CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1
This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
| 04/21/2026 07:01 PM UTC |
|
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
| 04/23/2026 07:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 04/28/2026 07:01 PM UTC |
|
CP1303287-Student Services Building-East Wing Ground Floor Remodel
This project will remodel multiple rooms, hallways and stairwells in the East Wing of the Student Services Building. The scope of work includes, but is not limited to, patching and painting; new flooring; new upper and lower cabinets; new furniture, tables, and chairs; new cabinetry; and new carpet and blinds.
| 05/05/2026 07:01 PM UTC |
|
CP1311894-Veterinary Medical Research Institute Animal Holding #40-85kW Generator Replacement
This project will replace the existing 85kW indoor open-frame natural gas generator in VMRI 40 with a similarly sized outdoor natural gas generator with weather and sound-insulated housing. The scope of work includes installing a concrete pad, removing and replacing the generator, and reconfiguring all related electrical connections to meet current codes. Patch and repair the existing hole, and grade and seed.
| 05/05/2026 07:01 PM UTC |
|
CP1289132-Reiman Gardens Conservatory-Boilers-Replacement
This project will remove and replace four existing boilers; increase the size of existing concrete curbs to support new equipment; install a new domestic water heat exchanger and all associated electrical, plumbing, and gas piping to complete the work.
| 05/07/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002564-Parks Library-Common Area Improvements
The project consists of, but is not limited to, relocation of the service desk and renovation of the commons area with new study rooms adjacent to the entry area. Work includes demolition of existing offices and floor finishes, and alterations of mechanical and electrical systems to support the renovation.
| 03/28/2019 07:01 PM UTC |
|
CP002553 - Utilities-Switchgear Vault 39 Replacement
The project consists of, but is not limited to, construction of two underground cast-in-place electrical vaults, demolition of an existing electrical vault, installation of new electrical medium voltage cable, conduit, cable splices, and terminations, supporting and working around energized medium voltage cable and equipment, and installation of 600V conduit, wire, and ground boxes.
| 03/26/2019 07:01 PM UTC |
|
CP002439 - East of University Boulevard-Site Improvements-Recreation Services
The project consists of, but is not limited to, the demolition of existing turf, softball infields, service building, utilities and athletic field accessories. Work in this project includes but is not limited to installation of athletic field turf, irrigation systems, electrical services and distribution, site grading domestic water service and distribution, sidewalks building foundations, masonry construction, roofing and athletic fencing.
| 03/21/2019 07:01 PM UTC |
|
CP002539 - Veterinary Medicine-Restroom and Locker Room Renovation
The project consists of, but is not limited to, demolition of existing and construction of restroom and locker room facilities. Work includes but is not limited to modifications to plumbing, electrical, mechanical systems finishes, toilet partitions, flooring, ceilings and lighting.
| 03/21/2019 07:01 PM UTC |
|
CP002517 - Parking Lots 2019-Pavement Preservation-Asphalt
The project consists of, but is not limited to, the removal of existing PCC and HMA pavement, new HMA pavement with PCC curb and gutter, PCC pavement and sidewalks, storm sewer structures and piping, a bioswale, parking lot and sidewalk lighting, surface and subsurface detention, pavement markings, and finish grading/topsoil.
| 03/14/2019 07:01 PM UTC |
|
CP002517 - Parking Lots 2019-Pavement Preservation-Concrete
The project consists of, but is not limited to, the removal and replacement of the existing PCC parking lot, sidewalk replacement, new storm sewer intake and piping, electrical lighting and conduit, pavement markings, and finish grading/topsoil.
| 03/14/2019 07:01 PM UTC |
|
CP002461-Utilities-Iowa State Center-Steam Supply Replacement
The project consists of, but is not limited to, providing new direct buried steam piping to all buildings at the Iowa State Center. It includes new steam pipe, new condensate pipe, chilled water pipe relocation, connections in mechanical rooms, new underground concrete vaults, paving, and relocating a 480 power line.
| 03/05/2019 08:01 PM UTC |
|
CP002544 - Zaffarano Physics Addition-Roof Replacement-Sections L-M
The project consists of, but is not limited to, complete roof system removal down to structural deck and replacement with new insulation and a fully adhered membrane system.
| 02/21/2019 08:01 PM UTC |
|
CP002516 - Town Engineering Building-Heat and Smoke Detection
The project consists of, but is not limited to, addition of heat and smoke detectors throughout the building. VESDA shall be installed in two-story work areas and one-story areas with large structural pockets. Addressable strobes shall be installed in public areas, and the existing fire alarm control panel shall be relocated.
| 02/07/2019 08:01 PM UTC |
|
CP002464 - Gilman Hall-Electrical Panel Replacement
The project consists of, but is not limited to, the replacement of a portion of Gilman Hall Electrical panels.
| 01/29/2019 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.