Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1
This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
| 04/21/2026 07:01 PM UTC |
|
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
| 04/23/2026 07:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 04/28/2026 07:01 PM UTC |
|
CP1303287-Student Services Building-East Wing Ground Floor Remodel
This project will remodel multiple rooms, hallways and stairwells in the East Wing of the Student Services Building. The scope of work includes, but is not limited to, patching and painting; new flooring; new upper and lower cabinets; new furniture, tables, and chairs; new cabinetry; and new carpet and blinds.
| 05/05/2026 07:01 PM UTC |
|
CP1311894-Veterinary Medical Research Institute Animal Holding #40-85kW Generator Replacement
This project will replace the existing 85kW indoor open-frame natural gas generator in VMRI 40 with a similarly sized outdoor natural gas generator with weather and sound-insulated housing. The scope of work includes installing a concrete pad, removing and replacing the generator, and reconfiguring all related electrical connections to meet current codes. Patch and repair the existing hole, and grade and seed.
| 05/05/2026 07:01 PM UTC |
|
CP1289132-Reiman Gardens Conservatory-Boilers-Replacement
This project will remove and replace four existing boilers; increase the size of existing concrete curbs to support new equipment; install a new domestic water heat exchanger and all associated electrical, plumbing, and gas piping to complete the work.
| 05/07/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
| 07/01/2025 07:01 PM UTC |
|
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
| 06/26/2025 07:01 PM UTC |
|
CP1270998-Coover Hall-Room 1219-Remodel
This project will add three additional offices to Coover Hall room 1219. The scope of work includes, but is not limited to, constructing new walls and updating finishes, renovating mechanical systems to accommodate additional occupants, reconfiguring existing furniture, and reworking data for new room arrangements.
| 06/19/2025 07:01 PM UTC |
|
CP1264020-Seed Science Building-Backup Generator-Installation
This project will provide backup power for the cooling system in the seed storage room. Existing emergency circuits will also be rewired to the new generator. Accessory systems such as ITS, fire alarm, and Metasys will be added to backup power. The scope of work includes, but is not limited to, a new generator, rewiring emergency/backup electrical power circuits, new lighting, and any appurtenant work.
| 06/03/2025 07:01 PM UTC |
|
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
| 05/29/2025 07:01 PM UTC |
|
CP1119832-Beardshear Hall-Window Repairs-Phases 1 and 2-Phase 2
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
| 05/22/2025 07:01 PM UTC |
|
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
| 05/13/2025 07:01 PM UTC |
|
CP1173440-Kildee Hall-AHU4 and AHU5-Replacement
This project consists of making modifications to complete a phased replacement of AHU4
and AHU5 in Kildee Hall. The work shall include, but is not necessarily limited to,
demolition of existing systems and components indicated to be removed, relocate
ductwork and piping to accommodate new AHU, providing new electrical feeds to new
AHU and existing equipment, adding a new dedicated outdoor AHU4K to serve the east
laboratory area, along with associated ductwork and piping, providing new controls for
added mechanical equipment, and electrical equipment installation, etc.
| 04/17/2025 07:01 PM UTC |
|
CP002439-East of University Boulevard Site Improvements-Recreation Services-Foot Wash
Project scope includes adding a foot wash station to the sand volleyball courts.
| 04/10/2025 07:01 PM UTC |
|
CP1251558-Parking Lots 2025-Pavement Preservation
This project includes, but is not limited to, reconstruction and utility improvements in Parking Lots 8, 16 and 36. Parking lot work will include concrete lot reconstruction, sidewalks, parking lot lighting, and site restoration. We will also work with Utilities to coordinate necessary steam tunnel repairs and replacement of a high voltage electric line in Lot 8 and a new watermain and services in Lot 36. Utilities will provide funding for these improvements after preliminary design and estimates are complete.
| 04/01/2025 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.