General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002646-Beardshear Hall-Chilled Water Line Replacement-Phase 2
This project includes, but is not limited to, the replacement of the main chilled water lines in the basement, installation of additional gate valves to provide for improved zoning of the chilled water service, preparation for the replacement of the risers and returns for the next phase, and relocation of existing cable trays for better access.
04/27/2023 07:01 PM UTC
CP1017470-Memorial Union-Fountain of the Four Seasons-Renovation
The project consists of, but is not limited to, the renovation of the Memorial Union Fountain of the Four Seasons. Salvage and reinstallation of paving system and limestone units, select limestone unit replacements, select plumbing salvage, demolition and reconstruction of concrete structures, mechanical, electrical, and waterproofing systems. Coordination with Owners representative of installation of limestone sculptures and terra cotta units by others.
04/20/2023 07:01 PM UTC
CP1094910-Buchanan Residence Hall-Water Service Piping-Replacement
The project consists of, but is not limited to, new 8 inch Ductile Iron water pipe, remove abandoned utilities, remove and replace PCC sidewalk, and grading with topsoil.
04/13/2023 07:01 PM UTC
CP1088360-Beyer Hall-Swimming Pool-Repairs
The project consists of, but is not limited to, replacement of existing pool steam-to-water heat exchanger and associated piping and controls. Replacement of several manual isolation valves and pipe couplings. Project must be completed by 6:00 a.m. on August 20, 2023.
04/11/2023 07:01 PM UTC
CP1001602-Roberts Residence Hall-Patio Repairs-West
The project consists of, but is not limited to, the repair and replacement of the patio structure, surface, stairs, and railings on the west exterior patio at Roberts Residence Hall. Interior patio walls below the surface will be repointed and waterproofed. The current patio crawlspace will be regraded, filled with geofoam, and topped with a new concrete base and patio surface. New subdrainage, downspouts, and patio surface drains will be connected to the existing storm drain.
03/28/2023 07:01 PM UTC
CP002509-Curtiss Farm-Feed Mill and Grain Science Complex-Sanitary Sewer Extension
The project consists of, but is not limited to, the installation of approximately 2500 feet of sanitary sewer line along State Ave. Work includes a combination of trenchless and trenched installation. Work also includes supplying and installing several manholes.
03/09/2023 08:01 PM UTC
CP1088271-EHSSB-Interior Improvements
This project includes, but is not limited to, architectural, electrical, and interior design work required to replace the existing raised floor system. The existing system furniture will be removed, prior to the new raised floor installation, and reinstalled at completion. New carpet tiles and floor base will also be installed.
03/09/2023 08:01 PM UTC
CP002619-Therkildsen Industrial Engineering Building-Parking Lot 10 Expansion
The project consists of, but is not limited to, expansion of Parking Lot 10, located west of Town Engineering Building. The project includes pavement removal, grading, storm drainage utilities, underground storm detention, asphalt paving, asphalt mill and overlay, concrete curb and gutter, sidewalks and lighting.
03/07/2023 08:01 PM UTC
CP930111-Veterinary Medicine-Room 1351-Remodel
This project includes, but is not limited to the demolition of the existing interior horse stalls, new LED lighting and electrical outlets, new finishes, including impervious surfaces, floor, walls, and ceiling in specified areas, mechanical upgrades to maintain a minimum required air changes, and biosafety Level 2 Lab requirement in a small portion of the lab.
02/23/2023 08:01 PM UTC
CP986875-Frederiksen Court-Building 31-Fire Alarm System Upgrade
The project consists of, but is not limited to, fire alarm system upgrade including replacement of panel and all wiring according to Department of Residence standards and replacement of the apartment devices with addressable devices.
02/16/2023 08:01 PM UTC
81 - 90 of 343 Solicitations
1 2 5 6 7 9 11 12 13 34 35