CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
| 07/08/2025 07:01 PM UTC |
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
| 07/22/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP1010421-Patterson Hall-Roof Replacement-Sections C, D, G, X, and W
This project includes, but is not limited to, the replacement of the existing roof systems at roof sections C, D, G, X, and W. All existing ballast, membranes, flashings, fiberboards, and insulation will be removed and replaced with a new, fully adhered, EPDM roof system with new insulation below. The new roof system is designed to have a minimum useful life expectancy of 30 years. New walk pads and appropriate safety equipment will also be included to meet university standards. The existing termination bar sealant at the perimeter of roof section D as well as the asphalt layer beneath roof sections X and W contain asbestos and will be properly abated.
| 12/21/2023 08:01 AM UTC |
CP1118937-MacKay Hall-Roof Replacement-Section F and Parapet Wall Repair
This project will replace roof Section F and repair the parapet wall at MacKay Hall. This section of the roof is a built-up roof (BUR) and is over 25 years old with a history of leaks. This project includes, but is not limited to:
• Replacement of the roof with a system designed for a minimum life expectancy of 30 years
• Roof insulation to meet current energy codes
• Roof safety improvements as needed to meet current university standards
• Repair, tuckpointing, or caulking of all features, roof curbs, and parapet walls above the roofline to prevent water infiltration through these critical connections
• Addition of a roof access door
| 12/19/2023 08:01 PM UTC |
CP1146627-Agronomy Hall-Room 2050-Remodel
This project includes, but is not limited to, remodeling of flooring, lighting, walls, ceilings, and furniture in the existing classroom. Also included are new diffusers, ductwork, and technology upgrades.
| 12/14/2023 08:01 PM UTC |
CP1004288-CYTown-Parking and Infrastructure-Phase 2
This project includes, but is not limited to, construction of replacement parking with new lighting and installation of underground infrastructure, which would include new water, power, gas, telecommunications, storm sewer, and sanitary lines to support future development. The project would also relocate the CyRide Transit Hub and raise a portion of the site above 100-year flood plain of Ioway Creek.
| 12/14/2023 08:01 PM UTC |
CP002724-Friley Residence Hall-Bathroom Improvements-Stack E & Stack F
This project title is now - FRILEY RESIDENCE HALL-BATHROOM IMPROVEMENTS-STACK E, STACK F & STACK G
The project consists of, but is not limited to, remodel of bathrooms in stacks E, F and G. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
| 12/12/2023 08:01 PM UTC |
CP1167539-Parking Lots 2023-Pavement Preservation
This project will perform approximately 1,550 SY of concrete patching intended to extend the life of the pavement and improve the overall pavement condition index (PCI) of Parking Lots on the ISU Campus. Improvements are included in the Five-Year Parking Lot Improvement Plan.
| 12/12/2023 08:01 PM UTC |
CP1175253-Carrie Chapman Catt Hall-Rooms 0102 and 0129-Remodel
This project includes, but is not limited to, the remodeling and repurposing of existing administrative and storage spaces to create an updated and welcoming student lounge and program space that includes one admin workstation. This remodel includes new flooring, ceiling, lighting, windows, doors, paint, a new VAV box, and associated ductwork and controls.
| 12/07/2023 08:01 PM UTC |
CP1118655-Memorial Union-Bookstore-Lighting Replacement
This project includes, but is not limited to, replacing the lighting throughout the University Bookstore with new fixtures, LED lighting and controllers, converting to 120 Volts, and adding battery packs.
| 12/07/2023 08:01 PM UTC |
CP002439-East of University Blvd-Site Improvements-Recreation Svcs & Field Lighting-Foot Wash
Project scope includes adding a foot wash station to the sand volleyball courts.
| 12/05/2023 08:01 PM UTC |
CP1159926-Maple Willow Larch Commons-Seasons Marketplace-Remodel
The project will remodel portions of the back of house in the Seasons Marketplace dining facility at the Maple Willow Larch Commons. Back of house restrooms and food preparation areas will be updated due to deteriorating finishes, code and standards compliance, equipment upgrades, and improved workflows.
| 11/16/2023 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.