General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1044575-Lloyd Veterinary Medical Center-Pet Cancer Clinic-Remodel and Addition
This project is an addition and renovation to the existing LLoyd Veterinary Medical Center to develop a Comparative Oncology Center. The new pet cancer clinic includes new exams rooms, animal day wards, clinical procedure and support rooms, office spaces,and client waiting areas.
01/20/2026 08:01 PM UTC
CP1278052-State Avenue Warehouse-Roof Replacement
The scope of work includes, but is not limited to, removing existing EPDM roofing and insulation, removing two ventilators, and infilling open areas with roof panels. Install new insulation and EPDM roofing, as well as new flashing at vents and piping. Rework and install a new flashing tie-in to the existing west metal roof.
01/27/2026 08:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP1187632-Howe Hall-Roof Replacement-Section M
This project will remove the existing roof system down to the deck and replace with a new roofing system. The scope of work includes, but is not limited to, an EPDM (ethylene propylene diene monomer rubber) system designed for a minimum life expectancy of 25 years; new roof insulation to meet current energy codes; and roof access improvements to meet university standards
01/14/2025 08:01 PM UTC
CP1146935-Utilities-Switchgear Vault 24 and 25-Replacement
This project replaces two high-voltage electrical Switches, 24 and 25, with new switches near Estes Hall and Carver Hall, respectively. The new Switch 24 will be located at an above-ground pad north of Estes Hall. The new Switch 25 will be located in a new underground vault west of the existing vault. In both cases, the existing vaults will remain, repurposed to aid future cable installations. New underground conduit will also be added to each of the new vaults, and a new high-voltage cable will be installed between Switch 25 and Estes Hall.
01/14/2025 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
CP1241528-Parks Library-Tiers-Lighting Replacement
This project includes, but is not limited to, replacement of ceiling-mounted light fixtures with new light fixtures and replacement of building wiring as indicated on the drawings.
12/17/2024 08:01 PM UTC
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP1226581-Institutional Roads 2025-Stange Road-Reconstruction
Multiple road sections across campus have deteriorated and need full-depth concrete patching, asphalt patching, and mill and overlay work. This project includes, but is not limited to, repairs on Mortensen Road and Stange Road.
11/07/2024 08:01 PM UTC
CP1232074-Black Engineering-Room 1056-Remodel
This project will remodel room 1056 in Black Engineering to remove obsolete equipment and install the air handler unit being removed from LeBaron Hall. The project includes, but is not limited to, new ductwork and electrical, a new exhaust fan, gas connections, a toxic gas cabinet, and refinishing the floor.
10/31/2024 07:01 PM UTC
CP1230628-Welch Road-Pedestrian Bridge-Replacement
This project includes, but is not limited to, replacing the Welch Road pedestrian bridge over College Creek.
10/24/2024 07:01 PM UTC
CP1241528-Parks Library-Tiers-Lighting Replacement
Base bid includes, but is not limited to, replacement of ceiling-mounted light fixture interiors and lamps with "led" retrofit kits, as detailed on the drawings. Light fixture and building wiring will be replaced as indicated on the drawings.
10/24/2024 07:01 PM UTC
31 - 40 of 379 Solicitations
1 2 4 6 7 8 9 37 38