Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP990455-College of Design-Faculty Offices-Remodel
This project includes, but is not limited to, the improvement of faculty office utilization in the College of Design. This project would provide for remodeling of faculty working environments and improve the types of spaces that could support faculty through single offices, double offices, and collaboration spaces. Architectural and interior design services will be provided to review office furniture configurations and interior finish updates at these spaces.
| 04/02/2024 07:01 PM UTC |
CP1234052-Frederiksen Court Building 72-Fire Alarm Upgrade
This project includes, but is not limited to, fire alarm system upgrade including replacement of the fire alarm panel and all wiring according to Department of Residence standards, and replacement of the apartment devices with addressable devices.
| 04/02/2024 07:01 PM UTC |
CP1201476-Hixson-Lied Student Success Center-Rooms 2242 and 2280-Remodel
This project includes, but is not limited to, the remodeling of rooms 2242 and 2280 of the Hixson-Lied Student Success Center to accommodate the relocation of the Center for Excellence in Learning and Teaching (CELT) testing center. Work includes demolition of interior space including existing casework, chair rails, doors, flooring, and wall base. New work includes patching and repairing walls, new paint, doors, lockers, security cameras, testing station furniture, and mechanical and electrical work to support the remodel. New office furniture for the staff is also included.
| 03/28/2024 07:01 PM UTC |
CP943347-Scheman Building-Renovation
The project will renovate portions of the ground floor main entrances, entry lobby, and restrooms and the first floor event and circulation spaces, and restrooms. The existing Benton Auditorium will be remodeled into a flexible event space with stage and seating areas. The project will also provide new food and beverage amenities and improvements to wayfinding and signage to improve the guest experience.
The project will also upgrade existing mechanical and electrical systems to meet exiting codes and the requirements of the renovated spaces.
No existing occupants will be relocated during construction or after the project is completed.
| 03/21/2024 07:01 PM UTC |
CP1175457-Sweeney Hall-Room 1058-Remodel
This project will remodel an existing research lab space to accommodate the needs and usage of Chemical and Biological Engineering and to make space for the new Biomedical Engineering major program. This project includes, but is not limited to, the demolition of existing wall-mounted items, patching and repairing of walls, new flooring, a new water line, compressed air, and reconfiguring power to accommodate new lab usage.
| 03/21/2024 07:01 PM UTC |
CP1201187-Agronomy Hall-Room B0515-Dehumidification Unit-Replacement
This project includes, but is not limited to, the replacement of the existing single dehumidification unit with two new dehumidification units to provide a 100% redundant system. Dehumidifiers will be racked on the floor in a similar arrangement to the condensing units on the third floor.
| 03/14/2024 07:01 PM UTC |
CP1119832-Beardshear Hall-Window Repairs-Phase 1
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
| 03/07/2024 08:01 PM UTC |
CP1119681-Veterinary Diagnostic Laboratory-Phase 2
This project proposes an addition to the currently authorized and under-construction Veterinary Diagnostic Laboratory (VDL) Building, providing approximately 78,500 gsf of additional space to co-locate the remaining testing sections of the laboratory, diagnostic research activities, and administrative staff with the front-end sample processing and receiving functions of the lab.
| 03/05/2024 08:01 PM UTC |
CP965420-Jack Trice Stadium-Press Box Elevator-Improvements
This project includes, but is not limited to, modernizing the elevator controller, hoisting equipment, and door operations.
| 02/22/2024 08:01 PM UTC |
CP1197515-Farm House-Roof Replacement
This project includes, but is not limited to, the replacement of the existing cedar shake shingles and ridge vent, painting the wood soffits and fascia, new gutters, flashing at the chimney, wood trim replacement at the dormer, and restoring wood trim and accent railings and both the North, West, and South porches, all in compliance with historical preservation practices and methods. Work will include lead abatement and architectural work.
| 02/08/2024 08:01 PM UTC |