General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
330-00-17-67-2
Tammany Trace Crack Repair..... This is a 2017 Capital Improvement Project. The work specified in this project will require the contractor to provide all labor, equipment, and materials necessary to improve the Tammany Trace multi-use path surfaces by milling and overlaying of asphaltic concrete and removing and replacing pavement including saturated soils, as specified along the Tammany Trace (R11A001) Section 42 Township 6S Range 11E, Section 36 Township 6S Range 11E, and Section 31 Township 6S Range 12E.
10/10/2017 07:00 PM UTC
339-00-17-63-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
10/04/2017 07:00 PM UTC
310-00-17-59-2
Forest Ln & Forest Ln Drainage................................. This is a District Capital Road Improvement Project for District 10. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road by reconstructing road surface. Work also included will be removing/ replacing storm drain pipes, catch basin, brisk walkway, clearing and grubbing, adjust man hole, and remove/relocate mailboxes as specified along Forest Ln (R04D091) Section 40 Township 7S Range 11E.
09/27/2017 07:00 PM UTC
440-14-17-62-2
Airfield Lighting and NAVAIDS ----- This project consists of the installation of airfield lighting and NAVAIDS for 18/36.
09/26/2017 07:00 PM UTC
522-00-17-60-2
HVAC Controllers Upgrade
09/26/2017 07:00 PM UTC
314-00-17-58-2
2017 District 14 Road Improvements........This is a District Capital Road Improvement Project for Districts 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Browns Village Rd (R09I001) Section 27 Township 8S Range 14E; Fifth St (R09I018) Section 27 Township 8S Range 14E; Fifteenth St (R09I056) Section 27 Township 8S Range 14E; First St (R09I010) Section 27 Township 8S Range 14E; and Javery St (R09D038) Section 34 Township 8S Range 14E.
09/21/2017 07:00 PM UTC
311-00-17-54-2
Ranch Rd & Ranch Rd Drainage ----- This is a District Capital Road Improvement Project for Districts 11. The Contractor must provide all labor, equipment, tools, testing, and materials necessary to improve the road by reconstructing the road surface. The work will also include the removal/replacement of drain pipes, cleaning/shaping/grading ditches, installing pipe headwalls, maintenance aggregate, topsoil, and hydro-seeding, as specified, along Ranch Rd (R09E050) Section 39 Township 9S Range 13E, Slidell, LA.
09/19/2017 07:00 PM UTC
321-00-17-55-2
Building B Buildout - Public Works...Portions of the third floor of Koop Drive, Building B shall have carpet tiles and linear base installed per the manufacturer’s specifications. All materials and demolition, surface preparation and installation work shall be included.
09/14/2017 07:00 PM UTC
015-05-17-65-2
Road Signs
09/14/2017 07:00 PM UTC
300-00-17-57-2
Dove Park Rd. Mill and Overlay -------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
09/12/2017 07:00 PM UTC
611 - 620 of 914 Solicitations
1 2 58 59 60 62 64 65 66 91 92