General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
01/16/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
015-45-16-64-2
Plastic Culvert Pipe
12/29/2016 08:00 PM UTC
015-25-16-61-2
Corrugated Steel Culverts
12/29/2016 08:00 PM UTC
010-35-16-62-2
Fuel & Oil
12/29/2016 08:00 PM UTC
015-60-16-66-2
Windshield Repair/ Replacement
12/29/2016 08:00 PM UTC
015-80-16-60-2
Trace Bridge Repairs - The Contractor must provide all labor, materials, equipment and supervision necessary to remove and replace decayed timber piles, stringers, and bent caps. The work is to include all necessary cribbing, jacking and supports required to hold up deck and all galvanized connectors, as well as all hardware required to install materials. Timber is to be replaced.
12/09/2016 08:00 PM UTC
314-00-16-55-2
Voters Rd. - Curve to Allen Rd. Mill and Overlay ----- This is a 2016 Capital Road Improvement Project for District 13 and District 14. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by milling and overlaying and improve drainage by installing subsurface drainage as specified along Voters Rd (R08V002) Section 24 Township 9S Range 14E.
10/18/2016 07:00 PM UTC
015-45-16-58-2
2016 DPW Maintenance Overlays Phase 2 The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2 inch asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12 inch patching and 1.5 inches cold planing as specified. See specifications attached for: 9th Street (R04A038); 11th Street (R04A003); Brookside (R04D035); Cody Lane (R02O028); Fincher Road (R05E016); Green Court (R04E162); La Salle Street (R04D059); Le Cirque (R01J073); Meadow Court (R04E160); Nelson Road (R05F018); Passman Road (R03F031); Prairie Court (R04E164); Raehyo Lane (R03E013); Ridge Court (R04E163); Rue Mon Jardin (R01J070); St. Ann Street (R03J035); Trail Court (R04E159); Walker Street (R03J034); and Ward Road (R05E015).
10/18/2016 07:00 PM UTC
312-00-16-56-2
2016 District 12 Road Improvements ----- This is a 2016 Capital Road Improvement Project for District 12. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with a 2” mill and overlaying, and removing and replacing concrete panels as specified along Behrman Street (R08U015) Section 23 Township 9S Range 14E ; and Bosworth Street (R08U020) Section 23 Township 9S Range 14E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
09/28/2016 07:00 PM UTC
015-35-16-54-2
2016 DPW Maintenance Overlays Phase 1 ------ The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2” Asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12” patching and manhole adjustment, as specified. See specifications attached for Coci Road (R06E015); Dixie Road (R09I002); Donnis Drive (R09B007); Golden Lane (R08A006); Jefferson Street (R09D035); John Anthon Road (R06G022); Lynn Road (R09F007); Marina Lane (R09H042); Miller Creek Lane (R08I004); Neal Lane (R08K010); Pebblebrook Lane (R08I003); Shirmac Drive (R08N069); Sleepy Hollow Lane (R08I011); Sue Street (R09F006); Susan Lane (R08K009); and Third Street (R09I016). The time period for completion of the project is 90 calendar days + calculated rain days. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
09/27/2016 07:00 PM UTC
301-00-16-51-2
2016 District 10 Road Improvements.......This is a 2016 Capital Road Improvement Project for District 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with milling and overlaying, overlaying, and adding pavement striping along Coffee Street (R04D047) Section 39 Township 8 South Range 11 East; Dupard Street (R04D168) Section 39 Township 8 South Range 11 East; and Lafitte Street (R04D050) Section 39 Township 8 South Range 11 East.
09/23/2016 07:00 PM UTC
601 - 610 of 833 Solicitations
1 2 57 58 59 61 63 64 65 83 84