CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
07/22/2025 07:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP1175190-Coover Hall-Common Area Improvements
This project includes, but is not limited to, updating finishes, lighting, wall graphics, and spatial configuration to improve visitor and occupant perceptions of the space.
10/17/2024 07:01 PM UTC
CP002651-Gilman Hall-Electrical Panel Replacement-Phase 2
The project will replace outdated electrical panels in Gilman Hall with serviceable fully supported equipment and install new electrical distribution equipment and feeders. This project will also begin to remove and replace electrical equipment feeder sources that cross between original Gilman Hall and 1964 Gilman Addition.
10/10/2024 07:01 PM UTC
CP1242463-Memorial Union-Roof Sections A, D, F, and X-Replacement
This project includes, but is not limited to, the replacement of roof sections A, D, F, and X to meet current energy codes and roof safety standards. These new sections will have a life expectancy of at least 30 years.
10/10/2024 07:01 PM UTC
CP1250226-Heady Hall-Room 0382-Remodel
This project will remodel rooms 0382, 0382A, 0382B and 0382C. The project includes, but is not limited to architectural, mechanical, electrical, technology, equipment, finishes, and furniture.
10/03/2024 07:01 PM UTC
CP1235453-Student Services Building-First Floor-Remodel
This project will convert two offices into a more centrally located conference room, convert the conference room in the office suite area into three new offices, create an office suite for the Dean of Students, and upgrade finishes in multiple offices and corridors to match other recently completed interior improvements. This project includes, but is not limited to, architectural, mechanical, electrical, technology, equipment, finishes, and furniture.
09/26/2024 07:01 PM UTC
CP1239915-Howe Hall-Fire Panels-Replacement
This project will replace the existing fire alarm control panels and building transponders with current, supported technology. This includes, but is not limited to, control and annunciator panels, building transponders, and incompatible devices.
09/12/2024 07:01 PM UTC
CP965428-Jacobson Athletic Building-Elevator-Improvements
This project will modernize one passenger elevator in the Jacobson Athletic Building. The modernization includes new controller, door operating equipment, and signal fixtures
09/12/2024 07:01 PM UTC
CP1243948-Patterson Hall-Rooms 1140, 1142, and 1144-Remodel
This project will remodel rooms 1140, 1142, and 1144 into a new lab space. Work includes, but is not limited to, new flooring, cabinetry, lights, and finish upgrades.
09/05/2024 07:01 PM UTC
CP1241528-Parks Library-Tiers-Lighting Replacement
This project includes, but is not limited to replacing the ceiling mounted light fixture interiors and lamps on each of the seven (7) floors in the tiers within the I.S.U. Parks Library with new “LED retrofit kits” as detailed on the plan sheets. Light fixture and building wiring will also be replaced as indicated on the plan sheets. ALTERNATE ONE BID: In lieu of LED retrofit kits, replace the ceiling mounted light fixtures (housing, interior and lamps) with new light fixtures as detailed on the plan sheets.
08/15/2024 07:01 PM UTC
CP002660-Curtiss Farm-Plant and Seed Facility-Remodel
This project will consist of an addition to or partitioning of space currently used by the Plant Sciences Institute in order to separate critical drying activities for research. The project includes, but is not limited to, finish, mechanical, and equipment upgrades as needed.