Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WO0643012 War Memorial Center Flood Mitigation
The Project includes construction services to decouple the existing sewer connection. A new vault will be installed to house 4 stormwater pumps that will connect to an existing manhole located to the south. Project will include all associated plumbing and electrical work to ensure the new system runs properly.
A Pre-Bid Meeting will be held 12/20/2024 at 10:00 a.m. at the:
War Memorial Center
750 North Lincoln Memorial Dr.,
Milwaukee, WI 53202.
Plan to meet at Lower-Level, North Entrance near the security desk.
| 01/22/2025 08:00 PM UTC |
Number | Deadline |
---|---|
5041-21402-03 - 2021Time & Material (MKE) General Mitchell International Airport
Contract 3: Carpet & Resilient Flooring
| 08/25/2021 07:00 PM UTC |
P727-20199: Oak Leaf Trail Union Pacific Segment Crestwood Stream Culvert
Contract 1- Oak Leak Trail Culvert Replacement
Work consists of replacing an existing stone arch culvert under the Oak Leaf Trail with a corrugated metal culvert pipe. Excavate and remove existing stone and debris from Crestwood Stream channel through the culvert. Install an arch corrugated metal pipe culvert, backfill and restore the disturbed area.
Project Completion: Work of Contract shall be Substantially Complete by June 1, 2022.
Pre-Bid Meeting: August 5, 2021 at 2:00 pm, meet at the 2200 block of W. Florist Avenue at the service entrance to Johnson Control Inc., Glendale, WI.
Prime Contractor shall perform at least 30 percent of the original contract amount with contractor's own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid.
| 08/18/2021 07:00 PM UTC |
C216-20187: CH Complex Improvements CJF Caulking Phase 2
CONTRACT 1:
1) Phase 2 would consist of 100% sealant joint replacement on the existing façade limestone panels from the bottom of the third level to the ground level. The exterior joint replacement on the main CJF exterior walls would be accessed by swing stage scaffolding. Exterior joint replacement would include removal of existing joint material, prep joint, install new joint filler as needed, new backer rood (compression seal) and polyurethane sealant (tooled finish).
2) Also Phase 2 would include spall repair on the existing limestone panels, limestone crack repair, replacement of damaged / deteriorated limestone panels that are beyond repair, and replacement of 100% parapet coping sealant joints with new backer rod, sealant , and new lead T-caps.
Pre-Bid Meeting for CONTRACT-1, Bid Package 1
Takes place on July 14, 2021 at 1:30 PM, 633 West Wisconsin Avenue, Milwaukee, Wisconsin 53203, SEVENTH FLOOR, ROOM 730 – Todd M. Beamer Memorial Training Center
| 07/21/2021 07:00 PM UTC |
O889-20190: Marcus Center For The Performing Arts Pedestrian Pavement Replacement
Contract 1: Pedestrian Pavement Replacement
Work consists of reconstructing the east/main entrance to the Marcus Center and along the Milwaukee River/west side of the Peck Pavilion. Safety bollard, cable barrier, and decorative colored concrete will be utilized as indicated in the project Bid documents.
Pre-Bid Meeting: One Pre-Bid meeting will take place on July 14th, 2021 at 1:00 PM at the Marcus Center (outside under the main entry canopy along North Water Street), 929 N. Water Street, Milwaukee, WI 53202. This will be an in-person meeting, please bring masks and follow COVID guidelines. It is strongly recommended that the contractors attend, but it is not mandatory.
| 07/21/2021 07:00 PM UTC |
9525-21405-04: 2021 Time and Material Zoological Gardens
Contract 4: Electrical
| 07/14/2021 07:00 PM UTC |
9525-21405-05: 2021 Time and Material Zoological Gardens
Contract 5: Fences and Gates
| 07/14/2021 07:00 PM UTC |
9525-21405-06: 2021 Time and Material Zoological Gardens
Contract 6: General Construction
| 07/14/2021 07:00 PM UTC |
9525-21405-07: 2021 Time and Material Zoological Gardens
Contract 7: Metal Fabrication
| 07/14/2021 07:00 PM UTC |
9525-21405-08: 2021 Time and Material Zoological Gardens
Contract 8: Plumbing
| 07/14/2021 07:00 PM UTC |
9525-21405-09: 2021 Time and Material Zoological Gardens
Contract 9: Roofing
| 07/14/2021 07:00 PM UTC |