26-30-2
2026 Parishwide Striping--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and
materials necessary to provide and install thermoplastic striping as specified along the following Parish roads:
• Palm Blvd (R03I003) in Covington ;
• Branch Crossing Dr (R03H018) in Covington ;
• Dogwood Ln (R03I012) in Covington ;
• Lake Ramsey Rd (R03D012) in Covington ;
• Viola St (R04E070) in Mandeville ;
• Lacombe Harbor Rd (R07H028) in Lacombe ;
• E. Violet St (R07C112) in Lacombe ;
• Rapatel St (R04E025) in Mandeville ;
• Lonesome Rd (R04D032) in Mandeville ;
• Pleasant Dr (R09C019) in Slidell ;
• Camp Villere Rd (R09D012) in Slidell ;
• Dixie Ranch Rd (R09C033) in Slidell ;
• Garden Dr (R09G051) in Slidell ;
• Liberty Dr (R09G047) in Slidell ;
• Brookter St (R08V008) in Slidell ;
• N. 3rd Ave (R08J006) in Slidell ;
• Lake Village Blvd (R08L026) in Slidell ; and
• Tammany Trace (R11A001) various locations.
| 06/17/2026 07:00 PM UTC |
|
26-17-1
Tammany Trace Solar Pedestrian Activation System Replacement----------St. Tammany Parish Government is requesting a Contractor to provide and install the LightGuard Solar System or an approved equal. The Contractor shall provide all labor, materials, and
equipment necessary to remove existing solar pedestrian crossing systems and install new solar-powered pedestrian activation systems at designated locations along the Tammany Trace.
| 06/17/2026 07:00 PM UTC |
|
26-32-2
Utility Point Of Repair-------------------------------
The WORK shall consist of point repairs, rehabilitation, and replacement of water and sewer infrastructure. This WORK shall include scheduled and emergency repairs of water and sewer infrastructure. The WORK may also include limited extensions of new water and/or sewer infrastructure to provide service.
| 06/23/2026 07:00 PM UTC |
|
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
| 06/24/2026 07:00 PM UTC |
|
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
| 06/24/2026 07:00 PM UTC |
|
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
| 07/15/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
25-5-2
Pinnacle Parkway------------------------------------------------The work specified in this project will require the contractor to provide the labor, equipment, and materials necessary to improve the roadway surface along Pinnacle Parkway (R01D020) Section 47, Township 7S Range 11E, Mandeville, LA.
| 04/30/2025 07:00 PM UTC |
|
25-23-1
Solomon Dr. Sinkhole Repair----------------------------------The Parish requests a contractor to repair the sinkhole by cleaning/repairing/resealing the catch basin and interior pipe joints on Solomon Dr., Covington, LA 70433
| 04/30/2025 07:00 PM UTC |
|
25-22-1
Lenwood Dr Pond & Lowe Pond Fence Repairs----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to repair existing fence and install new fence and gates, as specified along Lenwood Dr (P08IW01132); and Lowe Pond (P08AW02007) located in Slidell, Louisiana.
| 04/30/2025 07:00 PM UTC |
|
25-24-1
Chamale Dr. & Weil Wood Dr.------ The parish requests a contractor to improve roadways by patching, installing asphalt speed
tables, improving turn radius, and removing/replacing sidewalk as specified.
| 04/22/2025 07:00 PM UTC |
|
25-21-1
Woodridge Blvd Drainage ------------The Parish requests a contractor to improve drainage by installing catch basins into sub-surface located on Woodridge Blvd (R04C004); in Mandeville, Louisiana.
| 04/02/2025 07:00 PM UTC |
|
25-8-2
Berry Todd Rd & N Dixie Ranch Rd----The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surfaces by milling and overlaying approximately 21,500 total feet of asphaltic concrete and installing roadway striping, as specified along Berry Todd Rd (R07C002) Section 19/43/39/29/28, Township 8S, Range 13E, and N Dixie Ranch Rd (R07B004) Section 16-17, Township 8S, Range 13E.
The Parish reserves the right to add, remove or otherwise modify the above, as
determined necessary by the Parish and as allowed by law.
The time period for completion of work is forty-five (45) days from issuance of
Notice to Proceed by the Parish.
| 04/01/2025 07:00 PM UTC |
|
25-9-2
2025 District Panel Replacements---------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as specified along Maison Dr (R01K015) Covington ; Bluefield Dr (R08I061)Slidell ; Kelly Dr (R08I005) Slidell ; Kris Dr (R08I006) Slidell ; Northwood Dr (R08I030) Slidell ; Timbers Dr (R08I043) Slidell ; Autumn Wind Ln (R04F063) Mandeville ; Brandon Dr (R08P030) Slidell ; West End Blvd (R09J110) Slidell.
| 04/01/2025 07:00 PM UTC |
|
25-18-1
Sycamore Dr Turn Radius----The parish requests a contractor to improve the turning radius at the first part of the s-curve by installing subsurface drainage, catch basins, patching and shoulder material as specified
| 03/13/2025 07:00 PM UTC |
|
25-19-1
Huntwyck Village Sidewalks------The Parish requests a contractor to improve sidewalks at various locations as specified along Drury Ln (R09G037) Slidell; Holmes Dr (R09G040) Slidell; Portsmouth Dr (R09G039) Slidell; Queen Anne Dr (R09G038) Slidell; Raleigh Dr (R09G036) Slidell; Westminster Dr (R09G033) Slidell ; Louisiana.
| 03/13/2025 07:00 PM UTC |
|
25-20-1
7th St. Road Improvement-------------------------------The Parish requests a contractor to improve road surfaces by patching and overlay on 7th St., Mandeville, LA.,
| 03/13/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.