General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1044575-Lloyd Veterinary Medical Center-Pet Cancer Clinic-Remodel and Addition
This project is an addition and renovation to the existing LLoyd Veterinary Medical Center to develop a Comparative Oncology Center. The new pet cancer clinic includes new exams rooms, animal day wards, clinical procedure and support rooms, office spaces,and client waiting areas.
01/20/2026 08:01 PM UTC
CP1278052-State Avenue Warehouse-Roof Replacement
The scope of work includes, but is not limited to, removing existing EPDM roofing and insulation, removing two ventilators, and infilling open areas with roof panels. Install new insulation and EPDM roofing, as well as new flashing at vents and piping. Rework and install a new flashing tie-in to the existing west metal roof.
01/27/2026 08:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP002225 - Student Innovation Center-Issuance 5-Food Service Rebid
The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes food service equipment for a café and demonstration kitchen.
09/18/2018 07:01 PM UTC
CP002532 - Veterinary Medical Research Institute-Buildings 1-6 Condensate Returns Replacement
The project consists of, but is not limited to, installation of a new low-pressure condensate return system between buildings 1 through 6 at Veterinary Medical Research Institute (VMRI). Work includes abandonment or removal or existing condensate lines, installation of new condensate return piping between buildings, connection of new piping to existing service inside each building, and removal and replacement of concrete sidewalk as needed for installation.
09/13/2018 07:01 PM UTC
CP002423 - Utilities-Power Plant-Fire Alarm System Improvements
The project consists of, but is not limited to, furnish and install a new Addressable Fire Alarm System throughout the Power Plant including, misc. cutting and patching, patch painting, removal of existing fire alarm system, new fire alarm control panel, new master annunciators, new automatic detection devices, new audio/visual signals, new connections to existing wet-pipe deluge systems, wiring, conduit and other related electrical work.
08/30/2018 07:01 PM UTC
CP002528-BioCentury Research Farm - HST Building Roof Replacement & Interior Remodel-Interior Remodel
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include spray foam insulation, steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
08/28/2018 07:01 PM UTC
CP002491 - Bessey Hall-Roof Replacement-Sections A-C, F and H
The project consists of, but is not limited to, the removal and replacement of roof sections A, B, C, F, & H due to the continual and ongoing maintenance, re-engineering Sections A,B,C,F & H to alleviate roof leak issues, replacement of swamp cooler curb and all roofing material down to the roof deck, removal of all abandoned roof equipment, repair sections properly prior to roof replacement, and replacement of all flashings.
08/23/2018 07:01 PM UTC
CP002501-Communications Building-Second Floor Remodel-Iowa Public Radio
The project consists of, but is not limited to, remodeling existing offices and conference space, ceiling replacement, flooring installation, painting, lighting, doors and associated hardware, lighting upgrades, millwork, mechanical, electrical, plumbing, and access controls.
08/07/2018 07:01 PM UTC
CP002528-BioCentury Research Farm - HST Building Roof Replacement
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to install a new structural retrofit roof sub-framing system, insulation, and new metal standing seam roof over an existing building roof.
07/19/2018 07:01 PM UTC
CP002485 - Department of Residence-Helser Residence Hall-Elevator Improvements
The project consists of, but is not limited to, modernization of the current freight elevator into a passenger elevator, construction of new elevator penthouse and mechanical room, and associated structural alterations for penetration of roof deck for new construction.
06/07/2018 07:01 PM UTC
CP002477 - Human Nutritional Sciences Building-AHU 1-Humidification System Replacement
The project consists of, but is not limited to, replacing the existing chilled water coil, replacing existing corroded ductwork, installing new humidification unit, and new electrical wiring for controls.
05/31/2018 07:01 PM UTC
CP002457 - Hub-Retail Dining Services Renovation
The project consists of, but is not limited to, renovation of the existing Hub’s interior. Renovation will include seating/dining area, back-of-house space, grille venue and coffee venue. The coffee venue will be relocated and separated from the grille.
05/10/2018 07:01 PM UTC
321 - 330 of 379 Solicitations
1 2 29 30 31 33 35 36 37 38