Number Deadline
WO0643012 War Memorial Center Flood Mitigation
The Project includes construction services to decouple the existing sewer connection. A new vault will be installed to house 4 stormwater pumps that will connect to an existing manhole located to the south. Project will include all associated plumbing and electrical work to ensure the new system runs properly. A Pre-Bid Meeting will be held 12/20/2024 at 10:00 a.m. at the: War Memorial Center 750 North Lincoln Memorial Dr., Milwaukee, WI 53202. Plan to meet at Lower-Level, North Entrance near the security desk.
01/22/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
T149- 20219 Fond du Lac Transportation Building Roof Replacement
Contract 1: Roof Replacement Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
02/16/2022 07:00 PM UTC
P698-19613 Greenfield Park Oak Leaf Trail
Work of the Project consists of removing existing asphalt surface and providing new asphalt surface, culvert pipe and trail signs as indicated in the project Bid documents.
02/10/2022 08:00 PM UTC
O117-20066 Marcus Center for the Performing Arts Roof Replacement
Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
02/09/2022 08:00 PM UTC
O189-20161 Countywide ADA Repairs - Phase 3, Courthouse
The project includes remodeling one men’s and one women’s restroom on one floor of the courthouse to create accessible restrooms on a floor that currently offers no accessible restrooms. This project will focus on renovating one existing men’s restroom and one existing women’s restroom on the Ground Floor of the Courthouse. An additional area shall be renovated on the Ground Floor of the Courthouse, adjacent to the women’s restroom, creating a family restroom. This family, or universal, restroom is to be a unisex restroom that is handicap accessible i.e., a separate facility which accommodates changing a baby, breastfeeding, and parents attending children of the opposite sex. Within this family restroom an adult size changing table shall be located. The adult changing table can raise and lower as needed by the user and/or caregiver.
02/09/2022 08:00 PM UTC
T141-20169 KK Bus Wash HVAC Replacement
Remove air Curtains, MUA unit and exhaust fans and install a new gas fired MUA unit, 2 new exhaust fans along with 2 new toilet exhaust fans
12/15/2021 08:00 PM UTC
V054-21204 -01 Sanitary Sewer Rehabilitation at Multiple Locations
Contract 1: Clean & CCTV Sewer Lines Work consists of furnishing all labor, materials, supplies, equipment, tools and other services necessary for providing the rehabilitation of sanitary sewer manholes and pipes, televising and cleaning of pipes, and abandonment of manholes and pipes as specified. Contractor shall perform this Work at multiple Milwaukee County locations including the County Grounds, Zoo, Parks, Airport, and House of Corrections. All Work shall be in accordance with Contract Drawings and Specifications. Pre-Bid Meeting: December 1ST, 2021 at 10:00am, meet at Milwaukee County, Architecture, Engineering, and Environmental Services Office, 633 West Wisconsin Avenue, Suite 1000, Milwaukee, WI 53203. Meetings will be conducted in small groups. Masks, Health Screenings, and Social Distancing are required.
12/08/2021 08:00 PM UTC
V054-21204 -02 Sanitary Sewer Rehabilitation at Multiple Locations
Contract 2: Sewer Manholes & Pipe Rehabilitation Work consists of furnishing all labor, materials, supplies, equipment, tools and other services necessary for providing the rehabilitation of sanitary sewer manholes and pipes, televising and cleaning of pipes, and abandonment of manholes and pipes as specified. Contractor shall perform this Work at multiple Milwaukee County locations including the County Grounds, Zoo, Parks, Airport, and House of Corrections. All Work shall be in accordance with Contract Drawings and Specifications. Pre-Bid Meeting: December 1ST, 2021 at 10:00am, meet at Milwaukee County, Architecture, Engineering, and Environmental Services Office, 633 West Wisconsin Avenue, Suite 1000, Milwaukee, WI 53203. Meetings will be conducted in small groups. Masks, Health Screenings, and Social Distancing are required.
12/08/2021 08:00 PM UTC
9420-20580 - Little Menomonee River Parkway Habitat Restoration: Sections 4 and 5
Habitat restoration within the Little Menomonee River Parkway including reforestation, invasive species removal, grassland restoration and management, forest stand improvement, wetland restoration and sedge meadow restoration. Project is funded by a Great Lakes Restoration Initiative Grant sub-granted through the Department of Natural Resources to Milwaukee County Parks. Pre-Bid Meeting: One Pre-bid meeting will take place on October 13, 2021 at 1:00PM. Meeting will be held virtually via Microsoft Teams. Email Project Manager, Natalie Dutack at Natalie.Dutack@milwaukeecountywi.govfor a link to the meeting. CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WHEN NOTIFIED AS APPARENT LOW BIDDER. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS. CONTRACTOR SHALL PROVIDE QUALITIFCATIONS AT TIME OF BID. SEE REFERENCE DOCUMENTS 00 20 00 SECTION 21
10/27/2021 07:00 PM UTC
P697-19612 - Oak Leaf Trail Relocation Site #716
Project Funded: Federally Funded with Transportation Alternatives Program. Contract 1: Shared-Use Path Construction Work consists of reconstructing and relocating two segments of Milwaukee County’s Oak Leaf Trail located within the Little Menomonee Parkway, specifically on the west side of N 91st St between W. Good Hope Rd and W. Bradley Rd. Project work includes earthwork grading, removing asphalt, providing new asphalt surface, clearing and grubbing, and native seeding. Project Completion: Interim Completion of Asphalt Paving Work by November 19, 2021 or June 24th, 2022 pending weather, construction timing, and contractor option. Final Turf Restoration and Project Substantial Completion July 15th, 2022. Disadvantaged Business Enterprise (DBE) participation goal for this project is 15%.
10/20/2021 07:00 PM UTC
5300-20144 Central Fleet Maintenance HVAC Replacement (Bid Date Extended)
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system Project Completion/ Substantial Completion Date/Calendar Days: 150 Days (Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.