CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002567-Molecular Biology Building-Common Area Improvements
The project consists of, but is not limited to, cleaning, painting, carpeting, refinishing wood benches, masonry block and tile repair, and lighting upgrades.
05/30/2019 07:01 PM UTC
CP002571 - Lied Recreation Athletic Facility-Gasket Replacement
The project includes, but is not limited to, deepening grooves in the existing hydronic piping that is outside of tolerance limits and replacing existing couplings, valves, and flanges.
05/14/2019 07:01 PM UTC
CP002559 - Carver Hall-Rooms 0129, 0131, 0150, 0171, and 0173 Remodel
The project consists of, but is not limited to, remodeling existing classroom and office space into new office and interview space.
04/25/2019 07:01 PM UTC
CP002581 - Utilities-Maple Steam Vault-Expansion
The project consists of, but is not limited to, expanding the structure of existing vault located west of Maple Residence Hall, rerouting steam and condensate lines, installation of new vault lighting, and installation of sump pump.
04/25/2019 07:01 PM UTC
CP002504 - Beyer Hall-Room 1451 Remodel
The project consists of, but is not limited to, work associated with creating two new offices; walls, doors, carpet tile and epoxy flooring, and new ceiling tile. Mechanical work includes new Air Handler, ductwork, and diffusers. Electrical includes new light fixtures, receptacles, and data jacks.
04/23/2019 07:01 PM UTC
CP002549 - Lagomarcino Hall-Rooms W0081, W0079, and C0077W Remodel
The project consists of remodeling existing department space and two corridors and work includes, but is not limited to, ceiling and flooring replacement; lighting, mechanical, and electrical upgrades; new casework, paint, and furniture.
04/11/2019 07:01 PM UTC
CP002560 - Parking Lot 85E-Resurfacing and Expansion
The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The project consists of, but is not limited to, clearing and grubbing, pavement removal, grading, intake replacement, storm sewer installation, subgrade preparation, curb & gutter, asphalt milling, HMA pavement, 5” PCC sidewalk, full-depth HMA patching, reinforced PCC stairs, pavement markings, parking lot light lighting , concrete encased duct bank, traffic control, surface restoration, construction survey, and miscellaneous associated work.
04/11/2019 07:01 PM UTC
CP002568-Catt Hall-Rooms 0202, 0207, 0237, and 0251-Remodel
The project consists of, but is not limited to, rework of existing construction and addition of new offices at four locations within the second floor of Catt Hall. Mechanical, electrical, plumbing, sprinkler and communication systems to be modified and/or extended for new spaces. Coordinate work with furniture by Owner.
04/04/2019 07:01 PM UTC
CP002439 - East of University Boulevard-Site Improvements-Recreation Services-Field Lighting
The project consists of, but is not limited to, athletic field lighting and installation, including lighting controls, poles and lighting fixtures.
04/02/2019 07:01 PM UTC
CP002505 - Sports Performance Center & Jack Trice Stadium Improvements North-Site Utilities
The project consists of, but is not limited to, removal and relocation of existing site utilities, and installation of new site utilities. Work includes storm and sanitary sewers, water, electrical, and information technologies.
03/28/2019 07:01 PM UTC