General Info

Business Logo

Milwaukee County

600 N Plankinton Ave Ste 600, Milwaukee, WI 53203-2901
(414) 278-4861

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
5740-25000 2025 Countywide Time & Material Landscaping Rebid
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional pre-bid meeting (highly encouraged) On October 15th, 2025, at 3:00pm via Microsoft Teams. Meeting ID: 230 579 239 359 1 Passcode: fV7CB9Ez Please contact Michelle Johnson at michelle.johnson@milwaukeecountywi.gov for additional Pre-Bid meeting information.
10/29/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material Carpet and Flooring Rebid
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional pre-bid meeting (highly encouraged). On October 15th, 2025, at 3:00pm via Microsoft Teams. Meeting ID: 230 579 239 359 1 Passcode: fV7CB9Ez Please contact Michelle Johnson at michelle.johnson@milwaukeecountywi.gov for additional Pre-Bid meeting information.
10/29/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material Native Plants Landscaping Rebid
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional pre-bid meeting (highly encouraged). On October 15th, 2025, at 3:00pm. via Microsoft Teams. Meeting ID: 230 579 239 359 1 Passcode: fV7CB9Ez Please contact Michelle Johnson at michelle.johnson@milwaukeecountywi.gov for additional Pre-Bid meeting information.
10/29/2025 07:00 PM UTC
WP074801: Oak Leaf Trail Connectivity - Bender Park
Work of the Project includes building a 10-foot-wide asphalt shared-use path approximately 1.33 miles long. Work includes earthwork, storm sewer, concrete ramps, biofilter, signage, native seeding and plants. Optional Pre-Bid Meeting: Wednesday October 15th, 2025, at 1:30 PM. Meet outside near the boat launch at Bender Park, 4503 E. Ryan Road, Oak Creek, WI 53154.
11/06/2025 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
T150-21220 Fond du Lac Operators Building HVAC Replacement
Replace one existing rooftop unit with two new interconnected 12.5 tons rooftop units. The existing control system will be replaced ,upgraded, and integrated into the existing County wide head end system.
07/27/2022 07:00 PM UTC
O117-20066 MARCUS CENTER FOR THE PERFORMING ARTS ROOF REPLACEMENT REBID
Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
04/27/2022 07:00 PM UTC
WH0110012 W. Beloit Rd (CTH T) S. 124th St to S Wollmer Rd Highway Reconditioning
The work under this contract shall consist of removing asphaltic surface milling, removing concrete surface partial depth, grading, base aggregate dense, rubblizing, pulverize and relay, HMA pavement, concrete curb & gutter, guardrail, erosion control, permanent signing, pavement marking, traffic control, storm sewer construction including structures adjustment and reconstruction, structure concrete surface repair and sealing joints, traffic signals, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. This project is part of the Local Roads Improvement Program (LRIP).
04/20/2022 07:00 PM UTC
P538-19607 Root River Parkway Reconstruction- S 92nd St. & Parking lot
Work of the Project includes milling the existing asphalt pavement, re-grading, and providing new asphalt pavement new concrete curb and gutter, bio-filtration basins, lighting, turf restoration, and pavement marking as indicated in the project Bid documents. Enter the official advertisement scope here.
03/30/2022 07:00 PM UTC
V021-20137: Oak Creek Streambank Stabilization
Work of the Project includes construction services for the streambank stabilization solution along the Oak Creek streambank as indicated in the project Bid documents.
03/16/2022 07:00 PM UTC
Z177-20166 MILWAUKEE COUNTY ZOO PARKING LOT #4 REPAVEMENT
Contract 1: Parking Lot Repavement Work of the Project includes milling the existing asphalt pavement, re-grading, and providing new asphalt pavement. Also includes installation of tent tie downs, replacement of concrete curb and gutter, new concrete pavement and pavement marking as indicated in the project Bid documents.
03/09/2022 08:00 PM UTC
P625-20142 & V038-20073 Dretzka Parking Lot & Gravity Sanitary Sewer Extension
Dretzka Golf Clubhouse parking lot replacement; partial access drive replacement; new concrete curb & gutter; drainage/storm sewers; lighting; water mains, and landscaping. Installing gravity sanitary sewer to replace current sanitary system. Then abandoning sanitary sewer lift station, manholes, and force main. Substantial Completion Date: August 19, 2022 Optional Pre-Bid Meeting: Online Team’s Meeting on February 1st, 10AM Email Michael.Brill@milwaukeecountywi.gov for invite. Optional Site Walk Through: Dretzka Park Golf Club House on January 31th, 10AM
03/02/2022 08:00 PM UTC
5051-22610 High Voltage Testing 5-yr Service Contract
Service Agreement 1. High Voltage Maintenance
02/25/2022 08:00 PM UTC
T078-20074 MCTS KK Garage Bus Storage Building Roof Replacement
Contract 1: Roof Replacement Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
02/23/2022 08:00 PM UTC
T149- 20219 Fond du Lac Transportation Building Roof Replacement (Extended)
Contract 1: Roof Replacement Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
02/17/2022 08:00 PM UTC
171 - 180 of 313 Solicitations
1 2 14 15 16 18 20 21 22 31 32