CP1295938-Parks Library-West Exterior Cornice Repair
This project will address the west exterior cornice of Parks Library to prevent further concrete deterioration by repairing the damaged concrete, adding metal flashing, and repointing masonry wall joints.
| 09/15/2026 07:01 PM UTC |
|
CP1302295-Gilman Hall-Room 1402 Remodel
This project will remodel the existing Chemistry Stores Warehouse in Gilman Hall. This will include demolition of existing cabinets and counters, painting, flooring, lighting, ceiling, moving walls, and constructing two new office spaces.
| 10/01/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002589 - Union Drive Community Center-Union Drive Marketplace Renovation
The project consists of, but is not limited to, interior renovations of the mezzanine dining space and a conference room at the Union Drive Community Center Building.
| 06/18/2019 07:01 PM UTC |
|
CP002533 - Meats Laboratory-Roof Replacement-Sections A-I
The project consists of, but is not limited to, tear-off of approximately 29,220 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low-slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90-mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping, and vent piping.
| 06/13/2019 07:01 PM UTC |
|
CP002510 - Heady Hall-Electrical Panel and Utility Safety Improvements-Phase 1
The project consists of, but is not limited to, furnishing all materials, labor, tools, expendable equipment, utility and transportation services, and all incidental items required for scope of work.
| 06/13/2019 07:01 PM UTC |
|
CP002565 - Institutional Roads 2019-Pavement Preservation
The project consists of, but is not limited to, removal and replacement of PCC pavement, curb & gutter, storm sewer piping, storm intake, sidewalks and accessible ramps.
| 06/13/2019 07:01 PM UTC |
|
CP002556 - Johnny Majors Practice Field-Expansion
The project consists of, but is not limited to, the expansion of Johnny Majors Practice Field 35 feet to the east. This requires stripping the top organics from the existing field, removing the existing top 3” of sand and relocating to the east to create a new 10” sand profile. Scope also includes demolition of the existing east chain-link fence and installing new fence; grading from the new field edge to the new parkway; modifications to the existing irrigation system; and installation of subdrain.
| 06/06/2019 07:01 PM UTC |
|
CP002567-Molecular Biology Building-Common Area Improvements
The project consists of, but is not limited to, cleaning, painting, carpeting, refinishing wood benches, masonry block and tile repair, and lighting upgrades.
| 05/30/2019 07:01 PM UTC |
|
CP002571 - Lied Recreation Athletic Facility-Gasket Replacement
The project includes, but is not limited to, deepening grooves in the existing hydronic piping that is outside of tolerance limits and replacing existing couplings, valves, and flanges.
| 05/14/2019 07:01 PM UTC |
|
CP002559 - Carver Hall-Rooms 0129, 0131, 0150, 0171, and 0173 Remodel
The project consists of, but is not limited to, remodeling existing classroom and office space into new office and interview space.
| 04/25/2019 07:01 PM UTC |
|
CP002581 - Utilities-Maple Steam Vault-Expansion
The project consists of, but is not limited to, expanding the structure of existing vault located west of Maple Residence Hall, rerouting steam and condensate lines, installation of new vault lighting, and installation of sump pump.
| 04/25/2019 07:01 PM UTC |
|
CP002504 - Beyer Hall-Room 1451 Remodel
The project consists of, but is not limited to, work associated with creating two new offices; walls, doors, carpet tile and epoxy flooring, and new ceiling tile. Mechanical work includes new Air Handler, ductwork, and diffusers. Electrical includes new light fixtures, receptacles, and data jacks.
| 04/23/2019 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.