St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-17-2
Slemmer Rd Drainage Ph 2--------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing, replacing, and/or repairing drainpipes, catch basins, driveways, and sod as specified along Slemmer Rd (R03L006), located in Covington, LA.
| 04/01/2026 07:00 PM UTC |
|
26-9-1
Paradise CT Drainage------------------------------ The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by repairing sinkholes and eroded pipes as specified along Paradise Ct (R04D154), Covington, Louisiana.
| 04/01/2026 07:00 PM UTC |
|
26-13-2
Justice Center Boilers--------------------------Base Bid to include the removal of (2) existing hot water heating boilers with (1) new boiler to be replaced in a configuration similar to existing. Piping for the second boiler shall be stubbed out and capped for future replacement. A rental boiler shall be included to maintain building heating during the project. A new opening and roll door in the boiler room wall to be installed to accommodate boiler removal and installation as well as future service. The door to the loading dock area will be replaced with a pair of 3'-0" x 8'-0" hollow metal doors and hardware to accommodate boiler replacement.
| 04/08/2026 07:00 PM UTC |
|
26-16-2
Rosedown Way Drainage Phase 2--------------
The Contractor shall provide all labor, equipment, tools, testing, and materials
necessary to complete drainage improvements in accordance with the construction
plans and specifications for the Rosedown Subdivision, located in Mandeville,
Louisiana, 70471. The work includes replacement of existing drainage
infrastructure along Camden Court, construction of a new concrete-lined channel
to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all
incidental work, such as replacement of concrete street panels, sidewalks, and
driveways, utility relocations, installation of sewer and water conflict boxes, and
placement of rip rap at the outfall.
| 04/14/2026 07:00 PM UTC |
|
26-18-2
2026 District 7 Road Improvements-------------
The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying road surfaces along various District 7 Parish roads.
| 04/14/2026 07:00 PM UTC |
|
26-19-2
2026 District 2, 3 Road Improvements----------
The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying, patching, and reconstructing road surfaces as specified along various District 2 and District 3 Parish roads.
| 04/14/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
24-53-2
West St. Tammany Regional Sewer Treatment Facility ------ The work of this contract comprises the construction and installation of a new influent pump station for the existing West St. Tammany Wastewater Treatment Plant.
The Base Bid includes, but is not limited to, wet well, pumps, electrical panels, pump building, open channel with bar screen, yard piping, and a concrete foundation pad, conduit and hook-ups for a generator.
Bid Alternate #1 includes, but is not limited to, a generator sized to run not only the pump station, but also the treatment plant in the event of power outage.
| 10/22/2024 07:00 PM UTC |
|
24-47-1
Toulouse St & Lake Superior Dr Drainage Repair --- The Parish requires a Contractor to improve drainage as specified on Toulouse St. (R18H016) Section 36 Township 8S Range 14E; located in Slidell, LA., and on Lake Superior Dr. (R08L047) Section 31 Township 8S Range 15E: located in Slidell, LA., as specified.
| 10/22/2024 07:00 PM UTC |
|
24-55-2
Lacombe Trace Trails & Nature Park (Boardwalk)-----------------------------------------The St. Tammany Parish Department of Planning and Development is requesting proposals for a pre-engineered and pre-fabricated boardwalk system as part of the Lacombe Trace Trails & Nature Park (Boardwalk) project.
| 10/17/2024 07:00 PM UTC |
|
24-50-1 S Ferry Lake Ct Sidewalk Repair
S Ferry Lake Ct Sidewalk Repair----------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to remove/repair sidewalk panels at 703 S Ferry Lake Ct (R08L037) Section 31 Township 8S Range 15E Slidell, Louisiana.
| 10/17/2024 07:00 PM UTC |
|
24-52-1
Armored Courier Services ------------------------------------------St. Tammany Parish is soliciting quotes from a vendor to provide armored courier services for pick-up and delivery of bank deposits from specified location(s) within the Parish and deliver the deposits to a designated vault.
| 10/17/2024 07:00 PM UTC |
|
24-43-2
Brewster Road Sewer Consolidation------Construction of new sewer force mains, construction and startup of new sewerage pumping stations, and decommissioning and disposal of existing treatment facilities located in St. Tammany Parish.
| 10/08/2024 07:00 PM UTC |
|
24-48-2
DPW Maintenance Barn Roof Repairs--------The Contractor must provide all labor, equipment, materials, and tools necessary for removal and disposal of existing roofing system on Trace Maintenance Barn Roof, Airport Barn Shed Roof, Hwy 59 Barn Roof, Fritchie Barn Roof and Keller Barn Roof.
| 10/03/2024 07:00 PM UTC |
|
24-41-2
Ozone Pines Water Distribution--------------------------------------------------- The contractor must provide all labor, equipment, tools, testing, and materials necessary to rehabilitate the water distribution network in the Ozone Pines subdivision, Slidell, Louisiana.
| 10/02/2024 07:00 PM UTC |
|
24-39-2
Meadow Lake New Storage Tank------ New steel ground water storage tank, control building, controls, piping, site grading and drainage, electrical service, equipment, utility lines and other related items at the Meadow Lake site.
| 10/01/2024 07:00 PM UTC |
|
24-44-2
2023 Turning Radius------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve multiple turning radiuses by installing catch basins and drain pipes as specified along the following Parish roads:
4th Ave (R09I017) Section 23 Township 8S Range 14E Slidell;
Cane Ave (R08L015) Section 6 Township 9S Range 15E Slidell;
Doss Dr (R09D057) Section 34 Township 8S Range 14E Slidell;
Dupard St (R04E143) Section 38 Township 8S Range 11E Mandeville;
East Ave (R09G055) Section 38 Township 9S Range 14E Slidell;
Forest Ln (R04D091) Section 40 Township 7S Range 11E Mandeville;
Foy St (R04E122) Section 38 Township 8S Range 11E Mandeville;
Jones Rd (R09D050) Section 34 Township 8S Range 14E Slidell; and
Napoleon Ave (R09G013) Section 38 Township 9S Range 14E Slidell.
| 09/26/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.