St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
25-16-2
Camp Salmen Historic Lodge restoration----------------Historic restoration of the Camp Salmen Lodge building will include hazardous material abatement, masonry and plaster repair and restoration, door and window restoration and replacement, interior material restoration and replacement, wood roof framing code retrofit, and new roofing system.
| 07/08/2025 07:00 PM UTC |
25-22-2
Brewster Area Road Maintenance----The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to perform roadway improvements. Work shall include milling, overlaying, and patching of road surfaces as specified along:
− Bocage Ct (R01C039) Covington;
− Fayedaye St (R01I048) Madisonville;
− Melrose Ave (R01C042) Covington; and
− Spring Haven Ln (R01J098) Madisonville.
| 07/09/2025 07:00 PM UTC |
25-42-1
311 Somerset Dr Drainage Repairs-------------------The Parish requests a contractor to improve and restore drainage by resealing catch basins/pipe joints, removing and replacing concrete road panels located at 311 Somerset Dr., Slidell, Louisiana.
| 07/15/2025 07:00 PM UTC |
25-20-2
St Tammany Parish Fishing Pier---------------------------Removal of damaged timber fishing pier, and the construction of new “hardened”
fishing pier, including steel framing, steel decking, and steel piles. Work also includes lighting, a dry pipe sprinkler system, and other amenities.
| 07/23/2025 07:00 PM UTC |
Number | Deadline |
---|---|
23-47-1
Leonelle Circle & Bard Circle Drainage Repair----Contractor must provide all labor, materials, tools, and equipment to remove/ replace and/ or repair concrete sidewalk, concrete curbing and CB-06 at Leonelle Circle (R08I065; S25-T8-R14) in Slidell, and reseal pipe joints, remove/ replace concrete road panels and sidewalks at Bard Circle (R08I050; S25- T8-R14) located in Slidell, Louisiana as specified.
The time period of completion is forty-five (45) days from the issuance of the Notice to Proceed
by the Parish.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 11/01/2023 07:00 PM UTC |
23-46-1
Place St. Charles & Place St. Germain Sinkhole Repairs----------------------------The Parish requires a Contractor to excavate around existing pipe and reseal the exterior of the pipe joint at Place St. Charles (R01E020; S47-T7-R11),and at Place St. Germain (R01E030; S47- T7-R10) in Covington, Louisiana.
| 11/01/2023 07:00 PM UTC |
23-48-1
Kingspoint Blvd------------------------------------------------------------------------------------The Parish requires a Contractor to remove/replace concrete sidewalk panels on Kingspoint Blvd (R08V019; S13-T9-R14) in Slidell, Louisiana.
| 11/01/2023 07:00 PM UTC |
23-39-2
Berry Todd Rd Bridge - The Contractor must provide all labor, equipment, materials, and tools necessary for the removal of concrete approach slabs and guard rail and installation of concrete approach slabs, and guard rail, as required per the construction drawings and specifications. The project location is Berry Todd Rd, Sections 43 and 39, Township 8, Range 13E in Lacombe, LA.
| 10/25/2023 07:00 PM UTC |
23-42-1
Riverside Drive Drainage Repair ------ Contractor must provide all labor, materials, tools, supervision, and equipment to install sub-surface drainage with catch basins in order to prevent erosion in the roadside ditches at 71368 Riverside Drive (R03B002; S42-T7-R11) located in Covington, Louisiana as specified.
Contractor shall provide all signage and barricades.
The time period to complete the work shall be twenty (20) calendar days from Notice to Proceed issued by the Parish.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 10/25/2023 07:00 PM UTC |
23-37-2
2023 East District Panel Replacements--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as specified along the following roads:
-Ellwood Cir (R08I062) Section 25 Township 8S Range 14E Slidell;
-Dockside Dr (R08F031) Section 38 Township 8S Range 15E Slidell;
-Cedarwood Dr (R08M067) Section 38 Township 9S Range 15E Slidell;
-Clipper Dr (R09J018) Section 44 Township 9S Range 14E Slidell;
-Meadow Lake Dr East (R08M075) Section 12 Township 9S Range 14E Slidell; -Foxcroft St (R08V019) Section 13 Township 9S Range 14E Slidell.
| 10/24/2023 07:00 PM UTC |
23-41-1
Installation of Fuel Tanks and Removal of the Existing Fuel Tanks at Department of Public Works Facilities--------To supply all equipment, materials, and labor to place two (2) five thousand (5,000) gallon above ground fuel tanks at each location with all required equipment to supply diesel fuel and unleaded gasoline for governmental equipment usage and remove one 500-gallon above ground gasoline and one 1000-gallon diesel storage tanks from each location.
| 10/24/2023 07:00 PM UTC |
23-43-1
Lake Tahoe Panel and Catch Basin Repair--------------------------------------------------The Parish requires a Contractor to remove/replace road panels, clean and seal pipe joints, and catch basins, located at Lake Tahoe (R08L048; S31-T8-R15) in Slidell, Louisiana.
| 10/19/2023 07:00 PM UTC |
23-3-2
Cross Gates Water System - New Elevated Storage Tanks------New elevated steel water storage tanks, controls, piping, site grading and drainage, electrical service, equipment, utility lines and other related items at the Willow Wood and Ozone Pines sites.
| 10/18/2023 07:00 PM UTC |
23-38-2
2023 West District Panel Replacements-------------------------------------------------The Parish requires a Contractor to provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs along various Parish Roads.
| 10/17/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.