St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
24-63-2
Lacombe Trace Trails & Nature Park--------------------------------------------The project is for the construction of a public outdoor recreation nature park as part of the existing Tammany Trace bike path.
| 01/07/2025 08:00 PM UTC |
24-71-2
Soell Dr, Soell Dr Drainage, Helenbirg Dr, Mire Dr------Work to include asphalt mill and overlay, rebuilding sections of roadway, pavement patching, replacement of culverts, installation of subsurface drainage, box culvert installation, excavation and embankment work, regrading of ditches, signage, striping and the installation of speed tables.
The Parish reserves the right to add, remove or otherwise modify the above, as
determined necessary by the Parish and as allowed by the law.
| 01/07/2025 08:00 PM UTC |
24-69-1
2024 Parishwide Striping------ The Parish requests a contractor to provide and install thermoplastic striping as specified along
the following Parish roads:
• Caroline St (R04E234) Section 38 Township 8S Range 11E, Mandeville;
• Destin St (R04E242) Section 38 Township 8S Range11E, Mandeville;
• Dupard St (R04E143) Section 38 Township 8S Range 11E, Mandeville;
• Evangeline Dr (R09E049) Section 11 Township 9S Range 13E; Slidell;
• Fish Hatchery Rd (R07A001) Section 6 Township 8S Range 13E; Lacombe;
• Labarre St (R04E126) Section 38 Township 8S Range11E, Mandeville;
• McNamara St (R04E344) Section 38 Township 8S Range 11E;
• Meadow Lake Subdivision Section 12 Township 9S Range 14E; Slidell;
• Ninth Ave (R03L047) Section 11 Township 7S Range 11E; Covington;
• Pruden Rd (R03D005) Section 25 Township 6S Range 11E; Covington; and
• Tammany Trace Crosswalks (R11A001) various locations.
| 01/07/2025 08:00 PM UTC |
24-77-2
Chlorinated Tablets 3”------St. Tammany Parish Government (STPG) Department of Utilities (DU) is seeking bids to supply Chlorinated Solid 3” (three-inch) Tablets for our Wastewater Treatment Facilities. DU owns and operates over fifty treatment facilities throughout St. Tammany Parish.
| 01/07/2025 08:00 PM UTC |
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
| 01/16/2025 08:00 PM UTC |
Number | Deadline |
---|---|
24-13-1
Indian Point Dr Drainage---------------------------------------------------------------The Parish requests a contractor to improve drainage by removing and replacing cross culvert, road panels and headwalls around the existing drainage pipes, located at Indian Point Dr. (R0A046) Section 54 Township 7S Range 11E ; in Madisonville, Louisiana.
| 03/26/2024 07:00 PM UTC |
23-46-2
Safe Haven Campus Improvements------The work of this contract comprises the removal and replacement of existing subsurface drainage infrastructure, construction of new detention pond, construction of new bioswale/rain garden area, removal and replacement of gravity sewer infrastructure, construction of new concrete walkways (Alternate No. 1) and wayfinding signage, and construction of new pavilions (Alternate No. 3) and nature trails (Alternate No. 2).
| 03/21/2024 07:00 PM UTC |
24-6-1
Lake Sardis Dr. Drainage--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove/replace driveway, clean, and seal pipe joints, along Lake Sardis Dr (R08L049) Section 31 Township 8S Range 15E located in Slidell, Louisiana.
The time period for completion of the project is thirty (30) calendar days.
Any work that may be reasonably inferred from the specifications or drawings as being required
to produce the intended result shall be supplied whether or not it is specifically called for. Work,
materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized
standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with
their response.
| 03/20/2024 07:00 PM UTC |
23-40-2
Bedico Faubourg Water Main Fox Branch----The WORK comprises the construction of approximately 4,880 linear feet of water main interconnecting two existing water systems. The new water main will consist of open-cut 12” PVC pipe and directionally drilled 14” HDPE. No water service interruption will be allowed except for tie-ins, as directed by the Department of Utilities (DU). The new water main will be constructed using a combination of open cut and trench less construction.
| 03/20/2024 07:00 PM UTC |
24-2-1
Utilities Grass Cutting Services--------------------------------------------------The purpose of this Quote Request is to obtain proposals from qualified Proposers who are interested in providing grass cutting services for the St. Tammany Parish, Department of Utilities(DU).
| 03/05/2024 08:00 PM UTC |
24-2-2
Rousseau Rd Bridge Rehabilitation-------------------------------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the installation of a manufactured steel beam/frame.
| 02/29/2024 08:00 PM UTC |
24-4-1
Covington Library Exterior Renovations - Contractor must provide all labor, materials, tools, equipment, and permits for the exterior renovations for the St. Tammany Parish Library, Covington Branch located at 312 West 21st Avenue, Covington, Louisiana 70433 in accordance with plans and specifications. The scope includes new landscaping around the building, demolition and addition of sidewalks, subsurface drainage, removing old fence posts, and repairs to the concrete parking lot.
| 02/22/2024 08:00 PM UTC |
24-5-1
Trace Maintenance Barn - Contractor will remove old ceiling tile, grid, electrical lighting, ceiling and wooden mezzanine flooring.
Contractor will replace with new structurally sound lumber to correct sagging ceiling and reinstall lighting fixtures, ceiling grid and ceiling tile.
Contractor will remove and dispose of all construction/demo debris.
| 02/22/2024 08:00 PM UTC |
24-1-2
Safe Haven Water Utility Improvements------The work to be performed under this contract consists of furnishing and delivering all labor, materials, supervision, construction equipment, mechanical and electrical equipment not furnished by the St. Tammany Parish Department of Utilities, travel utilities, transportation, supplies, tools and services necessary for performing all work as specified in the Contract Documents, plus whatever work may be added as extra work under the provisions stated elsewhere in these documents.
| 02/15/2024 08:00 PM UTC |
23-56-2
Bigner Rd Turn Lane------The work specified in this project will require the contractor to provide labor, equipment, and material necessary to improve the roadway surface by milling and overlaying approximately 300 feet of asphaltic concrete and installing roadway striping. The intersection of Bigner Rd and State Highway 22 will undergo widening for the addition of a right-hand turn lane, as well as the movement of drainage on the east side of the widened road, as specified along Bigner Rd (R04C017) Section 54 Township 7 Range 11E.
| 02/08/2024 08:00 PM UTC |