General Info

Business Logo

Milwaukee County

633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WC0227 Milwaukee County Courthouse Elevator Modernization
The elevators in the Milwaukee County Courthouse need to be modernized. This project addresses the modernization of 13 elevators. The Mandatory Pre-Bid Meeting is on Monday, 02/24/25 from 10:00am - 12:00pm at 901 N 9th St, Milwaukee, WI 53233 Room G1. Pre-Registration is Required. for this meeting. Please contact Martina Foss Ashworth at mfoss@millerdunwiddie.com to register. Project Contact: Martina Foss Ashworth Contact Email: mfoss@millerdunwiddie.com
04/10/2025 07:00 PM UTC
WA0413 MKE Rehabilitate Bullseye
This project is for the rehabilitation of pavements and shoulders inside hold lines of Runways 1L-19R and 7RL-25L at Milwaukee General Mitchell International Airport (MKE). Project Completion: The number of consecutive calendar days the contractor has available to substantially complete the project, excluding punch list items is 165 Calendar Days. The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates close in proximity. Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM Pre-Bid meeting will be done virtually via Teams. To acquire the meeting link to the pre bid meeting, please contact Kwame Amegashitsi at kamegashitsi@mitchellairport.com prior to Monday, March 24, 2025, at 5:00PM. Later requests are not guaranteed a timely response.
04/16/2025 07:00 PM UTC
WA0400 MKE North Ramp Rehabilitation
This project is for the rehabilitation of the North Apron at Milwaukee Mitchell International Airport (MKE). This project involves an asphalt mill & overlay, storm sewer structure replacement and pavement marking. Additive Alternate: WA0417 MKE Rehabilitate Taxiway F This project is for the rehabilitation of Taxiway F between Runways 1L/19R and 7L/25R at Milwaukee Mitchell International Airport (MKE). Project Completion: If MKE North Ramp Rehabilitation is awarded, the contractor shall have a total of 137 calendar days to substantially complete the project, excluding punch list. If additive alternative, MKE Rehabilitate Taxiway F is awarded, no additional calendar days will be awarded to the contract: Base Bid Only = 137 Calendar Days Base Bid + Alternate = 137 Calendar Days The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates in close proximity. Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM Pre-Bid meeting will be done virtually via Teams. To acquire the meeting link to the pre bid meeting, please contact Kwame Amegashitsi at kamegashitsi@mitchellairport.com prior to Monday, March 24, 2025, at 5:00PM. Later requests are not guaranteed a timely response.
04/16/2025 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
6533-21400-01 -2021Time & Material (MKE) Behavior Health Divison
Contract 1: General Construction
09/08/2021 07:00 PM UTC
6533-21400-02 -2021Time & Material (MKE) Behavior Health Divison
Contract 2: Plumbing
09/08/2021 07:00 PM UTC
6533-21400-03 -2021Time & Material (MKE) Behavior Health Divison
Contract 3: Fire Protection
09/08/2021 07:00 PM UTC
6533-21400-04 -2021Time & Material (MKE) Behavior Health Division
Contract 4: Heating & Ventilating
09/08/2021 07:00 PM UTC
6533-21400-05 -2021Time & Material (MKE) Behavior Health Division
Contract 5: Electrical
09/08/2021 07:00 PM UTC
6533-21400-06 -2021Time & Material (MKE) Behavior Health Division
Contract 6: Painting
09/08/2021 07:00 PM UTC
6533-21400-07 -2021Time & Material (MKE) Behavior Health Division
Contract 7: Roofing
09/08/2021 07:00 PM UTC
5041-21402-03 - 2021Time & Material (MKE) General Mitchell International Airport
Contract 3: Carpet & Resilient Flooring
08/25/2021 07:00 PM UTC
P727-20199: Oak Leaf Trail Union Pacific Segment Crestwood Stream Culvert
Contract 1- Oak Leak Trail Culvert Replacement Work consists of replacing an existing stone arch culvert under the Oak Leaf Trail with a corrugated metal culvert pipe. Excavate and remove existing stone and debris from Crestwood Stream channel through the culvert. Install an arch corrugated metal pipe culvert, backfill and restore the disturbed area. Project Completion: Work of Contract shall be Substantially Complete by June 1, 2022. Pre-Bid Meeting: August 5, 2021 at 2:00 pm, meet at the 2200 block of W. Florist Avenue at the service entrance to Johnson Control Inc., Glendale, WI. Prime Contractor shall perform at least 30 percent of the original contract amount with contractor's own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid.
08/18/2021 07:00 PM UTC
C216-20187: CH Complex Improvements CJF Caulking Phase 2
CONTRACT 1: 1) Phase 2 would consist of 100% sealant joint replacement on the existing façade limestone panels from the bottom of the third level to the ground level. The exterior joint replacement on the main CJF exterior walls would be accessed by swing stage scaffolding. Exterior joint replacement would include removal of existing joint material, prep joint, install new joint filler as needed, new backer rood (compression seal) and polyurethane sealant (tooled finish). 2) Also Phase 2 would include spall repair on the existing limestone panels, limestone crack repair, replacement of damaged / deteriorated limestone panels that are beyond repair, and replacement of 100% parapet coping sealant joints with new backer rod, sealant , and new lead T-caps. Pre-Bid Meeting for CONTRACT-1, Bid Package 1 Takes place on July 14, 2021 at 1:30 PM, 633 West Wisconsin Avenue, Milwaukee, Wisconsin 53203, SEVENTH FLOOR, ROOM 730 – Todd M. Beamer Memorial Training Center
07/21/2021 07:00 PM UTC
171 - 180 of 289 Solicitations
1 2 14 15 16 18 20 21 22 28 29