Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-010-103277.1
Structure Replacement Bridge A - No. 10-0001, Graham Road Over Graham Run Bridge B - No. 10-0002, Graham Road Over East Ferney Run Roadway Rehabilitation Graham Road Forest District 10, Sproul State Forest Colebrook Township Clinton County, Pennsylvania Replace 2 structures with P/S Concrete Plank Beam bridge, and Precast Concrete Box Culvert. In addition, construction of a slide repair and placement of driving surface material on Graham Road. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: Over $1M
09/19/2024 06:00 PM UTC
FDC-011-10059.1
Structure Replacement Bridge No. 5111-0014 Bear Creek Blvd over Laurel Run Forest District 11, Pinchot State Forest Plains Township, Luzerne County, Pennsylvania Project Description: a. All site work to suit project preparation, execution, and completion. b. Partial demolition of the existing structure carrying Bear Creek Blvd over Laurel Run consisting of a 45’-0” long x 35’-0” wide Reinforced Concrete T Beam bridge. This structure will be replaced with a Single Span Composite Prestressed Concrete Spread Box Beam Superstructure atop Cast-in-Place Reinforced Concrete Cantilever Abutments that will provide a 18’ clear roadway width between the Structure Mounted Guide Rail barriers. The existing bridge substructure will be demolished to Elevation 1022.00 and the new bridge will span past the existing abutments and wingwalls. Replacement includes driving surface aggregate, rock lining, and architectural surface treatment. c. Construction of structure mounted guide rail barrier, measured from end of structure to end of structure. d. Construction of approach guide rail including: 12’-6” Type 31-S Guide Rail with 37’-6” Turned Down End Treatments at all four (4) corners. SDB Participation Goal: 6 % VBE Participation Goal: 3 % Engineer's Estimate: $ 800,000 - $ 1 Million
09/19/2024 06:00 PM UTC
FDC-007-10056.1
Structure Replacement, Bridge No. 5107-0056 Poe Paddy Drive Over Swamp Run Forest District 7, Bald Eagle State Forest Penn Township, Centre County, Pennsylvania The proposed project includes a structure replacement of Poe Paddy Drive over Pine Swamp Run. It will be replacing the existing reinforced concrete slab structure with a precast reinforced concrete arch culvert at the same location as the existing structure. The proposed structure will provide two lanes of unopposed traffic as well as adequate barrier and approach guide rail updates where necessary. DGS Small Business Certification Required Engineer's Estimate: $500,0000 - $1M
09/19/2024 06:00 PM UTC
FDC-009-103274.1
Structure Replacement, Bridge No. 09-0053 Claymine Road Over Corbin Run Forest District 9, Moshannon State Forest Rush Township, Centre County, Pennsylvania This project will replace a partially collapsed 36” diameter corrugated metal pipe culvert on Claymine Road. The existing culvert is significantly undersized to provide the flow capacity necessary for the large upstream drainage area, which includes a significant amount of surface water runoff from the Mid-State Regional Airport runways. The proposed replacement structure is a precast concrete spread box beam superstructure supported by an integral abutment substructure. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
09/19/2024 06:00 PM UTC
FDC-418-103139.1
Pavement Rehabilitation of Multiple Roadworks and Trail Marsh Creek State Park Wallace & Upper Uwchlan Townships, Chester County, Pennsylvania The work for this project will consist of repair, reclamation and repaving of the sections of the existing paved roadway and other incidental construction of Marsh Creek West Park Road, Milford Road, Chalfont Road Boat Launch, and Park Trail Road as specified in the plan located within Marsh Creek State Park, Wallace & Upper Uwchlan Townships in Chester County. SDB Participation Goal: 8% VBE Participation Goal: 3% Engineer's Estimate: $400,000-$800,000
10/03/2024 06:00 PM UTC
FDC-007-103149.1
Deck Replacement, Bridge No. 07-0066 Penns Creek Trail Over Penns Creek Forest District 7, Bald Eagle State Forest Penn Township, Centre County, Pennsylvania Project Description: This project consists of construction of a new deck, railings and bollards for bridge no. 07-0066, Penns Creek Trail Bridge over Penns Creek. The bridge approaches will also be modified as necessary to tie into the new deck elevation. Other work includes in stream timber debris removal. DGS Small Business Certification Required Engineer's Estimate: $100,000 -$500,000
10/03/2024 06:00 PM UTC
FDC-005-103280.1
Bridge Maintenance (6 Bridges) Forest District 5, Rothrock State Forest West, Jackson, & Todd Townships Huntingdon County, Pennsylvania This project is for the maintenance repair or rehabilitation of six existing structures throughout the Rothrock State Forest. The proposed work includes: • The maintenance repair for Bridge A on PA Furnace Road includes repairing underpinning along the near abutment using a concrete collar and rock scour protection; cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; rebuilding a stone masonry wingwall; and replacing portions of the guiderail along the approach. • The rehabilitation for Bridge B on Pine Swamp Road will replace the existing superstructure with a steel I-beam bridge superstructure, including a nail laminated timber deck, timber curbs and structure mounted guiderail. The maintenance repairs for Bridge B also includes new concrete for beam seats, backwalls, cheekwalls, wingwall caps and concrete collars along the abutments; repointing existing stone masonry joints; and installing a new structure waterproofing and foundation drainage system. • The maintenance repair for Bridge C on Stone Creek Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; recaulking joints; and replacing portions of the guiderail along the approach. • The maintenance repair for Bridge D on Seeger Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; and recaulking joints. • The maintenance repair for Bridge E on Diamond Valley Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; repointing existing stone masonry joints; and crack sealing on the asphalt roadway. • The maintenance repair for Bridge F on Trough Creek Drive includes cleaning, blasting, and repainting the steel floorbeam system; replacing existing deck connection hardware and retorquing hanger connections; retreating the existing glu-laminated timber arches and sidewalks; removing/reinstalling the membrane waterproofing and asphalt over the deck including repaving the approach roadway; and replacement of the approach guiderail. SDB Participation Goal 0% VBE Participation Goal 0% Engineer's Estimate: Over $1M
10/03/2024 06:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
FDC-117-103234.1
Dam Repairs Parker Dam State Park Huston Township, Clearfield County, Pennsylvania Work included under this contract consists of the complete construction and installation work for the following: a. Dewatering: 1. All dewatering activities required, partial drawdown of fivefoot (5’) of the normal pool elevation of the reservoir. b. E&S: 1. Implementation, maintenance, and removal of erosion and sedimentation control measures. c. Pressure pointing (7360 square feet): 1. Pressure Pointing of surfaces of the existing masonry structures listed below. a. Primary spillway east wall, floor, and west abutment wall b. Primary spillway vertical wall into stilling basin c. Upstream end of the west wing wall of the auxiliary spillway. d. Upstream east wing wall of the primary spillway. e. Control tower from normal pool elevation down 2 ft in elevation d. Fiberglass Staff Gauge: 1. Remove existing staff gauge and install a fiberglass staff Contract No. FDC-117-103234.1 SUMMARY OF WORK 01010-2 gauge to the main spillway wall upstream of the spillway. e. Stone Masonry Work (125 Square Feet): 1. Displaced hand laid stone on the upstream side of the dam must be reset to original location. a. Located on auxiliary spillway wing wall on the upstream side of the dam. b. Located between the control tower and bridge abutment. f. Concrete Spall Repair (770 cubic inches): 1. Repair cracked and spalled concrete along the walls located inside the control tower. The work will consist of the following listed below. a. Spall repairs located above the 5 ft drawdown mark. b. Spall repairs are located underwater that will need to be completed by divers. g. Excavating, Backfill, and Compacting (109 Cubic Feet): 1. Repair the ground under the stone masonry work located between the control tower and bridge SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-428-6503.1
General Construction, Shower House Replacement, Phase 1 and Full Service Campsites Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Clearing and grubbing of trees, shrubs, and other vegetation. b. Excavation, trenching, backfill, and compaction work required for new general, plumbing, and electrical construction work. c. Rough and finish grading. d. Construction of roadway and parking areas. e. Construction of stone and asphalt spurs, aggregate campsite living areas and tent pads. f. Signage, striping and relocation of wheel stops. g. Subsurface stone basins and rain gardens. h. Storm Sewer piping, domed risers, inlets and outlet structures. i. Domestic Water and Sanitary sewer piping related to exterior improvements. j. Wood fence k. Rock construction fencing, silt socks, and inlet protection. l. Construction of concrete and asphalt sidewalks. m. Seeding, mulching, and landscaping. n. Structure Demolition of Existing Showerhouses 1 and 3. o. Construction of new Showerhouses 1 and 3 including concrete footings and piers; concrete masonry unit (cmu) foundations; ground face cmu walls with insulation fill; reinforced cmu shear walls grouted solid; interior sloping reinforced concrete slab on grade floors; exterior reinforced concrete slab on grade with perimeter turndowns; wood shear wall extension panels; structural steel columns; common wood trusses; and miscellaneous rough carpentry and sheathing. p. Showerhouses 1 and 3 Building Envelope: Fiber cement siding and trim; building insulation and vapor barrier; thin stone veneer with cut stone base and water table; asphalt shingle roof; steel doors and frames; and aluminum windows. q. Showerhouses 1 and 3 Building Finishes, Specialties and Furnishings: Gypsum wall board; PVC panel ceilings, resinous floors; ceramic tile shower walls and floors; interior and exterior painting; solid surface countertops and integral sinks; exterior stainless-steel counters with integrated sinks; toilet and shower partitions; and toilet accessories. r. Department instruction and training. SDB Participation Goal 9% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
05/25/2023 06:00 PM UTC
FDC-428-6503.2
Mechanical Construction, Showerhouse Replacement Phase 1 & Full Service Campsites Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Space heaters h. Exhaust grilles. i. Exhaust fans and related ductwork and insulation. j. HVAC controls and control systems. k. Miscellaneous earthwork related to the installation of the mechanical contract work. l. Testing, adjusting, and balancing. m. Department instruction and training. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $100,000
05/25/2023 06:00 PM UTC
FDC-428-6503.3
Plumbing Construction, Showerhouse Replacement Phase 1 & Full Service Campsites Locust Lake State Park This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Domestic water system piping. b. Water closets, urinals, lavatories, shower heads/controls, hose bibs, and other plumbing fixtures. d. Water heaters. e. Drinking fountain. f. Floor drains and trench drains. g. Sanitary sewer and vent piping. h. Propane gas piping from building to tank. Coordinate with .1 General Construction Contract for trenching and backfill. i. Connection to existing/relocated propane gas tanks. j. Department instruction and training. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
05/25/2023 06:00 PM UTC
FDC-428-6503.4
Electrical Construction, Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Disconnecting electrical devices and equipment scheduled for removal by .1 Contract. b. Coordination with Utility Company for installation of new transformer. c. Conduit and placement of underground electrical. Coordinate with .1 General Construction Contract for trenching and backfill. d. Electric kiosk, panels, cabinets, and other equipment. e. Complete power and lighting systems, including conduit, wiring, boxes, panels, and fixtures and devices. f. Lighting control system. g. Campsite electric pedestals. h. Connection of power to existing equipment and new equipment installed by others. i. Emergency lighting system. j. Miscellaneous earthwork related to the installation of the electrical contract work. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $400,000 - $1 Million
05/25/2023 06:00 PM UTC
FDC-210-07223.1
General Construction, Rehabilitation Sewage System North Shore Moraine State Park Muddy Creek and Worth Townships, Butler County, Pennsylvania Without intending to limit and/or restrict the volume of work required by these specifications or as shown on the contract drawings, work included under this contract includes the rehabilitation of five (5) sewage pumping stations. Four (4) of the existing stations, 8, 14, 15 and 16, are being converted from dry pit/wet pit type stations to submersible stations. Station 10 is being upgraded and will remain a dry pit/wet pit type station. Pump station 9 is being abandoned. The project also includes installing new force mains for several of the stations by horizontal directional drilling and trenching methods, rehabilitation and lining of manholes, using CIPP lining process for approximately 1,400 lineal feet of sanitary sewer. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $1 Million
05/18/2023 06:00 PM UTC
FDC-210-07223.4
Electrical Construction, Rehabilitation Sewage System North Shore Moraine State Park Muddy Creek and Worth Townships Work included under this contract consists of but is not necessarily limited to, the furnishing of all labor, superintendence, materials and tools and equipment, miscellaneous items and performing all electrical work necessary to complete the rehabilitation of five (5) sewage pumping stations. Four of the existing stations 8, 14, 15, and 16 are being converted from dry pit/wet pit type stations to submersible stations. Station 10 is being upgraded and will remain a dry pit/wet pit type station. Pump station 9 is being abandoned. The project also includes installing new force mains for several of the stations by horizontal directional drilling and trenching methods, rehabilitation and lining of manholes, using CIPP lining process for approximately 1,400 lineal feet of sanitary sewer. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
05/18/2023 06:00 PM UTC
FDC-429-102326.1
Lakeside Lodge Septic Lackawanna State Park Benton Township, Lackawanna County Work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items, and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of the Department. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $50,000
05/11/2023 06:00 PM UTC
FDC-018-101524.1
General Construction, Weiser State Forest, RMD Drive and - MB Lot Paving, Forest District 18, Conyngham Township, Columbia County, Pennsylvania Work included under this contract consists of installation of new paved road on portion of the access roadway to maintenance building and new paved parking area, installation of two (2) culvert pipes, inlets and outlets, construction of ditches/swales, striping of the parking area, concrete slab adjoining the front apron and existing concrete slab of the maintenance building garage as indicated on the Contract Drawings. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
05/11/2023 06:00 PM UTC
FDC-014-10156.1
Plug and Properly Abandon Orphaned Oil & Gas Wells Northeast Jamison Tract (DGS-196-13, Phase 2) Forest District 14, Cornplanter State Forest Harmony Township, Forest County, Pennsylvania The scope of work for this project is the cleaning out and plugging of 12 oil and gas wells located within the Cornplanter State Forest boundaries, installation of E&S control measures and site restoration as further described in the technical specifications. The list of well identification numbers is as follows: 053-00785, 053-00893, 053-00907, 053-00908, 053-00910, 053-22001, 053-22002, 053-22003, 053-22004, 053-22043, 053-22045, and 053-22046 DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
04/27/2023 06:00 PM UTC
91 - 100 of 109 Solicitations