General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
24-63-2
Lacombe Trace Trails & Nature Park--------------------------------------------The project is for the construction of a public outdoor recreation nature park as part of the existing Tammany Trace bike path.
01/07/2025 08:00 PM UTC
24-71-2
Soell Dr, Soell Dr Drainage, Helenbirg Dr, Mire Dr------Work to include asphalt mill and overlay, rebuilding sections of roadway, pavement patching, replacement of culverts, installation of subsurface drainage, box culvert installation, excavation and embankment work, regrading of ditches, signage, striping and the installation of speed tables. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by the law.
01/07/2025 08:00 PM UTC
24-69-1
2024 Parishwide Striping------ The Parish requests a contractor to provide and install thermoplastic striping as specified along the following Parish roads: • Caroline St (R04E234) Section 38 Township 8S Range 11E, Mandeville; • Destin St (R04E242) Section 38 Township 8S Range11E, Mandeville; • Dupard St (R04E143) Section 38 Township 8S Range 11E, Mandeville; • Evangeline Dr (R09E049) Section 11 Township 9S Range 13E; Slidell; • Fish Hatchery Rd (R07A001) Section 6 Township 8S Range 13E; Lacombe; • Labarre St (R04E126) Section 38 Township 8S Range11E, Mandeville; • McNamara St (R04E344) Section 38 Township 8S Range 11E; • Meadow Lake Subdivision Section 12 Township 9S Range 14E; Slidell; • Ninth Ave (R03L047) Section 11 Township 7S Range 11E; Covington; • Pruden Rd (R03D005) Section 25 Township 6S Range 11E; Covington; and • Tammany Trace Crosswalks (R11A001) various locations.
01/07/2025 08:00 PM UTC
24-77-2
Chlorinated Tablets 3”------St. Tammany Parish Government (STPG) Department of Utilities (DU) is seeking bids to supply Chlorinated Solid 3” (three-inch) Tablets for our Wastewater Treatment Facilities. DU owns and operates over fifty treatment facilities throughout St. Tammany Parish.
01/07/2025 08:00 PM UTC
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
01/16/2025 08:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
23-34-1
16th Section Road Drainage-------Contractor must provide all labor, materials, tools, and equipment to remove and replace existing storm drain pipes, catch basins and driveways to improve drainage at 16th Section Road (R06H017; S9-T7-R14) located in Pearl River, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be thirty (30) calendar days from issuance of the Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
09/28/2023 07:00 PM UTC
23-36-1
Goldenwood Drainage Repairs - Contractor must provide all labor, materials, tools, and equipment to remove/replace and/or Repair concrete panels, concrete driveway and CB-06 (R08M061; S38-T9-R15) in Slidell, Louisiana. Contractor shall provide all signage and barricades.
09/26/2023 07:00 PM UTC
23-32-1
Turnwood Dr & Kelly Dr Pipe Liner---------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by repairing sinkholes and repairing the eroded pipe located at 503 Turnwood Drive (R03L155) Section 10 Township 7S Range 11E in Covington, Louisiana; 113 Kelly Drive (R08I005) Section 25 Township 8S Range 14E in Slidell, Louisiana. The time period for completion of the project is sixty (60) calendar days from issuance of the NTP by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
09/21/2023 07:00 PM UTC
23-33-1
Acadian Cir & Charles Dr. Drainage Repair-------------------------------------------The Parish requires a Contractor to remove and replace existing storm drain pipes, catch basins, and driveways, to improve drainage at Acadian Cir. (R09E051; S39-T9-R13), and Charles Dr. (R09G041; S38- T9-R14) in Slidell, Louisiana.
09/21/2023 07:00 PM UTC
23-35-1
Dupard Street Drainage------------------------------------------------------------------The Parish requires a Contractor to remove and replace existing storm drain pipes, catch basins, and driveways, to improve drainage at Dupard Street (R04D168; S39-T8-R11) in Mandeville, Louisiana, 70448.
09/21/2023 07:00 PM UTC
23-26-2
Covington Library Exterior Renovations -----Contractor must provide all labor, materials, tools, equipment, and permits for the exterior renovations for the St. Tammany Parish Library, Covington Branch.The scope includes new landscaping around the building, demolition and addition of sidewalks, subsurface drainage, removing old fence posts, and repairs to the concrete parking lot.
09/14/2023 07:00 PM UTC
23-30-1
602 Lake Superior Drive Drainage Repair------Contractor must provide all labor, materials, tools, equipment and supervision necessary to reseal interior joints of the existing 60” subsurface pipe, backfill, remove and reinstall 6’ wooden fence, and slab sodding located at 602 Lake Superior Drive (R08L047; S31-T8S-R15E) in Slidell, Louisiana. The time period for completion of the project is thirty (30) calendar days. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
08/31/2023 07:00 PM UTC
23-32-2
Hawthorne Hallow Bridge----------------------------------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for removal and replacement of existing bridge structure, installation of concrete and asphalt paving, earthwork and road base, and installation of pre-cast concrete box culvert as required per the construction drawings and specifications for Hawthorne Hallow Bridge, located at Hawthorne Hallow, Madisonville, LA
08/23/2023 07:00 PM UTC
23-29-1
Safe Haven Residence Building #2 Demolition--------The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to demolish the building structure located at 63067 Wren Way Mandeville Louisiana. The property is located on the Safe Haven Campus which was the Southeast Louisiana Hospital. The work specified in this project will require the Contract to demolish the existing building, remove all the demolition debris and any content, in addition to clearing and addition fill as required, leveling and seeding the site. All demolition activity shall follow the applicable, federal, state, and local guidelines and regulations. This project is CDBG funded through the St. Tammany Parish Government. All HUD regulations apply. The structure is approximately 1,500 sq. ft. single-story structure with an exterior brick finish. The property’s interior has wood trusses/beams. The demolition will include structure and existing foundations, slabs, roof, trusses, walls, pours material on property, and the capping of utilities except for the gas line which will be handled by St. Tammany Parish Government. Additional structures may include ancillary detached structures such as carports or sheds and will be determined for removal before the bid date. The building has asbestos, at a minimum in the roof shingles and foundation liner. The Contractor will be responsible for the transportation and disposal of the demolition debris in accordance with all applicable federal, state, and local regulations governing demolition and the demolition of structures containing hazardous substances. The Contractor will be responsible for the protection of all shrubs/trees at the site. No shrubs/trees will not be removed by the Contractor without permission by Parish Government. In addition, it shall be the responsibility of the Contractor to determine if a structure is safe enough to have its employees and or Sub-Contractors enter, before the removal of waste debris items prior to the start of demolition. All items necessary for the demolition of this structure shall be included in the lump sum quote price. No separate pay items. The Contractor will be required to have a commercial general contractor license. The Contractor shall be responsible for: 1. All mobilization, Permits, Insurance, Bonds, Materials, Labor and Equipment cost. 2. Removal of main structures and any structures located at the site address. 3. Removal of main structure foundation slab at the site address. 4. Removal of all detached structures and slabs at site address. 5. Removal of all concrete or asphalt drive ways, walk ways to street curb. 6. Cap off any and all sewer and water lines using a Louisiana Licensed plumber. 7. Disconnect and remove any and all electrical services using a Louisiana Licensed electrician. 8. Remove any and all furniture, appliances or trash that remains inside and outside the structures. 9. Remove any and all clothing or material that is remaining in the structures 10. Remove any and all material that contains lead (hazardous) paint. (Must follow all federal, state and local laws). 11. Remove any and all asbestos material such as flooring, roofing, ceiling, insulating jackets. (Must follow all federal, state and local laws). 12. The Contractor will be responsible to obtain and procure ALL Federal, State or Local Permits that may be required. 13. The Contractor will be responsible to provide river sand fill material and grade property back level to surrounding area. 14. The Contractor will be responsible to Hydro seed for 100% coverage of all disturbed areas. 15. The Contractor will be responsible for any Insurance requirements. See attached requirements in bid Documents. 16. The Contractor is responsible for Performance and Payment bonds in the amount of 100% are required on projects over $25,000. 17. Retainage will be withheld and released upon submission of a clear lien certificate. The time period for completion of work is thirty (30) days from issuance of Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
08/17/2023 07:00 PM UTC
23-27-1
Castle Drive Concrete Repairs - The Parish requires a Contractor to Remove/Replace concrete driveway panels, 4” concrete sidewalk, remove/replace mountable curb, and slab sodding located at Castle Drive (R08I068; S26-T8S-R14E) in Slidell, Louisiana.
08/15/2023 07:00 PM UTC
171 - 180 of 829 Solicitations
1 2 14 15 16 18 20 21 22 82 83