CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
| 08/11/2026 07:01 PM UTC |
|
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
| 08/18/2026 07:01 PM UTC |
|
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
| 08/20/2026 07:01 PM UTC |
|
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
| 08/27/2026 07:01 PM UTC |
|
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
| 09/03/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP1243665-Frederiksen Court Community Center-RTU-Replacement
This project includes, but is not limited to, the replacement of six RTUs at the Frederiksen Court Community Center.
| 07/09/2024 07:01 PM UTC |
|
CP1240383-Utilities-Power Plant-Service Water Pump-Replacement
This project includes, but is not limited to, replacing the current 2 service water pumps with 4 service water pumps with VFDs (variable frequency drive), modified piping, manual valves, and new control valves.
| 06/25/2024 07:01 PM UTC |
|
CP1226590-Institutional Roads 2024-University Boulevard and 6th Street-Signal Replacement
This project will replace the existing traffic signals with new signals that meet current traffic control standards. Scope of work includes, but is not limited to, new signal poles, heads, controllers, countdown timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing, ADA compliant crosswalk controls, and concrete patching in the intersection.
| 06/18/2024 07:01 PM UTC |
|
CP1200333-Sweeney Hall-Rooms 2038 and 2058-Remodel
This project includes, but is not limited to, remodeling two adjacent laboratories to connect them and add the infrastructure needed for research. Work will include new data, lighting, ceilings, finish patch and repair as needed, corrected water and air locations, and new lab casework.
| 06/11/2024 07:01 PM UTC |
|
CP1175069-ISU Child Care Center at Veterinary Medicine-Remodel
This project includes, but is not limited to, replacement of flooring and wall base, countertops, and an exterior door. Work also includes replacing wood trim at five windows and replacement of thirteen window units.
| 05/30/2024 07:01 PM UTC |
|
CP1234647-Patterson Hall-Rooms 2119 and 2119A-Remodel
This project will remodel an existing research lab to accommodate new equipment for needed research. This project includes, but is not limited to, abatement of the existing floor and replacing it with new floors, replacing existing casework including wall cabinets, new lighting, and updating lab safety features to accommodate the new layout.
| 05/23/2024 07:01 PM UTC |
|
CP1232074-Black Engineering-Room 1056-Remodel
This project will remodel room 1056 in Black Engineering to remove obsolete equipment and install the air handler unit being removed from LeBaron Hall. The project includes, but is not limited to, new ductwork and electrical, a new exhaust fan, gas connections, a toxic gas cabinet, and refinishing the floor.
| 05/16/2024 07:01 PM UTC |
|
CP1229849-Parking Lot 92-Construction
This project includes, but is not limited to, the construction of a new parking lot with approximately 65 stalls along the west side of Christensen Drive at the College of Veterinary Medicine. Work will also include parking lot lighting and a sidewalk connection to the existing pedestrian circulation system.
| 05/14/2024 07:01 PM UTC |
|
CP1105475-Bruce McKee Indoor Tennis Complex-Remodel
The McKee Indoor Tennis Complex will become available with the relocation of the Tennis program to a new location. Through renovation, this space will meet the needs of the Volleyball program with two practice courts, locker room, coaches and staff offices, team room, and training room. The project will relocate the building entrance from the northwest corner of the building to the west side. The mechanical and electrical systems, graphics and wayfinding will be upgraded to meet the needs of the new occupants.
| 05/07/2024 07:01 PM UTC |
|
CP1170291-Veterinary Medicine-Domestic Water Line Replacement-Phase 7
This project includes, but is not limited to, the replacement of the deteriorating galvanized domestic water lines in the facility and to continue to add isolation values to improve the zoning of the domestic water service. The original galvanized piping will be replaced by copper piping and will include isolation gate valves to support ongoing and future maintenance of this facility.
| 04/25/2024 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.