Lacombe Trace Trails & Nature Park--------------------------------------------The project is for the construction of a public outdoor recreation nature park as part of the existing Tammany Trace bike path.
| 01/07/2025 08:00 PM UTC |
24-71-2
Soell Dr, Soell Dr Drainage, Helenbirg Dr, Mire Dr------Work to include asphalt mill and overlay, rebuilding sections of roadway, pavement patching, replacement of culverts, installation of subsurface drainage, box culvert installation, excavation and embankment work, regrading of ditches, signage, striping and the installation of speed tables.
The Parish reserves the right to add, remove or otherwise modify the above, as
determined necessary by the Parish and as allowed by the law.
| 01/07/2025 08:00 PM UTC |
24-69-1
2024 Parishwide Striping------ The Parish requests a contractor to provide and install thermoplastic striping as specified along
the following Parish roads:
• Caroline St (R04E234) Section 38 Township 8S Range 11E, Mandeville;
• Destin St (R04E242) Section 38 Township 8S Range11E, Mandeville;
• Dupard St (R04E143) Section 38 Township 8S Range 11E, Mandeville;
• Evangeline Dr (R09E049) Section 11 Township 9S Range 13E; Slidell;
• Fish Hatchery Rd (R07A001) Section 6 Township 8S Range 13E; Lacombe;
• Labarre St (R04E126) Section 38 Township 8S Range11E, Mandeville;
• McNamara St (R04E344) Section 38 Township 8S Range 11E;
• Meadow Lake Subdivision Section 12 Township 9S Range 14E; Slidell;
• Ninth Ave (R03L047) Section 11 Township 7S Range 11E; Covington;
• Pruden Rd (R03D005) Section 25 Township 6S Range 11E; Covington; and
• Tammany Trace Crosswalks (R11A001) various locations.
| 01/07/2025 08:00 PM UTC |
24-77-2
Chlorinated Tablets 3”------St. Tammany Parish Government (STPG) Department of Utilities (DU) is seeking bids to supply Chlorinated Solid 3” (three-inch) Tablets for our Wastewater Treatment Facilities. DU owns and operates over fifty treatment facilities throughout St. Tammany Parish.
| 01/07/2025 08:00 PM UTC |
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
| 01/16/2025 08:00 PM UTC |
Number | Deadline |
---|---|
23-3-2
Cross Gates Water System - New Elevated Storage Tanks------New elevated steel water storage tanks, controls, piping, site grading and drainage, electrical service, equipment, utility lines and other related items at the Willow Wood and Ozone Pines sites.
| 10/18/2023 07:00 PM UTC |
23-38-2
2023 West District Panel Replacements-------------------------------------------------The Parish requires a Contractor to provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs along various Parish Roads.
| 10/17/2023 07:00 PM UTC |
23-38-1
Desoto Dr Drainage--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to increase area drainage by installing/replacing/repairing drain pipe and catch basins as specified along Desoto St (R04D173) Section 34, Township 7S, Range 11E; located in Mandeville, Louisiana.
The time period for completion of the project is thirty (30) calendar days.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 10/12/2023 07:00 PM UTC |
23-36-2
Lonesome Rd., Lonesome Rd. Drainage----------------------------------------------- The Contractor shall provide all labor, equipment, materials, and tools necessary for milling and overlaying asphaltic concrete roadways, roadway striping, and drainage improvements as specified along Lonesome Rd. (R04D032) Section 40 Township 8S Range 11E.
| 10/11/2023 07:00 PM UTC |
23-35-2
Pearl River Diversion Canal Restoration------------------------------------------------The work for this project comprises the dredging of the Pearl River Diversion Canal beginning at the intersection with the W. Pearl River and heading upstream within the canal approximately 1,500 feet.
| 10/11/2023 07:00 PM UTC |
23-37-1
Rue Piper Drainage - The Parish requires a Contractor to install catch basins, pipe and rip rap to fix erosion issues at Rue Piper (R08M041; S7-T9-R15) in Slidell, Louisiana.
| 10/05/2023 07:00 PM UTC |
23-39-1
Paradise Court Drainage Repair-----------------------------------------------------------The Parish requires a Contractor to remove/replace culverts that are failing, rotten and causing sinkholes, as well as concrete driveways, to improve drainage located at 216 Paradise Court (R04D154; S27-T7-R11) in Mandeville, Louisiana.
| 10/04/2023 07:00 PM UTC |
23-40-1
Houmas Ct. Drainage---------------------------------------------------------------------The Parish requires a Contractor to remove/replace side drain pipe and remove/replace concrete driveway to improve drainage at 108 Houmas Court (R08E020; S19-T8-R15) in Pearl River, Louisiana 70452
| 10/04/2023 07:00 PM UTC |
23-30-2
Safe Haven Entrance Improvements----------The work of this contract comprises the removal of the existing concrete pavement entrance and replacement with pervious pavement and underdrain system, replacement of driveway culvert, installation of new monument signs/lighting, installation of new landscaping/irrigation and bioswale and restoration of existing brick wall fencing.
| 10/03/2023 07:00 PM UTC |
23-34-2
53 Bleu Lake Drive, Birch Drive, and Pine Drive Drainage----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve remove, and replace existing cross drain pipes, headwalls, and roadway asphalt along 53 Bleu Lake Drive located in Covington, LA (R02V006) Section 10 Township 5S Range 11E; Birch Drive located in Folsom, LA (R02K026) Section 21 Township 5S Range 10E; and Pine Drive located in Folsom, LA (R02K018) Section 22 Township 5S Range 10E.
The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
The time period for completion of the project is ninety (90) calendar days from the issuance of the Notice to Proceed (NTP) by the Parish
| 10/03/2023 07:00 PM UTC |