Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1302318-Town Engineering Building-Rooms 0130, 0138 and 0138B Improvement
This project includes, but is not limited to, providing a fixed filtered dust collector serving rooms 0138 and 0138B and a mobile dust collector for room 0130. Work includes installing dust collectors and associated ductwork, compressed air piping, power wiring, and other related accessories.
| 02/17/2026 08:01 PM UTC |
|
CP1295402-Surplus Facility-Parking Lot Improvement
This project includes, but is not limited to, asphalt milling, asphalt patching, grading, installation of storm sewer, subgrade preparation, PCC paving, HMA paving, sidewalk replacement, erosion control, pavement markings and surface restoration.
| 02/19/2026 08:01 PM UTC |
|
CP1280283-Parking Lots 2026-Pavement Preservation-Concrete Patching
This project will remove and replace concrete pavement in Parking Lot 2 and the ground level parking around the East Campus Parking Deck. Work includes, but is not limited to, removal existing PCC and HMA pavement, storm sewer, parking lot lighting, PCC pavement, PCC sidewalks, pavement markings, finish grading and traffic control.
Repairs to the East Campus Parking Deck structure; concrete patching of the lower entrance into the parking deck and Parking Lot 2. Storm sewer structures and lighting will also be evaluated and addressed as needed.
| 02/24/2026 08:01 PM UTC |
|
CP1271061-College of Design-Roof Replacement-Sections A, B, C, D, G, J and I
This project will reseal the barrel vault roof and replace roof sections A, B, C, D, G, J and I at the College of Design. This project includes, but is not limited to, replacement of the roof with a system designed for a minimum life expectancy of 30 years; roof insulation to meet current energy codes; roof access and safety improvements as needed to meet current university standards; tuckpointing, caulking of all features, roof curbs and parapet walls above the roofline to prevent water infiltration; removal and replacement of all sealant on the barrel vault roof. Abatement will be completed as necessary.
| 02/26/2026 08:01 PM UTC |
|
CP1280283-Parking Lots 2026-Pavement Preservation-East Campus Parking Deck Repairs
This project will complete repairs and maintenance on the East Campus Parking Deck. Work includes, but is not limited to concrete repair, membrane removal and application, sealant replacement, expansion joint replacement, guard rail repairs, pavement markings, painting, stair repairs and other associated improvements.
| 03/10/2026 07:01 PM UTC |
|
CP1288490-Hilton Coliseum-South Walkway-Replacement
This project will remove the south bridge and replace with new cast-in-place concrete stairs and accessible ramp. The scope of work includes, but is not limited to, demolition of existing bridge structure; new cast-in-place concrete stairs and ramp; handrails; and site lighting.
| 03/12/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002536 - Science Hall 2-Rooms 0220, 0224 and 0228 Remodel
The remodel will convert one wet lab, a teaching prep room, and a small classroom into one larger multi-purpose room. The work will include, but is not limited to, demolishing dividing walls and modifying the mechanical and electrical systems as required; installing new acoustical lay-in ceiling grid and tile, light fixtures, carpet, whiteboards, and technology.
| 11/15/2018 08:01 PM UTC |
|
CP002519 - Institutional Roads 2019-University Boulevard and Wallace Road Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards at the intersection of University Boulevard and Wallace Road on the Iowa State University campus. Scope of work includes new signal poles, heads, controllers, count down timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing and ADA compliant crosswalk controls.
| 11/08/2018 08:01 PM UTC |
|
CP002529 - Gilman Hall-Rooms 2659, 2701, and 2705 Remodel
The project consists of, but is not limited to, remodeling existing laboratories into office space.
| 11/08/2018 08:01 PM UTC |
|
CP002488 - Birch-Welch-Roberts-Residence Halls-Window Replacement
This project consist of, but is not limited to, the installation of new aluminum windows throughout Birch, Welch, and Roberts Residence Halls to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
| 11/01/2018 07:01 PM UTC |
|
CP002511 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 3
The project consists of, but is not limited to, the removal and replacement of fifty-five (55) fan coil units and accessories. Complete installation per each unit(s) in a single room to be completed in three (3) work days. Work involves installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
| 10/23/2018 07:01 PM UTC |
|
CP002411 - Curtiss Hall-Second Floor Renovation
The Project consists of the alteration of public hallways and office areas on second floor of Curtiss Hall, including the addition of a single use restroom, lactation room, and custodian’s closet.
| 09/27/2018 07:01 PM UTC |
|
CP002225 - Student Innovation Center-Issuance 5-Food Service Rebid
The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes food service equipment for a café and demonstration kitchen.
| 09/18/2018 07:01 PM UTC |
|
CP002532 - Veterinary Medical Research Institute-Buildings 1-6 Condensate Returns Replacement
The project consists of, but is not limited to, installation of a new low-pressure condensate return system between buildings 1 through 6 at Veterinary Medical Research Institute (VMRI). Work includes abandonment or removal or existing condensate lines, installation of new condensate return piping between buildings, connection of new piping to existing service inside each building, and removal and replacement of concrete sidewalk as needed for installation.
| 09/13/2018 07:01 PM UTC |
|
CP002423 - Utilities-Power Plant-Fire Alarm System Improvements
The project consists of, but is not limited to, furnish and install a new Addressable Fire Alarm System throughout the Power Plant including, misc. cutting and patching, patch painting, removal of existing fire alarm system, new fire alarm control panel, new master annunciators, new automatic detection devices, new audio/visual signals, new connections to existing wet-pipe deluge systems, wiring, conduit and other related electrical work.
| 08/30/2018 07:01 PM UTC |
|
CP002528-BioCentury Research Farm - HST Building Roof Replacement & Interior Remodel-Interior Remodel
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include spray foam insulation, steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
| 08/28/2018 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.