General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP1232074-Black Engineering-Room 1056-Remodel
This project will remodel room 1056 in Black Engineering to remove obsolete equipment and install the air handler unit being removed from LeBaron Hall. The project includes, but is not limited to, new ductwork and electrical, a new exhaust fan, gas connections, a toxic gas cabinet, and refinishing the floor.
05/16/2024 07:01 PM UTC
CP1229849-Parking Lot 92-Construction
This project includes, but is not limited to, the construction of a new parking lot with approximately 65 stalls along the west side of Christensen Drive at the College of Veterinary Medicine. Work will also include parking lot lighting and a sidewalk connection to the existing pedestrian circulation system.
05/14/2024 07:01 PM UTC
CP1105475-Bruce McKee Indoor Tennis Complex-Remodel
The McKee Indoor Tennis Complex will become available with the relocation of the Tennis program to a new location. Through renovation, this space will meet the needs of the Volleyball program with two practice courts, locker room, coaches and staff offices, team room, and training room. The project will relocate the building entrance from the northwest corner of the building to the west side. The mechanical and electrical systems, graphics and wayfinding will be upgraded to meet the needs of the new occupants.
05/07/2024 07:01 PM UTC
CP1170291-Veterinary Medicine-Domestic Water Line Replacement-Phase 7
This project includes, but is not limited to, the replacement of the deteriorating galvanized domestic water lines in the facility and to continue to add isolation values to improve the zoning of the domestic water service. The original galvanized piping will be replaced by copper piping and will include isolation gate valves to support ongoing and future maintenance of this facility.
04/25/2024 07:01 PM UTC
CP1177920-Sloss House-Common Area Improvements
This project includes, but is not limited to, remodeling the exterior front entry railings, door and frame, side windows, and threshold. Also included is the interior remodeling of the wood trim, doors, flooring and windows, and painting the common spaces throughout the home.
04/25/2024 07:01 PM UTC
CP1226572-Carver Hall-Room 0060-Remodel
This project includes, but is not limited to, remodeling the current space including new finishes, lighting, and testing tables.
04/18/2024 07:01 PM UTC
CP1166619-MacKay Hall-Roof Replacement-Sections A-E and G-I
This project will replace roof sections A, B, C, D, E, G, H, and I at MacKay Hall. These sections of the roof are 18-year-old EPDM systems. This project includes, but is not limited to, replacement of the roof with a system designed for a minimum life expectancy of 30 years, roof insulation to meet current energy codes, roof safety improvements as needed to meet current university standards, skylight replacement, masonry repairs, tuckpointing, caulking of all features, roof curbs and parapet walls above the roofline to prevent water infiltration through these critical connections, and roof access improvements as needed to meet current university standards.
04/11/2024 07:01 PM UTC
CP1175478-Meats Laboratory-Cooler-Repairs
This project includes, but is not limited to, the repair of walls (exterior and interior) and ceiling surfaces of three cooler rooms at the Meats Laboratory. Removal of damaged, wet material will expose interior wall conditions and help to locate areas of air leakage. Repairs will be made to prevent moisture build-up. New lighting, insulated walls, and insulated ceiling panels will be installed. The project also includes the demolition and removal of the concrete cooler room floors. New concrete floors, with appropriate insulation beneath, will be installed.
04/09/2024 07:01 PM UTC
CP1008443-Family Resource Center-Remodel-Life Cycle Improvements
This project includes, but is not limited to, the replacement of heating and cooling units, removal of vinyl floor tile and replace with new flooring, removal of plastic laminate countertops and replacement with solid surface countertops, replace damaged base cabinet doors, modification of kitchen cabinets for a new oven range and hood, installation of a garbage disposal, replacement of fiberglass reinforced panels in room 1053, refinishing wood windowsills, painting rooms, repairs to EIFS and miscellaneous masonry damage, cleaning the exterior, and replacement of exterior sealant joints.
04/04/2024 07:01 PM UTC
CP1233097-Utilities-Richardson Court-Water Main-Improvements
The project includes, but is not limited to, replacing approximately 950 feet of iron water main pipe with a larger diameter HDPE pipe in the Richardson Court Area. HDPE is an EPA and DNR-approved water main pipe material that will not corrode, which should reduce future maintenance costs.
04/04/2024 07:01 PM UTC
21 - 30 of 343 Solicitations
1 3 5 6 7 8 9 34 35