General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
11/11/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002528-BioCentury Research Farm - HST Building Roof Replacement & Interior Remodel-Interior Remodel
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include spray foam insulation, steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
08/28/2018 07:01 PM UTC
CP002491 - Bessey Hall-Roof Replacement-Sections A-C, F and H
The project consists of, but is not limited to, the removal and replacement of roof sections A, B, C, F, & H due to the continual and ongoing maintenance, re-engineering Sections A,B,C,F & H to alleviate roof leak issues, replacement of swamp cooler curb and all roofing material down to the roof deck, removal of all abandoned roof equipment, repair sections properly prior to roof replacement, and replacement of all flashings.
08/23/2018 07:01 PM UTC
CP002501-Communications Building-Second Floor Remodel-Iowa Public Radio
The project consists of, but is not limited to, remodeling existing offices and conference space, ceiling replacement, flooring installation, painting, lighting, doors and associated hardware, lighting upgrades, millwork, mechanical, electrical, plumbing, and access controls.
08/07/2018 07:01 PM UTC
CP002528-BioCentury Research Farm - HST Building Roof Replacement
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to install a new structural retrofit roof sub-framing system, insulation, and new metal standing seam roof over an existing building roof.
07/19/2018 07:01 PM UTC
CP002485 - Department of Residence-Helser Residence Hall-Elevator Improvements
The project consists of, but is not limited to, modernization of the current freight elevator into a passenger elevator, construction of new elevator penthouse and mechanical room, and associated structural alterations for penetration of roof deck for new construction.
06/07/2018 07:01 PM UTC
CP002477 - Human Nutritional Sciences Building-AHU 1-Humidification System Replacement
The project consists of, but is not limited to, replacing the existing chilled water coil, replacing existing corroded ductwork, installing new humidification unit, and new electrical wiring for controls.
05/31/2018 07:01 PM UTC
CP002457 - Hub-Retail Dining Services Renovation
The project consists of, but is not limited to, renovation of the existing Hub’s interior. Renovation will include seating/dining area, back-of-house space, grille venue and coffee venue. The coffee venue will be relocated and separated from the grille.
05/10/2018 07:01 PM UTC
CP002387-Utilities-Lied Recreation Athletic Facility-Steam Supply Replacement-Gasket Replacement
The project consists of, but is not limited to, replacement of the existing coupling and gaskets that are a part of the joint and fitting assemblies on all existing grooved piping that is part of the heating water system.
05/08/2018 07:01 PM UTC
CP002055 - Biosciences Facilities-Advanced Teaching & Research Building-Zebra Fish Laboratory
The project consists of, but is not limited to, installation of new drywall partitions, continuation of the roughed in mechanical and electrical services. The installation of the following owner-furnished items: laboratory casework, doors and frames, fan coil units, lighting systems to complete this core support space in the basement of the new Advanced Teaching and Research Building.
04/26/2018 07:01 PM UTC
CP002401 - Armory-Window Replacement-Phase 2
The project consists of, but is not limited to, providing and installing new windows as indicated on construction documents and as required trim and sills.
04/12/2018 07:01 PM UTC
321 - 330 of 376 Solicitations
1 2 29 30 31 33 35 36 37 38