General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
CP1303287-Student Services Building-East Wing Ground Floor Remodel
This project will remodel multiple rooms, hallways and stairwells in the East Wing of the Student Services Building. The scope of work includes, but is not limited to, patching and painting; new flooring; new upper and lower cabinets; new furniture, tables, and chairs; new cabinetry; and new carpet and blinds.
05/05/2026 07:01 PM UTC
CP1311894-Veterinary Medical Research Institute Animal Holding #40-85kW Generator Replacement
This project will replace the existing 85kW indoor open-frame natural gas generator in VMRI 40 with a similarly sized outdoor natural gas generator with weather and sound-insulated housing. The scope of work includes installing a concrete pad, removing and replacing the generator, and reconfiguring all related electrical connections to meet current codes. Patch and repair the existing hole, and grade and seed.
05/05/2026 07:01 PM UTC
CP1289132-Reiman Gardens Conservatory-Boilers-Replacement
This project will remove and replace four existing boilers; increase the size of existing concrete curbs to support new equipment; install a new domestic water heat exchanger and all associated electrical, plumbing, and gas piping to complete the work.
05/07/2026 07:01 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
CP1177920-Sloss House-Common Area Improvements
This project includes, but is not limited to, remodeling the exterior front entry railings, door and frame, side windows, and threshold. Also included is the interior remodeling of the wood trim, doors, flooring and windows, and painting the common spaces throughout the home.
04/25/2024 07:01 PM UTC
CP1226572-Carver Hall-Room 0060-Remodel
This project includes, but is not limited to, remodeling the current space including new finishes, lighting, and testing tables.
04/18/2024 07:01 PM UTC
CP1166619-MacKay Hall-Roof Replacement-Sections A-E and G-I
This project will replace roof sections A, B, C, D, E, G, H, and I at MacKay Hall. These sections of the roof are 18-year-old EPDM systems. This project includes, but is not limited to, replacement of the roof with a system designed for a minimum life expectancy of 30 years, roof insulation to meet current energy codes, roof safety improvements as needed to meet current university standards, skylight replacement, masonry repairs, tuckpointing, caulking of all features, roof curbs and parapet walls above the roofline to prevent water infiltration through these critical connections, and roof access improvements as needed to meet current university standards.
04/11/2024 07:01 PM UTC
CP1175478-Meats Laboratory-Cooler-Repairs
This project includes, but is not limited to, the repair of walls (exterior and interior) and ceiling surfaces of three cooler rooms at the Meats Laboratory. Removal of damaged, wet material will expose interior wall conditions and help to locate areas of air leakage. Repairs will be made to prevent moisture build-up. New lighting, insulated walls, and insulated ceiling panels will be installed. The project also includes the demolition and removal of the concrete cooler room floors. New concrete floors, with appropriate insulation beneath, will be installed.
04/09/2024 07:01 PM UTC
CP1008443-Family Resource Center-Remodel-Life Cycle Improvements
This project includes, but is not limited to, the replacement of heating and cooling units, removal of vinyl floor tile and replace with new flooring, removal of plastic laminate countertops and replacement with solid surface countertops, replace damaged base cabinet doors, modification of kitchen cabinets for a new oven range and hood, installation of a garbage disposal, replacement of fiberglass reinforced panels in room 1053, refinishing wood windowsills, painting rooms, repairs to EIFS and miscellaneous masonry damage, cleaning the exterior, and replacement of exterior sealant joints.
04/04/2024 07:01 PM UTC
CP1233097-Utilities-Richardson Court-Water Main-Improvements
The project includes, but is not limited to, replacing approximately 950 feet of iron water main pipe with a larger diameter HDPE pipe in the Richardson Court Area. HDPE is an EPA and DNR-approved water main pipe material that will not corrode, which should reduce future maintenance costs.
04/04/2024 07:01 PM UTC
CP990455-College of Design-Faculty Offices-Remodel
This project includes, but is not limited to, the improvement of faculty office utilization in the College of Design. This project would provide for remodeling of faculty working environments and improve the types of spaces that could support faculty through single offices, double offices, and collaboration spaces. Architectural and interior design services will be provided to review office furniture configurations and interior finish updates at these spaces.
04/02/2024 07:01 PM UTC
CP1234052-Frederiksen Court Building 72-Fire Alarm Upgrade
This project includes, but is not limited to, fire alarm system upgrade including replacement of the fire alarm panel and all wiring according to Department of Residence standards, and replacement of the apartment devices with addressable devices.
04/02/2024 07:01 PM UTC
CP1201476-Hixson-Lied Student Success Center-Rooms 2242 and 2280-Remodel
This project includes, but is not limited to, the remodeling of rooms 2242 and 2280 of the Hixson-Lied Student Success Center to accommodate the relocation of the Center for Excellence in Learning and Teaching (CELT) testing center. Work includes demolition of interior space including existing casework, chair rails, doors, flooring, and wall base. New work includes patching and repairing walls, new paint, doors, lockers, security cameras, testing station furniture, and mechanical and electrical work to support the remodel. New office furniture for the staff is also included.
03/28/2024 07:01 PM UTC
CP943347-Scheman Building-Renovation
The project will renovate portions of the ground floor main entrances, entry lobby, and restrooms and the first floor event and circulation spaces, and restrooms. The existing Benton Auditorium will be remodeled into a flexible event space with stage and seating areas. The project will also provide new food and beverage amenities and improvements to wayfinding and signage to improve the guest experience. The project will also upgrade existing mechanical and electrical systems to meet exiting codes and the requirements of the renovated spaces. No existing occupants will be relocated during construction or after the project is completed.
03/21/2024 07:01 PM UTC
81 - 90 of 399 Solicitations
1 2 5 6 7 9 11 12 13 39 40