Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WC0227 Milwaukee County Courthouse Elevator Modernization
The elevators in the Milwaukee County Courthouse need to be modernized. This project addresses the modernization of 13 elevators.
The Mandatory Pre-Bid Meeting is on Monday, 02/24/25 from 10:00am - 12:00pm at 901 N 9th St, Milwaukee, WI 53233 Room G1. Pre-Registration is Required. for this meeting. Please contact Martina Foss Ashworth at mfoss@millerdunwiddie.com to register.
Project Contact: Martina Foss Ashworth
Contact Email: mfoss@millerdunwiddie.com
| 04/10/2025 07:00 PM UTC |
WA0413 MKE Rehabilitate Bullseye
This project is for the rehabilitation of pavements and shoulders
inside hold lines of Runways 1L-19R and 7RL-25L at Milwaukee
General Mitchell International Airport (MKE).
Project Completion: The number of consecutive calendar days the contractor has available to substantially complete the project, excluding punch list items is 165 Calendar Days. The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates close in proximity.
Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM
Pre-Bid meeting will be done virtually via Teams. To acquire the
meeting link to the pre bid meeting, please contact Kwame
Amegashitsi at kamegashitsi@mitchellairport.com prior to
Monday, March 24, 2025, at 5:00PM. Later requests are not
guaranteed a timely response.
| 04/16/2025 07:00 PM UTC |
WA0400 MKE North Ramp Rehabilitation
This project is for the rehabilitation of the North Apron at
Milwaukee Mitchell International Airport (MKE). This project
involves an asphalt mill & overlay, storm sewer structure
replacement and pavement marking.
Additive Alternate: WA0417 MKE Rehabilitate Taxiway F
This project is for the rehabilitation of Taxiway F between
Runways 1L/19R and 7L/25R at Milwaukee Mitchell International
Airport (MKE).
Project Completion: If MKE North Ramp Rehabilitation is awarded, the contractor shall have a total of 137 calendar days to substantially complete the project, excluding punch list. If additive alternative, MKE Rehabilitate Taxiway F is awarded, no additional calendar days will be awarded to the contract:
Base Bid Only = 137 Calendar Days
Base Bid + Alternate = 137 Calendar Days
The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates in close proximity.
Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM
Pre-Bid meeting will be done virtually via Teams. To acquire the
meeting link to the pre bid meeting, please contact Kwame
Amegashitsi at kamegashitsi@mitchellairport.com prior to
Monday, March 24, 2025, at 5:00PM. Later requests are not
guaranteed a timely response.
| 04/16/2025 07:00 PM UTC |
Number | Deadline |
---|---|
O189-20161 Countywide ADA Repairs - Phase 3, Courthouse
The project includes remodeling one men’s and one women’s restroom on one floor of the courthouse to create accessible restrooms on a floor that currently offers no accessible restrooms. This project will focus on renovating one existing men’s restroom and one existing women’s restroom on the Ground Floor of the Courthouse. An additional area shall be renovated on the Ground Floor of the Courthouse, adjacent to the women’s restroom, creating a family restroom. This family, or universal, restroom is to be a unisex restroom that is handicap accessible i.e., a separate facility which accommodates changing a baby, breastfeeding, and parents attending children of the opposite sex. Within this family restroom an adult size changing table shall be located. The adult changing table can raise and lower as needed by the user and/or caregiver.
| 02/09/2022 08:00 PM UTC |
T141-20169 KK Bus Wash HVAC Replacement
Remove air Curtains, MUA unit and exhaust fans and install a new gas fired MUA unit, 2 new exhaust fans along with 2 new toilet exhaust fans
| 12/15/2021 08:00 PM UTC |
V054-21204 -01 Sanitary Sewer Rehabilitation at Multiple Locations
Contract 1: Clean & CCTV Sewer Lines
Work consists of furnishing all labor, materials, supplies, equipment, tools and other services necessary for providing the rehabilitation of sanitary sewer manholes and pipes, televising and cleaning of pipes, and abandonment of manholes and pipes as specified. Contractor shall perform this Work at multiple Milwaukee County locations including the County Grounds, Zoo, Parks, Airport, and House of Corrections. All Work shall be in accordance with Contract Drawings and Specifications.
Pre-Bid Meeting: December 1ST, 2021 at 10:00am, meet at Milwaukee County, Architecture, Engineering, and Environmental Services Office, 633 West Wisconsin Avenue, Suite 1000, Milwaukee, WI 53203. Meetings will be conducted in small groups. Masks, Health Screenings, and Social Distancing are required.
| 12/08/2021 08:00 PM UTC |
V054-21204 -02 Sanitary Sewer Rehabilitation at Multiple Locations
Contract 2: Sewer Manholes & Pipe Rehabilitation
Work consists of furnishing all labor, materials, supplies, equipment, tools and other services necessary for providing the rehabilitation of sanitary sewer manholes and pipes, televising and cleaning of pipes, and abandonment of manholes and pipes as specified. Contractor shall perform this Work at multiple Milwaukee County locations including the County Grounds, Zoo, Parks, Airport, and House of Corrections. All Work shall be in accordance with Contract Drawings and Specifications.
Pre-Bid Meeting: December 1ST, 2021 at 10:00am, meet at Milwaukee County, Architecture, Engineering, and Environmental Services Office, 633 West Wisconsin Avenue, Suite 1000, Milwaukee, WI 53203. Meetings will be conducted in small groups. Masks, Health Screenings, and Social Distancing are required.
| 12/08/2021 08:00 PM UTC |
9420-20580 - Little Menomonee River Parkway Habitat Restoration: Sections 4 and 5
Habitat restoration within the Little Menomonee River Parkway including reforestation, invasive species removal, grassland restoration and management, forest stand improvement, wetland restoration and sedge meadow restoration.
Project is funded by a Great Lakes Restoration Initiative Grant sub-granted through the Department of Natural Resources to Milwaukee County Parks.
Pre-Bid Meeting: One Pre-bid meeting will take place on October 13, 2021 at 1:00PM. Meeting will be held virtually via Microsoft Teams. Email Project Manager, Natalie Dutack at
Natalie.Dutack@milwaukeecountywi.govfor a link to the meeting.
CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WHEN NOTIFIED AS APPARENT LOW BIDDER. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS.
CONTRACTOR SHALL PROVIDE QUALITIFCATIONS AT TIME OF BID. SEE REFERENCE DOCUMENTS 00 20 00 SECTION 21
| 10/27/2021 07:00 PM UTC |
P697-19612 - Oak Leaf Trail Relocation Site #716
Project Funded: Federally Funded with Transportation Alternatives Program.
Contract 1: Shared-Use Path Construction
Work consists of reconstructing and relocating two segments of Milwaukee County’s Oak Leaf Trail located within the Little Menomonee Parkway, specifically on the west side of N 91st St between W. Good Hope Rd and W. Bradley Rd. Project work includes earthwork grading, removing asphalt, providing new asphalt surface, clearing and grubbing, and native seeding.
Project Completion:
Interim Completion of Asphalt Paving Work by November 19, 2021 or June 24th, 2022 pending weather, construction timing, and contractor option. Final Turf Restoration and Project Substantial Completion July 15th, 2022.
Disadvantaged Business Enterprise (DBE) participation goal for this project is 15%.
| 10/20/2021 07:00 PM UTC |
5300-20144 Central Fleet Maintenance HVAC Replacement (Bid Date Extended)
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system
Project Completion/ Substantial Completion Date/Calendar Days: 150 Days
(Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
| 10/20/2021 07:00 PM UTC |
5300-20144 Central Fleet Maintenance HVAC Replacement
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system
Project Completion/ Substantial Completion Date/Calendar Days: 150 Days
(Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
| 10/13/2021 07:00 PM UTC |
5041-21402-03 Time & Material (MKE) General Mitchell International Airport REBID
Contract 3: Carpet & Resilient Flooring.
Bids are to be completed online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home no later than 2 P.M., September 29, 2021.
| 09/29/2021 07:00 PM UTC |
P698-19613 GREENFIELD PARK OAK LEAF TRAIL CONSTRUCTION
Project Funded: Federally Funded with Transportation Alternatives Program.
Contract 1: Trail Construction
Work of the Project consists of removing existing asphalt surface and providing new asphalt surface, culvert pipe and trail signs as indicated in the project Bid documents.
Project Completion: Work of the project shall be Substantially Complete as follows:
Construction of the project shall begin on or after 10/11/2021 and shall be substantially completed by 11/19/2021. Final turf restoration shall be completed by 6/3/2022.
Prime contractor shall perform at least 30 percent of the original contract amount with contractor’s own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid.
Contractor shall complete the Affidavit of Non-Collusion that is part of the Bid Form confirming that the bidder has not engaged in any collusion related to the bidding of the project.
Bids are to be completed online in Bid Express
no later than 2 P.M., September 15, 2021.
Milwaukee County project bid summary results will be posted on the Bid Express site and Milwaukee County web site at www.county.milwaukee.gov. Bid summary results may be available a few days following the Bid Due Date time.
| 09/15/2021 07:00 PM UTC |