General Info

Business Logo

Milwaukee County

633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WO0643012 War Memorial Center Flood Mitigation
The Project includes construction services to decouple the existing sewer connection. A new vault will be installed to house 4 stormwater pumps that will connect to an existing manhole located to the south. Project will include all associated plumbing and electrical work to ensure the new system runs properly. A Pre-Bid Meeting will be held 12/20/2024 at 10:00 a.m. at the: War Memorial Center 750 North Lincoln Memorial Dr., Milwaukee, WI 53202. Plan to meet at Lower-Level, North Entrance near the security desk.
01/22/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
5300-20144 Central Fleet Maintenance HVAC Replacement
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system Project Completion/ Substantial Completion Date/Calendar Days: 150 Days (Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
10/13/2021 07:00 PM UTC
5041-21402-03 Time & Material (MKE) General Mitchell International Airport REBID
Contract 3: Carpet & Resilient Flooring. Bids are to be completed online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home no later than 2 P.M., September 29, 2021.
09/29/2021 07:00 PM UTC
P698-19613 GREENFIELD PARK OAK LEAF TRAIL CONSTRUCTION
Project Funded: Federally Funded with Transportation Alternatives Program. Contract 1: Trail Construction Work of the Project consists of removing existing asphalt surface and providing new asphalt surface, culvert pipe and trail signs as indicated in the project Bid documents. Project Completion: Work of the project shall be Substantially Complete as follows: Construction of the project shall begin on or after 10/11/2021 and shall be substantially completed by 11/19/2021. Final turf restoration shall be completed by 6/3/2022. Prime contractor shall perform at least 30 percent of the original contract amount with contractor’s own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid. Contractor shall complete the Affidavit of Non-Collusion that is part of the Bid Form confirming that the bidder has not engaged in any collusion related to the bidding of the project. Bids are to be completed online in Bid Express no later than 2 P.M., September 15, 2021. Milwaukee County project bid summary results will be posted on the Bid Express site and Milwaukee County web site at www.county.milwaukee.gov. Bid summary results may be available a few days following the Bid Due Date time.
09/15/2021 07:00 PM UTC
6533-21400-01 -2021Time & Material (MKE) Behavior Health Divison
Contract 1: General Construction
09/08/2021 07:00 PM UTC
6533-21400-02 -2021Time & Material (MKE) Behavior Health Divison
Contract 2: Plumbing
09/08/2021 07:00 PM UTC
6533-21400-03 -2021Time & Material (MKE) Behavior Health Divison
Contract 3: Fire Protection
09/08/2021 07:00 PM UTC
6533-21400-04 -2021Time & Material (MKE) Behavior Health Division
Contract 4: Heating & Ventilating
09/08/2021 07:00 PM UTC
6533-21400-05 -2021Time & Material (MKE) Behavior Health Division
Contract 5: Electrical
09/08/2021 07:00 PM UTC
6533-21400-06 -2021Time & Material (MKE) Behavior Health Division
Contract 6: Painting
09/08/2021 07:00 PM UTC
6533-21400-07 -2021Time & Material (MKE) Behavior Health Division
Contract 7: Roofing
09/08/2021 07:00 PM UTC
161 - 170 of 282 Solicitations
1 2 13 14 15 17 19 20 21 28 29