General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP1175253-Carrie Chapman Catt Hall-Rooms 0102 and 0129-Remodel
This project includes, but is not limited to, the remodeling and repurposing of existing administrative and storage spaces to create an updated and welcoming student lounge and program space that includes one admin workstation. This remodel includes new flooring, ceiling, lighting, windows, doors, paint, a new VAV box, and associated ductwork and controls.
12/07/2023 08:01 PM UTC
CP1118655-Memorial Union-Bookstore-Lighting Replacement
This project includes, but is not limited to, replacing the lighting throughout the University Bookstore with new fixtures, LED lighting and controllers, converting to 120 Volts, and adding battery packs.
12/07/2023 08:01 PM UTC
CP002439-East of University Blvd-Site Improvements-Recreation Svcs & Field Lighting-Foot Wash
Project scope includes adding a foot wash station to the sand volleyball courts.
12/05/2023 08:01 PM UTC
CP1159926-Maple Willow Larch Commons-Seasons Marketplace-Remodel
The project will remodel portions of the back of house in the Seasons Marketplace dining facility at the Maple Willow Larch Commons. Back of house restrooms and food preparation areas will be updated due to deteriorating finishes, code and standards compliance, equipment upgrades, and improved workflows.
11/16/2023 08:01 PM UTC
CP1161151-Utilities-Veenker Memorial Golf Course-Well Installation
The project will install a water well and associated small pump house on Veenker Memorial Golf Course to provide water for course irrigation. The new well will replace a recently failed water line running between the main campus and the golf course irrigation pond.
11/09/2023 08:01 PM UTC
CP1164931-Armstrong Memorial Research and Demonstration Farm-Machine Storage Building
The project consists of, but is not limited to, design and construction of a machine storage building. The building will be approximately 7,200 gsf, will be post frame construction, and will have metal roofing and siding.
10/24/2023 07:01 PM UTC
CP1119386-Student Innovation Center-Administration Suite-Remodel
The project consists of, but is not limited to, the remodeling of rooms 2117, 2119, and 2120 to accommodate the expansion of the existing administration office suite currently located in rooms 2118 and 2118A of the Student Innovation Center. Work includes demolition of interior space including walls and finishes. New work includes new walls, finishes, and modified mechanical and electrical work to support the remodel.
10/19/2023 07:01 PM UTC
CP1161151-Utilities-Veenker Memorial Golf Course-Well Installation
The project consists of, but is not limited to, the installation of an irrigation well, pump, electrical service and associated piping.
08/10/2023 07:01 PM UTC
CP1095296-Beardshear Hall-Room 1350-Remodel
This project includes, but is not limited to, remodeling the existing office suite and adjacent treasurer's office. The existing conference room will be expanded, individual office spaces will be created, and the interior finishes updated.
08/08/2023 07:01 PM UTC
CP1001182-Town Engineering Building-Facility and Infrastructure-Improvements-480V Electrical and Chilled Water
This project consists of, but is not limited to, tap existing chilled water mains in basement and install chilled water piping to new heat exchanger in the basement mechanical room. Install pump, air/dirt separator, expansion tank and process water loop piping for two electrohydraulic pumps. Tap existing 480V service, install new disconnect, two new panels, conduit, wiring and hook-ups for concrete robot, two stud welders, two hydraulic pumps and one process chilled water pump and VFD.
08/01/2023 07:01 PM UTC
51 - 60 of 343 Solicitations
1 2 3 4 6 8 9 10 34 35