General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
015-15-17-75-2
Hot Mix Asphalt
01/11/2018 08:00 PM UTC
525-00-17-76-2
Janitorial Supplies
01/11/2018 08:00 PM UTC
015-05-17-79-2
Road Signs
01/11/2018 08:00 PM UTC
015-60-17-81-2
Windshield Repair and Replacement
01/11/2018 08:00 PM UTC
015-10-17-80-2
Striping
01/11/2018 08:00 PM UTC
015-25-17-78-2
Road Materials
01/11/2018 05:00 PM UTC
015-45-17-77-2
Plastic Culvert Pipe
01/11/2018 08:00 AM UTC
622-95-17-61-2
Bedico - Timberlane Interconnection....Installation of approximately 9,500 linear feet of 12-inch PVC and HDPE water main via open cut, directional drilling and jack and bore including tie ins, valves, fire hydrants, sampling stations and other ancilliary work in accordance with the drawings and specifications prepared by Professional Engineering Consultants Corporation dated June 6, 2017 and June 2017, respectively.
12/19/2017 08:00 PM UTC
419 -02-17-66-2
FEMA Disaster 4263 - Floor Repair.......................The Contractor must provide all labor, equipment, tools, and materials necessary for embankment repair, riprap installation, cross drain replacement, and pavement patching, in accordance with the specifications.
11/07/2017 08:00 PM UTC
321-00-17-68-2
Building B Buildout - Public Works Office Partition Panels......Permanent, hard-surface, non-powered office partition panels shall be furnished and installed, per the manufacturer’s specifications, to sub-divide large rooms into work stations on the 3rd floor of Building B at the St. Tammany Parish Government Administrative Complex (Koop Campus). All partition panels, materials, equipment, labor, and supervision required to complete the work, per the specifications (Section 09), shall be included.
10/19/2017 07:00 PM UTC
601 - 610 of 914 Solicitations
1 2 57 58 59 61 63 64 65 91 92