Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
| 07/08/2025 07:01 PM UTC |
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
| 07/22/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002387-Utilities-Lied Recreation Athletic Facility-Steam Supply Replacement-Gasket Replacement
The project consists of, but is not limited to, replacement of the existing coupling and gaskets that are a part of the joint and fitting assemblies on all existing grooved piping that is part of the heating water system.
| 05/08/2018 07:01 PM UTC |
CP002055 - Biosciences Facilities-Advanced Teaching & Research Building-Zebra Fish Laboratory
The project consists of, but is not limited to, installation of new drywall partitions, continuation of the roughed in mechanical and electrical services. The installation of the following owner-furnished items: laboratory casework, doors and frames, fan coil units, lighting systems to complete this core support space in the basement of the new Advanced Teaching and Research Building.
| 04/26/2018 07:01 PM UTC |
CP002401 - Armory-Window Replacement-Phase 2
The project consists of, but is not limited to, providing and installing new windows as indicated on construction documents and as required trim and sills.
| 04/12/2018 07:01 PM UTC |
CP002479 - Music-AHU2 Humidification System Replacement
The project consists of, but is not limited to, replacing the existing supply air handling unit including: cooling/dehumidifying coil, heat/reheat coil, blower, and direct-injection humidifier. The project also includes electrical power for new humidifier and new AHU Johnson Controls.
| 04/10/2018 07:01 PM UTC |
CP002458 - Union Drive Community Center-Clyde's Dining Renovation
The project consists of, but is not limited to, renovated seating/dining area, renovated serving stations, renovated back-of-house (BOH) space that includes foodservice kitchen and dry storage, new interior entrances with overhead coiling security grilles from adjacent building spaces, renovated vestibule, of an existing foodservice and dining facility in Union Drive Community Center.
| 03/29/2018 07:01 PM UTC |
CP002418 - Memorial Union-Dining Services Central Space Remodel
The project consists of, but is not limited to, renovation of the central food court space located on the first floor of the Memorial Union. Scope includes a new food service salad bar, counters, POS stations and food service equipment. Finish upgrades to include new flooring tile, wall finishes, and an acoustic ceiling tile cloud. A new security grille will be installed at the main entry. The project includes limited scope within each of the five venues serving the food court. This includes replacement of existing acoustic ceiling tile and grid, minor painting, and patching of fiber reinforced plastic paneling. Scope of work also includes mechanical and electrical construction in adjacent areas to modify services to serve the space. Some services will be routed through excavated tunnels below.
| 03/27/2018 07:01 PM UTC |
CP002446 - Zaffarano Physics Addition-Exterior Repairs
The project consists of, but is not limited to:
1. Cleaning of existing precast and masonry.
2. Removal of all existing sealant and backer rods.
3. Patch precast concrete panels.
4. Masonry tuckpointing.
5. Install new sealant and backer systems.
6. Repair soffits.
| 03/22/2018 07:01 PM UTC |
CP002475 - Utilities-South Campus-No. 1 Feeder Replacement
The project consists of, but is not limited to, installing new 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations on above ground switchgear and transformer. Perform hi-pot cable tests on installed cable, splices, and terminations. De-energize and remove existing abandoned cable after new cable is installed.
| 03/15/2018 07:01 PM UTC |
CP002422 - Hilton Coliseum Parking Expansion
The project consists of, but is not limited to, removal of existing HMA and PCC pavement, new HMA pavement with PCC curb and gutter and reclaimed HMA base, PCC sidewalks, storm sewer structures and piping, bioswale, parking lot and sidewalk lighting as well as upgrades to the lighting distribution system, telecom panel and raceway for TV truck connections on site, wayfinding and parking stall signage, gate installation, pavement markings and finish grading/topsoil.
| 03/13/2018 07:01 PM UTC |
CP002404 - Parking Lot 96-Expansion
The project consists of, but is not limited to, sidewalk removal, street lights removal/replacement, pedestrian lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, electric vault lid replacement, storm sewer intakes, storm sewer piping, PCC sidewalk, PCC curb and gutter, HMA parking lot paving, traffic control and other associated work for a parking lot expansion project on the west side of the Veterinary Medicine campus at Iowa State University in Ames, Iowa.
| 03/08/2018 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.