General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1295938-Parks Library-West Exterior Cornice Repair
This project will address the west exterior cornice of Parks Library to prevent further concrete deterioration by repairing the damaged concrete, adding metal flashing, and repointing masonry wall joints.
09/15/2026 07:01 PM UTC
CP1302295-Gilman Hall-Room 1402 Remodel
This project will remodel the existing Chemistry Stores Warehouse in Gilman Hall. This will include demolition of existing cabinets and counters, painting, flooring, lighting, ceiling, moving walls, and constructing two new office spaces.
10/01/2026 07:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP002589 - Union Drive Community Center-Union Drive Marketplace Renovation
The project consists of, but is not limited to, interior renovations of the mezzanine dining space and a conference room at the Union Drive Community Center Building.
06/18/2019 07:01 PM UTC
CP002533 - Meats Laboratory-Roof Replacement-Sections A-I
The project consists of, but is not limited to, tear-off of approximately 29,220 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low-slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90-mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping, and vent piping.
06/13/2019 07:01 PM UTC
CP002510 - Heady Hall-Electrical Panel and Utility Safety Improvements-Phase 1
The project consists of, but is not limited to, furnishing all materials, labor, tools, expendable equipment, utility and transportation services, and all incidental items required for scope of work.
06/13/2019 07:01 PM UTC
CP002565 - Institutional Roads 2019-Pavement Preservation
The project consists of, but is not limited to, removal and replacement of PCC pavement, curb & gutter, storm sewer piping, storm intake, sidewalks and accessible ramps.
06/13/2019 07:01 PM UTC
CP002556 - Johnny Majors Practice Field-Expansion
The project consists of, but is not limited to, the expansion of Johnny Majors Practice Field 35 feet to the east. This requires stripping the top organics from the existing field, removing the existing top 3” of sand and relocating to the east to create a new 10” sand profile. Scope also includes demolition of the existing east chain-link fence and installing new fence; grading from the new field edge to the new parkway; modifications to the existing irrigation system; and installation of subdrain.
06/06/2019 07:01 PM UTC
CP002567-Molecular Biology Building-Common Area Improvements
The project consists of, but is not limited to, cleaning, painting, carpeting, refinishing wood benches, masonry block and tile repair, and lighting upgrades.
05/30/2019 07:01 PM UTC
CP002571 - Lied Recreation Athletic Facility-Gasket Replacement
The project includes, but is not limited to, deepening grooves in the existing hydronic piping that is outside of tolerance limits and replacing existing couplings, valves, and flanges.
05/14/2019 07:01 PM UTC
CP002559 - Carver Hall-Rooms 0129, 0131, 0150, 0171, and 0173 Remodel
The project consists of, but is not limited to, remodeling existing classroom and office space into new office and interview space.
04/25/2019 07:01 PM UTC
CP002581 - Utilities-Maple Steam Vault-Expansion
The project consists of, but is not limited to, expanding the structure of existing vault located west of Maple Residence Hall, rerouting steam and condensate lines, installation of new vault lighting, and installation of sump pump.
04/25/2019 07:01 PM UTC
CP002504 - Beyer Hall-Room 1451 Remodel
The project consists of, but is not limited to, work associated with creating two new offices; walls, doors, carpet tile and epoxy flooring, and new ceiling tile. Mechanical work includes new Air Handler, ductwork, and diffusers. Electrical includes new light fixtures, receptacles, and data jacks.
04/23/2019 07:01 PM UTC
321 - 330 of 414 Solicitations
1 2 29 30 31 33 35 36 37 41 42