General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
24-38-2
X-Ray Scanners - St Tammany Parish Government is requesting quotes to replace two (2) X-ray scanners for the Justice Center at 701 N. Columbia Street, Covington LA, 70443.
08/15/2024 07:00 PM UTC
24-34-1
Lenel Rd Drainage------------------------------------------------------------The Parish requests a contractor to improve drainage located on Lenel Rd (R010C007) Section 17 Township 6S Range 12E; in Bush, Louisiana.
08/14/2024 07:00 PM UTC
24-32-1
E. Cherrywood Ln Drainage-------------------------------------------------The Parish requests a contractor to remove/replace storm drain pipe/catch basin/concrete driveway, to improve area drainage at locations identified on E Cherrywood Ln (R08A053) Section 14 Township 8S Range 14E, in Pearl River, Louisiana, 70452
08/14/2024 07:00 PM UTC
24-37-1
Arrow Wood Pond Drainage ---- The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to install pond valves, backfill and fencing at the Arrow Wood Pond lateral (D03LW01154) Section 1 Township 7S Range 11E located in Abita Springs, LA, as per the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is twenty-one (21) calendar days from the issuance of the Notice to Proceed (NTP) issued by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
08/14/2024 07:00 PM UTC
24-29-2
Davis Canal Restoration----------------------------------------------------Dredging and sheet pile installation at the Davis Landing Canal at the intersection of the West Pearl River in Pearl River, Louisiana.
08/13/2024 07:00 PM UTC
24-30-1
Snead Dr Panels------------------------------------------------------------The Parish requests a contractor to remove, replace and/or repair concrete panels and concrete rollover/barrier curbs, along Snead Dr (R06O017) Section 25 Township 6S Range 12E; Abita Springs, Louisiana.
08/13/2024 07:00 PM UTC
24-26-1
Steele Rd Drainage------ The Parish requires a Contractor to install new subsurface pipe to improve drainage, on Steele Rd (D08NW01012; S38-T9S-R15E) located in Slidell, Louisiana.
08/13/2024 07:00 PM UTC
24-31-1
Toulouse St. - The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to repair sinkholes and eroded pipe, along Toulouse St (R08H016) Section 36 Township 8S Range 14E Slidell, Louisiana.
08/07/2024 07:00 PM UTC
24-33-1
River Rd Drainage ------ The Parish requests a contractor to improve drainage by installing a catch basin and sub-surface drainage located at River Rd (R03H001) Section 17 Township 6S Range 11E; Covington, Louisiana.
08/07/2024 07:00 PM UTC
24-25-2
24-26-2 - Moonraker Dr Drainage --------- All labor and materials necessary to line existing 18” and 24”culverts with Cured in Place Pipe (CIPP). Work shall occur at the locations noted on the attached drawings. All work shall be done in accordance with the manufacturer’s installation procedures and recommendations. All debris shall be removed at no direct pay The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is one hundred twenty (120) calendar days from the issuance of Notice to Proceed (NTP) by the Parish.
08/06/2024 07:00 PM UTC
151 - 160 of 914 Solicitations