Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1323911-Power Plant-Mechanical Room 0125 Remodel
This project will repurpose the containment area of the Water Treatment Equipment room in the Power Plant into a work and coordination space for the plumbers and pipefitters. Work includes building interior walls and roof, moving existing plumbing and electrical, installing a new sink, outlets, lights, casework, and a ventilator.
| 10/22/2026 07:01 PM UTC |
|
CP1248808-Lake LaVerne-Improvements-Bridge and Amphitheater
This project includes, but is not limited to, a 10 foot wide PCC pedestrian, outdoor amphitheater limestone block seating, lakebed grading, shoreline grading and restoration, PCC sidewalks and site lighting.
| 10/29/2026 07:01 PM UTC |
|
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
| 11/03/2026 08:01 PM UTC |
|
CP1321285-Reiman Gardens Storage Building and Maintenance Building Addition
The scope of work includes, but is not limited to, a 640 SF addition to the existing maintenance building and improvements to the surrounding area, such as new site walls, fencing, paving, and re-striping of the parking lot. Also included is the construction of a new 2,300 SF storage building to store miscellaneous event and horticulture equipment. This storage facility will have general electrical service and lighting; it will be tempered, but not fully conditioned. Expansion of paving will be added to the west of the new storage facility to improve site access and circulation.
| 11/05/2026 08:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes retaining wall footing and masonry replacement, site lighting, concrete stair and sidewalk replacement, patio, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 11/12/2026 08:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002505 - Town Engineering Building-Roof Replacement and Strobic Extension
(NOTE: CORRECT CP NUMBER IS CP002550)
The project consists of, but is not limited to, tear-off of approximately 45,660 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90 mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping and laboratory vent piping. Mechanical work includes extension of the existing strobic exhaust duct, installation of piping, and final connections to existing laboratory hoods. Removal of any roof mounted equipment no longer necessary after the strobic connection is complete.
| 07/09/2019 07:01 PM UTC |
|
CP002553 - Utilities-Switchgear Vault 39 Replacement
The project consists of, but is not limited to, construction of one underground cast-in-place electrical vault, repair walls of an existing underground electrical vault, installation of new electrical medium voltage cable and conduit, supporting and working around energized medium voltage cable and equipment, and installation of 600V conduit, wire, and ground boxes.
| 06/25/2019 07:01 PM UTC |
|
CP002576 - College of Design-Common Area Enhancements
The project consists of, but is not limited to, the patching and painting of the five-story atrium and central stair of the College of Design, as well as cleaning of the atrium side of the faculty windows located on the south side of the atrium.
| 06/25/2019 07:01 PM UTC |
|
CP002505 - Sports Performance Center and Jack Trice Stadium Improvements North-Sports Performance Center
The project consists of, but is not limited to, new construction for a 4-story plus basement, 98,626 sf Sports Performance Center. New construction for a single-story plus mezzanine, 13,832 sf West Bergstrom addition. Remodeling to the existing Bergstrom Facility, 18,827 sf with associated utility, building systems, site, and landscape work. Work includes concrete foundations, drilled piers, steel structure, precast concrete, metal wall panels, glazed curtain walls, PVC roofing, metal roofing panels, CMU, metal stud framing, interior glazing, interior finishes, lockers, kitchen equipment, mechanical, and electrical systems.
| 06/20/2019 07:01 PM UTC |
|
CP002589 - Union Drive Community Center-Union Drive Marketplace Renovation
The project consists of, but is not limited to, interior renovations of the mezzanine dining space and a conference room at the Union Drive Community Center Building.
| 06/18/2019 07:01 PM UTC |
|
CP002533 - Meats Laboratory-Roof Replacement-Sections A-I
The project consists of, but is not limited to, tear-off of approximately 29,220 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low-slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90-mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping, and vent piping.
| 06/13/2019 07:01 PM UTC |
|
CP002510 - Heady Hall-Electrical Panel and Utility Safety Improvements-Phase 1
The project consists of, but is not limited to, furnishing all materials, labor, tools, expendable equipment, utility and transportation services, and all incidental items required for scope of work.
| 06/13/2019 07:01 PM UTC |
|
CP002565 - Institutional Roads 2019-Pavement Preservation
The project consists of, but is not limited to, removal and replacement of PCC pavement, curb & gutter, storm sewer piping, storm intake, sidewalks and accessible ramps.
| 06/13/2019 07:01 PM UTC |
|
CP002556 - Johnny Majors Practice Field-Expansion
The project consists of, but is not limited to, the expansion of Johnny Majors Practice Field 35 feet to the east. This requires stripping the top organics from the existing field, removing the existing top 3” of sand and relocating to the east to create a new 10” sand profile. Scope also includes demolition of the existing east chain-link fence and installing new fence; grading from the new field edge to the new parkway; modifications to the existing irrigation system; and installation of subdrain.
| 06/06/2019 07:01 PM UTC |
|
CP002567-Molecular Biology Building-Common Area Improvements
The project consists of, but is not limited to, cleaning, painting, carpeting, refinishing wood benches, masonry block and tile repair, and lighting upgrades.
| 05/30/2019 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.