General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-41-1
Terra Bella Curb Repair----The Parish requests a Contractor to perform roadway improvements by removing and replacing sections of concrete barrier curbs as specified along Inglewood Terrace (R01C059), Covington, LA; Bocage Ct (R01C039), Covington, LA; Melrose Ave (R01C042), Covington, LA.
07/02/2025 07:00 PM UTC
25-40-1
Sludge Removal from Cross Gates #1----St. Tammany Parish, Department of Utilities (DU) requests a contractor for the removal of sludge, sand, and waste material from the Cross Gates #1 treatment plant, located at 350 N. Military Rd, Slidell, LA.
07/02/2025 07:00 PM UTC
25-16-2
Camp Salmen Historic Lodge restoration----------------Historic restoration of the Camp Salmen Lodge building will include hazardous material abatement, masonry and plaster repair and restoration, door and window restoration and replacement, interior material restoration and replacement, wood roof framing code retrofit, and new roofing system.
07/08/2025 07:00 PM UTC
25-22-2
Brewster Area Road Maintenance----The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to perform roadway improvements. Work shall include milling, overlaying, and patching of road surfaces as specified along: − Bocage Ct (R01C039) Covington; − Fayedaye St (R01I048) Madisonville; − Melrose Ave (R01C042) Covington; and − Spring Haven Ln (R01J098) Madisonville.
07/09/2025 07:00 PM UTC
25-42-1
311 Somerset Dr Drainage Repairs-------------------The Parish requests a contractor to improve and restore drainage by resealing catch basins/pipe joints, removing and replacing concrete road panels located at 311 Somerset Dr., Slidell, Louisiana.
07/15/2025 07:00 PM UTC
25-20-2
St Tammany Parish Fishing Pier---------------------------Removal of damaged timber fishing pier, and the construction of new “hardened” fishing pier, including steel framing, steel decking, and steel piles. Work also includes lighting, a dry pipe sprinkler system, and other amenities.
07/23/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
300-00-17-40-2
Tchefuncte Parc Bridge at Black River.....The Contractor must provide all labor, equipment, tools, and materials necessary for the removal of timber trestle bridge on timber piles, asphalt paving, installation of class II base course, prcb culvert, concrete headwalls, and incidental sanitary sewer relocation.
05/31/2017 07:00 PM UTC
622-10-17-34-2
Sewer and Appurtenances Annual
05/17/2017 07:00 PM UTC
302-00-17-32-2
Woodland Dr Road Improvements.......................................... The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing the road surface and applying an asphalt reinforcement grid, as specified.
05/16/2017 08:02 PM UTC
300-00-17-30-2
Clipper Drive Bridge..... The Contractor will provide all labor, equipment, tools, and materials necessary for the demolition of a single span slab span bridge and retaining walls and construction of a precast 3-span slab span bridge and sheet pile retaining walls, and all associated earthwork. The work includes riprap, concrete approach slabs, concrete approach pavement with class II base course and guardrails.
05/09/2017 07:00 PM UTC
310-00-17-33-2
2016 District 10 Road Improvements ---------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing road surfaces as specified. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time for completion is forty-five (45) days from the date specified in the Notice to Proceed + Calculated Rain Days per the attached specifications.
05/09/2017 07:00 PM UTC
622-10-17-15-2
Utility Construction and Maintenance Contract
05/04/2017 07:00 PM UTC
622-95-17-28-2
Castine EQ Recondition - Static Screen..............................................................The Parish requires a Contractor to provide two (2) static screens.
05/03/2017 07:00 PM UTC
416-10-17-18-2
Bayou Chinchuba Phase 2 ---------- Excavation of a 10-ft deep wet pond within an existing dry pond and installation of an aeration system, including electrical service from the main line along the St Tammany Trace to and for the wet pond aeration system. A temporary construction entrance is required through an established construction servitude from Hwy 59 westward to the site, along with other erosion control measured as necessary to prevent migration of sediment into waterways and onto roadways
05/02/2017 07:00 PM UTC
123
THIS IS A TEST PROJECT ONLY
04/27/2017 03:50 PM UTC
622-04-17-31-2
1.7 Meter Belt Filter Press
04/26/2017 07:00 PM UTC
611 - 620 of 885 Solicitations
1 2 58 59 60 62 64 65 66 88 89