Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
| 11/11/2025 08:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP1119681-Veterinary Diagnostic Laboratory-Phase 2
This project proposes an addition to the currently authorized and under-construction Veterinary Diagnostic Laboratory (VDL) Building, providing approximately 78,500 gsf of additional space to co-locate the remaining testing sections of the laboratory, diagnostic research activities, and administrative staff with the front-end sample processing and receiving functions of the lab.
| 03/05/2024 08:01 PM UTC |
|
CP965420-Jack Trice Stadium-Press Box Elevator-Improvements
This project includes, but is not limited to, modernizing the elevator controller, hoisting equipment, and door operations.
| 02/22/2024 08:01 PM UTC |
|
CP1197515-Farm House-Roof Replacement
This project includes, but is not limited to, the replacement of the existing cedar shake shingles and ridge vent, painting the wood soffits and fascia, new gutters, flashing at the chimney, wood trim replacement at the dormer, and restoring wood trim and accent railings and both the North, West, and South porches, all in compliance with historical preservation practices and methods. Work will include lead abatement and architectural work.
| 02/08/2024 08:01 PM UTC |
|
CP1000679-Friley Residence Hall-Courtyard Roof-Improvements
The Friley Residence Hall courtyard is both an outdoor seating area and a structural roof over food service and dining areas below the courtyard. The courtyard consists of a concrete deck, which is now deteriorated. This project includes, but is not limited to, repairs to the deck and installing a new protective waterproof membrane. A new pedestal-mounted paver system will be installed over the membrane to provide a courtyard walking surface.
| 02/06/2024 08:01 PM UTC |
|
CP1123016-Oak-Elm Residence Hall-First Floor Elm-Remodel
This project includes, but is not limited, to the remodeling of existing bathrooms and an adjacent, vacant, resident assistant suite into an enlarged shared resident bathroom and a single-stall public bathroom. Also included is the redesign of an exterior entrance vestibule to create hallway space to provide integration of student housing areas. Two vacant resident rooms and corridors will also be remodeled to match standard modern dorm room finishes. Mechanical, ventilation, electrical, and plumbing upgrades will be made to accommodate all remodeled spaces.
| 01/25/2024 08:01 PM UTC |
|
CP1010421-Patterson Hall-Roof Replacement-Sections C, D, G, X, and W
This project includes, but is not limited to, the replacement of the existing roof systems at roof sections C, D, G, X, and W. All existing ballast, membranes, flashings, fiberboards, and insulation will be removed and replaced with a new, fully adhered, EPDM roof system with new insulation below. The new roof system is designed to have a minimum useful life expectancy of 30 years. New walk pads and appropriate safety equipment will also be included to meet university standards. The existing termination bar sealant at the perimeter of roof section D as well as the asphalt layer beneath roof sections X and W contain asbestos and will be properly abated.
| 01/04/2024 08:01 PM UTC |
|
CP002649-Black Engineering-Emergency Power Transfer Switch-Replacement
This project will install one or more new emergency and standby power transfer switches, associated cabling, and new electrical distribution equipment to replace the existing transfer switch and existing electrical distribution equipment in their current location in the basement main electrical room of Black Engineering.
| 12/21/2023 08:01 PM UTC |
|
CP1010421-Patterson Hall-Roof Replacement-Sections C, D, G, X, and W
This project includes, but is not limited to, the replacement of the existing roof systems at roof sections C, D, G, X, and W. All existing ballast, membranes, flashings, fiberboards, and insulation will be removed and replaced with a new, fully adhered, EPDM roof system with new insulation below. The new roof system is designed to have a minimum useful life expectancy of 30 years. New walk pads and appropriate safety equipment will also be included to meet university standards. The existing termination bar sealant at the perimeter of roof section D as well as the asphalt layer beneath roof sections X and W contain asbestos and will be properly abated.
| 12/21/2023 08:01 AM UTC |
|
CP1118937-MacKay Hall-Roof Replacement-Section F and Parapet Wall Repair
This project will replace roof Section F and repair the parapet wall at MacKay Hall. This section of the roof is a built-up roof (BUR) and is over 25 years old with a history of leaks. This project includes, but is not limited to:
• Replacement of the roof with a system designed for a minimum life expectancy of 30 years
• Roof insulation to meet current energy codes
• Roof safety improvements as needed to meet current university standards
• Repair, tuckpointing, or caulking of all features, roof curbs, and parapet walls above the roofline to prevent water infiltration through these critical connections
• Addition of a roof access door
| 12/19/2023 08:01 PM UTC |
|
CP1146627-Agronomy Hall-Room 2050-Remodel
This project includes, but is not limited to, remodeling of flooring, lighting, walls, ceilings, and furniture in the existing classroom. Also included are new diffusers, ductwork, and technology upgrades.
| 12/14/2023 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.