General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
010-95-18-22-2
Aviation Fuel
04/25/2018 07:00 PM UTC
300-00-18-06-2
Allen Rd Mill and Overlay............................... This is a 2018 Capital Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve roadway surfaces by milling and overlaying of asphaltic concrete and installing asphalt reinforcement geogrid, as specified along Allen Rd (R10D004) in Abita Springs, Louisiana (Section 20 Township 6S Range 12E and Section 29 Township 6S Range 12E).
04/18/2018 07:00 PM UTC
307-00-17-82-2
N Pontchartrain Dr Drainage ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by removing subsurface drainage and replacing drainage pipes along the roadside ditches as specified along N Pontchartrain Dr (R04E121) Section 38 Township 8S Range 11E located in Lacombe, LA.
04/11/2018 07:00 PM UTC
010-07-18-16-2
2018 Official Journal
04/05/2018 07:00 PM UTC
622-10-18-07-2
Submersible Pump Annual ----- Prices remain in effect through December 31, 2018, with option to extend for (1) one additional year, by written agreement of both parties. Any delivery or service charge must be included in the bid price. Quantities may vary; minimum orders shall not be required. St. Tammany Parish Government (Parish) reserves the right to award materials in whole, in part and/or to multiple vendors. Bids must be submitted on the Pricing Sheet provided. All fields must be filled in, NO blanks will be permitted. If the item is unavailable please enter N/A. The Parish, as a function of Tammany Utilities, owns and operates approximately fifty (50) wastewater treatment plants, forty (40) water wells, and over two-hundred (200) sewage lift stations, water distribution lines and sewage collection lines. Tammany Utilities, therefore, routinely requires submersible pumps primarily for sewage lift stations.
03/27/2018 07:00 PM UTC
416-21-17-70-2
Riverwood Subdivision and Covington Country Club Estates Drainage Improvements - Phase 1 ----- Installation of storm drain pipe and drainage structures. Incidental removal and replacement of concrete drives, pavement, curbs and asphalt pavement.
03/20/2018 07:00 PM UTC
010-35-17-74-2
Fuel & Oil
01/11/2018 08:00 PM UTC
015-15-17-71-2
Cold Mix
01/11/2018 08:00 PM UTC
015-45-17-72-2
Concrete Culverts
01/11/2018 08:00 PM UTC
015-25-17-73-2
Corrugated Steel Culverts
01/11/2018 08:00 PM UTC
591 - 600 of 914 Solicitations
1 2 56 57 58 60 62 63 64 91 92