St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
| 01/16/2025 08:00 PM UTC |
Number | Deadline |
---|---|
303-00-17-10-2
2017 District 3 Road Improvements ------
This is a District Capital Road Improvement Project for District 3. The work
specified in this project will require the Contractor to provide all labor, equipment,
tools, and materials necessary to improve road surfaces by reconstructing them as
specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E;
Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Hay Hollow
(R02F027) Section 4 Township 5E Range 10E; Penn Mill Lakes Blvd (R03D031)
Section 13 Township 6S Range 10E; and Savannah Rd (R01G001) Section 4
Township 7S Range 10E.
| 04/04/2017 07:00 PM UTC |
307-00-17-22-2
2017 District 7 Road Improvements-----------This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Cedar Dr. (R04F038) Section 7 Township 7S Range 12E; Elm St (R04F039) Section 7 Township 7S Range 12E; Hemlock Dr. (R04F037) Section 7 Township 7S Range 12E; Joans St (R04E056) Section 1 Township 8S Range 11E; Labarre St (R04E026) Section 38 Township 8S Range 11E; and Redwood Dr. (R04F040) Section 7 Township 7S Range 12E .
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
The time period for completion of the project is sixty (60) calendar days + Calculated Rain Days per attached specifications.
| 04/04/2017 07:00 PM UTC |
015-05-17-17-2
Road Signs
| 03/23/2017 07:00 PM UTC |
015-60-17-16-2
Windshield Repair/ Replacement
| 03/23/2017 07:00 PM UTC |
316-00-17-11-2
Cross Gates Pond Improvements.................................
This is a 2017 Capital Drainage Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve drainage by installing a concrete wet well, a submersible pump, associated drainage equipment/features, related mechanical and electrical equipment, and embankment as specified at the Cross Gates Pond (P08LW01069) Section 38 Township 9S Range 15E.
| 03/21/2017 07:00 PM UTC |
306-00-17-09-2
2017 District 6 Road Improvements.....................................
This is a District Capital Road Improvement Project for District 6. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Becky Lake Dr (R06C010) Section 40 Township 6S Range 14E; Chat Ct (R05B044) Section 27 Township 5S Range 12E; Dolph Gaines (R06E009) Section 27 Township 7E Range 14E; Marcus Rd (R05G026) Section 33 Township 4S Range 13E; O Wager Rd (R10B017) Section 10 Township 6S Range 12E; S Davis Rd (R10B016) Section 10 Township 6S Range 12E; Tot Polk Rd (R06I013) Section 39 Township 6S Range 14E; Warrior Trace (R02U003) Section 11 Township 5S Range 11E; and Wilson Ln (R06I012) Section 38 Township 6S Range 14E.
| 03/15/2017 07:00 PM UTC |
309-00-17-08-2
2017 District 9 Road Improvements---------------This is a District Capital Road Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Audubon St (R08G009) Section 31 Township 8S Range 15E; Autumn Lakes Rd (R08N097) Section 38 Township 9S Range 15E; Blackbeard Dr (R08N043) Section 17 Township 9E Range 15E; Doubloon Dr (R08N042) Section 17 Township 9S Range 15E; Pearl River St (R08N014) Section 38 Township 9S Range 15E; Waverly Dr (R08L068) Section 38 Township 9S Range 15E; and Walnut St (R08G002) Section 31 Township 8S Range 15E.
| 03/14/2017 07:00 PM UTC |
310-00-17-07-2
2017 Districts 5 & 10 Road Improvements
This is a District Capital Road Improvement Project for Districts 5 & 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Strain Rd (R04F001) Section 19 Township 7S Range 12E ; America St (R04E331) Section 38 Township 8S Range 11E ; and Orleans St (R04E129) Section 38 Township 8E Range 11E.
| 03/13/2017 07:00 PM UTC |
300-00-16-70-2
Oak Harbor Road Elevation ................................................This project includes removing and replacing roadway pavement, raising the levee and roadway, hydro-seeding, installation of new drainage pipe and structures, incidental clearing, and other related work.
| 03/01/2017 08:00 PM UTC |
015-25-17-02-2
Road Materials
| 02/21/2017 08:00 PM UTC |