General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/15/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/21/2026 08:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
315-00-18-40-2
DPW West Side Concrete Panel Repair...... This is a Maintenance Project for West St Tammany Parish. The Contractor must provide all labor, equipment, tools and materials necessary to improve road surfaces by removing and replacing concrete panels as specified on: Autumn Wind Ln (R04F063) Section 7 Township 7 Range 12; Beau Abre Ct (R01E022) Section 2 Township 7 Range 10; Carmel Dr (R04E147) Section 38 Township 8 Range 11; Cours Carson Ln (R04E193) Section 44 Township 8 Range 12; Del Oaks (R04A047) Section 54 Township 7 Range 11; Elmwood Lp (R04A049) Section 54 Township 7 Range 11; Goldflower Ln (R04E146) Section 38 Township 8 Range 11; Greenbrier Blvd (R01E017) Section 45 Township 6 Range 11; Palm Blvd (R03I003) Section 23 Township 6 Range 11; Richland Dr East (R04D068) Section 40 Township 8 Range 11; West Ct (R04F068) Section 19 Township 7 Range 12.
08/21/2018 07:00 PM UTC
570-11-18-36-2
DPW Maintenance Overlays................................... This is a Parishwide Maintenance Project. The Contractor must provide all labor, equipment, tools and materials necessary to improve road surfaces by milling and overlaying road surfaces as specified along Hoover Rd (R01A007) Section 18 Township 6 Range 10; J & B Rd. (R02J010) Section 34 Township 5 Range 10; Morgan Rd. (R02Q018) Section 13 Township 5 Range 11; White Oak Ln. (R01J094) Section 44 Township 7 Range 10.
08/21/2018 07:00 PM UTC
314-00-18-38-2
Johnny F. Smith Blvd......... The Contractor must provide all labor, equipment, tools, testing, and materials necessary to improve road conditions by removing and/or replacing concrete panels and curbs as specified along Johnny F. Smith Blvd. (R09I064) in Slidell, Louisiana (Section 26 Township 8 Range 14E).
08/17/2018 07:00 PM UTC
300-00-18-37-2
Airport Rd Mill and Overlay ----- This is a 2018 Capital Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, tools and materials necessary to improve roadway surfaces by milling and overlaying of asphaltic concrete, installing roadway striping, and improving sidewalks, as specified along Airport Rd. (R09C037) Section 33 Township 8S Range 14E in Slidell, Louisiana, and Northshore Blvd. Section 37 Township 8S Range 14E, City of Slidell.
08/15/2018 07:00 PM UTC
314-00-18-34-2
Carroll Rd. ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadway with a 2” mill and overlay as specified along Carroll Rd. (R09G062) Section 9 Township 9S Range 14E.
08/08/2018 07:00 PM UTC
301-00-18-08-2
2018 District 1 Road Improvements ----- This is a District Capital Road Improvement Project for District 1. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Camellia Dr (R01D004) Section 47 Township 7S Range 10E; Helen St (R01I007) Section 16 Township 8S Range 10E; Three Rivers Rd (R03A001) Section 48 Township 7S Range 11E; Zinnia Dr (R01D006) Section 47 Township 7S Range 10E; Adrienne St (R01H005) Section 18 Township 7S Range 10E; River Bend Dr (R03A011) Section 17 Township 7S Range 11E.
08/08/2018 07:00 PM UTC
305-00-18-11-2
2018 District 5 Road Improvements ----- This is a District Capital Road Improvement Project for District 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces, and installation of a guard rail as specified along Armel Rd (R04F009) Section 30 Township 7S Range 12E; Bayou Ct (R03L068) Section 11 Township 7S Range 11E; Marion St (R04F011) Section 20 Township 7S Range 12E; Marquette St (R04D026) Section 34 Township 7S Range 11E; Nick’s Rd (R04F055) Section 19 Township 7S Range 12E; North Ln (R04F062) Section 19 Township 7S Range 12E; Palmetto Ave (R04D007) Section 22 Township 7S Range 11E.
08/08/2018 07:00 PM UTC
310-00-18-25-2
2018 District 10 Road Improvements.......................... The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Albert St (R04E027) Section 46 Township 8S Range 11E; Caroline St (R04D170) Section 39 Township 8S Range 11E; McNamara St (R04D169) Section 39 Township 8S Range 11E; Oak St (R04D111) Section 39 Township 8S Range 11E; Orleans St (R04D172) Section 39 Township 8S Range 11E; Webster St (R04D051) Section 39 Township 8S Range 11E.
08/07/2018 07:00 PM UTC
314-00-18-33-2
2018 District 14 Road Improvements.....The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Barbara Dr (RO8U003) Section 11 Township 9S Range 14E; Beech Ave (RO8V003) Section 13 Township 9S Range 14E; Bernard Rd (R09G072) Section 9 Township 9S Range 14E; Brookter Rd (R08V008) Section 13 Township 9S Range 14E; Browns Village Rd (RO9I001) Section 27 Township 8S Range 14E; Grace Dr (RO8U007) Section 11 Township 9S Range 14E; Homer Ave (RO8U008) Section 11 Township 9S Range 14E.
08/07/2018 07:00 PM UTC
622-10-18-31-2
Colonial Court Lift Station Upgrade - Partial demolition of the existing lift station (436 Colonial Ct., Mandeville, LA 70471), installation of a new wet well and submersible duplex lift station and the conversion of the existing wet well to act as a trash and grease trap.
07/24/2018 07:00 PM UTC
581 - 590 of 933 Solicitations
1 2 55 56 57 59 61 62 63 93 94