General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
05/13/2025 07:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002475 - Utilities-South Campus-No. 1 Feeder Replacement
The project consists of, but is not limited to, installing new 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations on above ground switchgear and transformer. Perform hi-pot cable tests on installed cable, splices, and terminations. De-energize and remove existing abandoned cable after new cable is installed.
03/15/2018 07:01 PM UTC
CP002422 - Hilton Coliseum Parking Expansion
The project consists of, but is not limited to, removal of existing HMA and PCC pavement, new HMA pavement with PCC curb and gutter and reclaimed HMA base, PCC sidewalks, storm sewer structures and piping, bioswale, parking lot and sidewalk lighting as well as upgrades to the lighting distribution system, telecom panel and raceway for TV truck connections on site, wayfinding and parking stall signage, gate installation, pavement markings and finish grading/topsoil.
03/13/2018 07:01 PM UTC
CP002404 - Parking Lot 96-Expansion
The project consists of, but is not limited to, sidewalk removal, street lights removal/replacement, pedestrian lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, electric vault lid replacement, storm sewer intakes, storm sewer piping, PCC sidewalk, PCC curb and gutter, HMA parking lot paving, traffic control and other associated work for a parking lot expansion project on the west side of the Veterinary Medicine campus at Iowa State University in Ames, Iowa.
03/08/2018 08:01 PM UTC
CP002379-Parks Library-Restroom Renovations
The project consists of, but is not limited to, renovation of existing restroom facilities within the 1960’s portion of Parks Library. Renovation includes two (2) stacks of restrooms, with restrooms located on four floors. New restrooms will be inserted into locations on First and Fourth floors which are not currently restrooms. Project also includes reconfiguration of underground sanitary sewer, connection of piping to new owner furnished water heater, and tie-in of existing water softener to new water heater.
03/06/2018 08:01 PM UTC
CP002363 - Reiman Gardens-Southwest Corner Improvements-Landscaping
The project consists of, but is not limited to, construction of plant gardens, connecting paths, water features, a single restroom building with mechanical space, a 40’ tall steel and wood tower, and associated earth work and utility services.
03/01/2018 08:01 PM UTC
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Irrigation and Turf
The project consists of, but is not limited to, installation of athletic field irrigation system, removal of existing field organic material, installation and establishment of new natural turf.
02/22/2018 08:01 PM UTC
CP002447 - Hamilton Hall-Window Replacement-Phase 2
The project consists of, but is not limited to, furnish and install new aluminum window system at areas indicated. Windows will be removed and disposed of by Owner’s abatement contractor. Coordinate removal of existing window assemblies and installation of new windows with Owner’s abatement contractor. Remove and reinstall existing window shades/blinds. Patch and paint adjacent walls as needed due to window replacement.
02/15/2018 08:01 PM UTC
CP002394 - Beardshear Hall-Air Handling Unit Replacement
The project consists of, but is not limited to, the removal and demolition of the existing air-handling unit in the mechanical space and the installation of a new air-handling unit in the same location
01/30/2018 08:01 PM UTC
CP002443 - Welch Avenue-CyRide Turnaround
The project consists of, but is not limited to, sidewalk removal, street & sidewalk lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, PCC sidewalk, PCC curb and gutter, PCC street paving, traffic control and other associated work for a bus turnaround project near the intersection of Welch Avenue and Storm Street in Ames, Iowa on the Iowa State University campus.
01/30/2018 08:01 PM UTC
CP002436 - Friley Residence Hall Window Replacement
The project consists of, but is not limited to the installation of new aluminum windows throughout Friley Hall to replace existing windows removed under separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during multiple phases during summers only – see Construction Progress Schedule and substantial completion dates.
01/25/2018 08:01 PM UTC
321 - 330 of 362 Solicitations
1 2 29 30 31 33 35 36 37