Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WC0227 Milwaukee County Courthouse Elevator Modernization
The elevators in the Milwaukee County Courthouse need to be modernized. This project addresses the modernization of 13 elevators.
The Mandatory Pre-Bid Meeting is on Monday, 02/24/25 from 10:00am - 12:00pm at 901 N 9th St, Milwaukee, WI 53233 Room G1. Pre-Registration is Required. for this meeting. Please contact Martina Foss Ashworth at mfoss@millerdunwiddie.com to register.
Project Contact: Martina Foss Ashworth
Contact Email: mfoss@millerdunwiddie.com
| 04/10/2025 07:00 PM UTC |
WA0413 MKE Rehabilitate Bullseye
This project is for the rehabilitation of pavements and shoulders
inside hold lines of Runways 1L-19R and 7RL-25L at Milwaukee
General Mitchell International Airport (MKE).
Project Completion: The number of consecutive calendar days the contractor has available to substantially complete the project, excluding punch list items is 165 Calendar Days. The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates close in proximity.
Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM
Pre-Bid meeting will be done virtually via Teams. To acquire the
meeting link to the pre bid meeting, please contact Kwame
Amegashitsi at kamegashitsi@mitchellairport.com prior to
Monday, March 24, 2025, at 5:00PM. Later requests are not
guaranteed a timely response.
| 04/16/2025 07:00 PM UTC |
WA0400 MKE North Ramp Rehabilitation
This project is for the rehabilitation of the North Apron at
Milwaukee Mitchell International Airport (MKE). This project
involves an asphalt mill & overlay, storm sewer structure
replacement and pavement marking.
Additive Alternate: WA0417 MKE Rehabilitate Taxiway F
This project is for the rehabilitation of Taxiway F between
Runways 1L/19R and 7L/25R at Milwaukee Mitchell International
Airport (MKE).
Project Completion: If MKE North Ramp Rehabilitation is awarded, the contractor shall have a total of 137 calendar days to substantially complete the project, excluding punch list. If additive alternative, MKE Rehabilitate Taxiway F is awarded, no additional calendar days will be awarded to the contract:
Base Bid Only = 137 Calendar Days
Base Bid + Alternate = 137 Calendar Days
The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates in close proximity.
Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM
Pre-Bid meeting will be done virtually via Teams. To acquire the
meeting link to the pre bid meeting, please contact Kwame
Amegashitsi at kamegashitsi@mitchellairport.com prior to
Monday, March 24, 2025, at 5:00PM. Later requests are not
guaranteed a timely response.
| 04/16/2025 07:00 PM UTC |
Number | Deadline |
---|---|
WY012305: Zablocki Park Golf Course Synthetic Tee & Green Project
This project includes installing new synthetic greens at Zablocki golf course. The new synthetic greens once installed will significantly reduce the operation and maintenance costs at Zablocki golf course. Pre-Bid Meeting April 6th at 11am.
| 04/19/2023 07:00 PM UTC |
V043-21011 Oakwood Lift Station Upgrades
Upgrades to Oakwood Lift Station as well as installation of new force main.
Optional Pre-Bid Meeting: Friday March 24th, 2023 at 9am 3600 W Oakwood Rd, Franklin, WI 53132
| 04/07/2023 07:00 PM UTC |
T111-20098 Concrete Yard Replacement (Milw Cnty Transit System)
Work of the Project includes removing existing concrete pavement, re-grading, and providing new concrete pavement, concrete curb and gutter, concrete sidewalk, storm sewer, and chain link fence replacement as indicated in the project Bid documents.
Substantial Completion Date: October 27, 2023
| 04/05/2023 07:00 PM UTC |
P688-20143 McKinley Marina Parking Reconstruction Ph 2
Work consists of removing existing asphalt surface and concrete curb and gutter, pulverize existing pavement, regrade, and provide new aggregate base, new concrete curb and gutter, concrete sidewalk and asphalt pavement as indicated in the project Bid documents. Additional new work consists of storm drainage green infrastructure, storm sewer, sanitary sewer, watermain, LED Lighting, boat launch improvements, storage building, fish cleaning structure, fish cleaning station, underground fuel tanks, fuel systems, decorative fencing, and site furnishings.
| 03/22/2023 07:00 PM UTC |
WJ0112 HOC Administration Building Roof Replacement
Project consists of replacing existing HOC- Administration Building Roof Replacement as indicated on Contract bidding documents.
Project Funded: Local
One MANDATORY Pre-bid meeting will take place on March 15, 2023, at 1:00 P.M., meet in the lobby at the HOC- Administration Building located at 8885 South 68th Franklin, WI 53132
FAILURE TO ATTEND THE MANDATORY PRE-BID CONFERENCE WILL RESULT IN BID BEING REJECTED AS NON-RESPONSIVE.
BIDDERS SHALL SUBMIT SPECIAL QUALIFICATION DOCUMENTATION WITH BID. SEE DOCUMENT 002100 - INSTRUCTIONS TO BIDDERS, ARTICLE 16.
| 03/22/2023 07:00 PM UTC |
WY045606 DHHS New Administration Building
CMaR Milwaukee County Department of Health & Human Services New Administration Building
| 03/16/2023 07:00 PM UTC |
WP0706 Milwaukee South Shore Breakwater North Breakwater Section-Emergency Repair
Work consists of locate and demarcate spot repair areas, to relocate existing armor stones as needed to provide suitable base for new armor stones and to supply new armor stone and place on designated spot repair areas to specified elevations.
On company letterhead, signed by an authorized representative of the Company, submit the name of the quarry being used.
| 03/15/2023 07:00 PM UTC |
Sheriff Department Training Academy Roof Replacement (O016901)
Project consists of replacing existing Sheriff Department Training Academy Roof as indicated on Contract bidding documents.
Project Completion: Work of Contract shall be Substantially Complete within Eight months.
Project Funded: Local
One MANDATORY Pre-bid meeting will take place on March 8, 2023, at 1:00 P.M., meet in the lobby at the Sheriff Department Training Academy located at 9225 South 68th Street, Milwaukee WI 53132.
FAILURE TO ATTEND THE MANDATORY PRE-BID CONFERENCE WILL RESULT IN BID BEING REJECTED AS NON-RESPONSIVE.
BIDDERS SHALL SUBMIT SPECIAL QUALIFICATION DOCUMENTATION WITH BID. SEE DOCUMENT 002100 - INSTRUCTIONS TO BIDDERS, ARTICLE 16.
| 03/15/2023 07:00 PM UTC |
MKE North Airfield TXY Rehabilitation & Removal (A0399, A0416, A0397, A0395, A0423, A0424)
This project includes pavement rehabilitation or pavement removals on multiple taxiways at Milwaukee County’s General Mitchell International Airport (MKE). Included in this contract is substantial grading, construction of underdrains, asphalt, landscaping, pavement marking, and airfield electrical changes.
Project Completion:
If the Base Bid and all five (5) alternatives are awarded, the contractor shall have a total of 153 consecutive calendar days to substantially complete the project, excluding punchlist. If any or all additive alternatives are not awarded, the total contract time shall be as follows:
Base Bid Only = 30 Calendar Days
Base Bid + Alternative 1 = 42 Calendar Days
Base Bid + Alternative 1 + Alternative 2 = 84 Calendar Days
Base Bid + Alternative 1 + Alternative 2 + Alternative 3 = 135 Calendar Days
Base Bid + Alternative 1 + Alternative 2 + Alternative 3 + Alternative 4 = 153 Calendar Days
No additional calendar days will be awarded to the contract if additive alternate 5 is awarded.
Pre-Bid Meeting: Thursday, February 23, 2023, at 10:00 AM, held in the Sijan Conference Room, in the GMIA Terminal (Located before security in hallway behind Museum/USO), 5300 South Howell Avenue, Milwaukee, Wisconsin.
| 03/09/2023 08:00 PM UTC |
WH0111012: W Forest Home Avenue (CTH OO) Hi View Dr to W Speedway Dr Reconditioning
The work under this contract consists of removing asphaltic surface milling, removing concrete surface partial depth, grading, base aggregate dense, rubblizing, HMA pavement, concrete curb & gutter, guardrail, erosion control, permanent signing, pavement marking, traffic control, storm sewer construction including structures adjustment and reconstruction, structure concrete surface repair and sealing joints, traffic signals, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. This project is part of the Local Roads Improvement Program (LRIP).
| 02/08/2023 08:00 PM UTC |