Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1271054-Ringgenberg Farm-Storm Water Improvements
The scope of work includes, but is not limited to, the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
| 12/16/2025 08:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002532 - Veterinary Medical Research Institute-Buildings 1-6 Condensate Returns Replacement
The project consists of, but is not limited to, installation of a new low-pressure condensate return system between buildings 1 through 6 at Veterinary Medical Research Institute (VMRI). Work includes abandonment or removal or existing condensate lines, installation of new condensate return piping between buildings, connection of new piping to existing service inside each building, and removal and replacement of concrete sidewalk as needed for installation.
| 09/13/2018 07:01 PM UTC |
|
CP002423 - Utilities-Power Plant-Fire Alarm System Improvements
The project consists of, but is not limited to, furnish and install a new Addressable Fire Alarm System throughout the Power Plant including, misc. cutting and patching, patch painting, removal of existing fire alarm system, new fire alarm control panel, new master annunciators, new automatic detection devices, new audio/visual signals, new connections to existing wet-pipe deluge systems, wiring, conduit and other related electrical work.
| 08/30/2018 07:01 PM UTC |
|
CP002528-BioCentury Research Farm - HST Building Roof Replacement & Interior Remodel-Interior Remodel
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include spray foam insulation, steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
| 08/28/2018 07:01 PM UTC |
|
CP002491 - Bessey Hall-Roof Replacement-Sections A-C, F and H
The project consists of, but is not limited to, the removal and replacement of roof sections A, B, C, F, & H due to the continual and ongoing maintenance, re-engineering Sections A,B,C,F & H to alleviate roof leak issues, replacement of swamp cooler curb and all roofing material down to the roof deck, removal of all abandoned roof equipment, repair sections properly prior to roof replacement, and replacement of all flashings.
| 08/23/2018 07:01 PM UTC |
|
CP002501-Communications Building-Second Floor Remodel-Iowa Public Radio
The project consists of, but is not limited to, remodeling existing offices and conference space, ceiling replacement, flooring installation, painting, lighting, doors and associated hardware, lighting upgrades, millwork, mechanical, electrical, plumbing, and access controls.
| 08/07/2018 07:01 PM UTC |
|
CP002528-BioCentury Research Farm - HST Building Roof Replacement
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to install a new structural retrofit roof sub-framing system, insulation, and new metal standing seam roof over an existing building roof.
| 07/19/2018 07:01 PM UTC |
|
CP002485 - Department of Residence-Helser Residence Hall-Elevator Improvements
The project consists of, but is not limited to, modernization of the current freight elevator into a passenger elevator, construction of new elevator penthouse and mechanical room, and associated structural alterations for penetration of roof deck for new construction.
| 06/07/2018 07:01 PM UTC |
|
CP002477 - Human Nutritional Sciences Building-AHU 1-Humidification System Replacement
The project consists of, but is not limited to, replacing the existing chilled water coil, replacing existing corroded ductwork, installing new humidification unit, and new electrical wiring for controls.
| 05/31/2018 07:01 PM UTC |
|
CP002457 - Hub-Retail Dining Services Renovation
The project consists of, but is not limited to, renovation of the existing Hub’s interior. Renovation will include seating/dining area, back-of-house space, grille venue and coffee venue. The coffee venue will be relocated and separated from the grille.
| 05/10/2018 07:01 PM UTC |
|
CP002387-Utilities-Lied Recreation Athletic Facility-Steam Supply Replacement-Gasket Replacement
The project consists of, but is not limited to, replacement of the existing coupling and gaskets that are a part of the joint and fitting assemblies on all existing grooved piping that is part of the heating water system.
| 05/08/2018 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.