with the construction drawings and project specifications for the Bedico Faubourg Water Main Windermere project located in Madisonville, Louisiana (STP Project No. TU23000180).
03/27/2024 07:00 PM UTC
24-12-1
The Meadows Subdivision Panel Repairs------------------------------------------The Parish requests a contractor to remove and replace existing concrete road panels and cross pipe located in The Meadows Subdivision at Rose Meadow Loop (R09A031) Section 30 Township 8S Range 14E;and Rose Meadow Ct (R09A044) Section 30 Township 8S Range 14E in Slidell, Louisiana.
03/26/2024 07:00 PM UTC
24-13-1
Indian Point Dr Drainage---------------------------------------------------------------The Parish requests a contractor to improve drainage by removing and replacing cross culvert, road panels and headwalls around the existing drainage pipes, located at Indian Point Dr. (R0A046) Section 54 Township 7S Range 11E ; in Madisonville, Louisiana.
03/26/2024 07:00 PM UTC
23-46-2
Safe Haven Campus Improvements------The work of this contract comprises the removal and replacement of existing subsurface drainage infrastructure, construction of new detention pond, construction of new bioswale/rain garden area, removal and replacement of gravity sewer infrastructure, construction of new concrete walkways (Alternate No. 1) and wayfinding signage, and construction of new pavilions (Alternate No. 3) and nature trails (Alternate No. 2).
03/21/2024 07:00 PM UTC
24-6-1
Lake Sardis Dr. Drainage--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove/replace driveway, clean, and seal pipe joints, along Lake Sardis Dr (R08L049) Section 31 Township 8S Range 15E located in Slidell, Louisiana. The time period for completion of the project is thirty (30) calendar days. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
03/20/2024 07:00 PM UTC
23-40-2
Bedico Faubourg Water Main Fox Branch----The WORK comprises the construction of approximately 4,880 linear feet of water main interconnecting two existing water systems. The new water main will consist of open-cut 12” PVC pipe and directionally drilled 14” HDPE. No water service interruption will be allowed except for tie-ins, as directed by the Department of Utilities (DU). The new water main will be constructed using a combination of open cut and trench less construction.
03/20/2024 07:00 PM UTC
24-2-1
Utilities Grass Cutting Services--------------------------------------------------The purpose of this Quote Request is to obtain proposals from qualified Proposers who are interested in providing grass cutting services for the St. Tammany Parish, Department of Utilities(DU).
03/05/2024 08:00 PM UTC
201 - 210 of 914 Solicitations
1 2 17 18 19 21 23 24 25 91 92