General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-5-2
Pinnacle Parkway------------------------------------------------The work specified in this project will require the contractor to provide the labor, equipment, and materials necessary to improve the roadway surface along Pinnacle Parkway (R01D020) Section 47, Township 7S Range 11E, Mandeville, LA.
04/30/2025 07:00 PM UTC
25-23-1
Solomon Dr. Sinkhole Repair----------------------------------The Parish requests a contractor to repair the sinkhole by cleaning/repairing/resealing the catch basin and interior pipe joints on Solomon Dr., Covington, LA 70433
04/30/2025 07:00 PM UTC
25-22-1
Lenwood Dr Pond & Lowe Pond Fence Repairs----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to repair existing fence and install new fence and gates, as specified along Lenwood Dr (P08IW01132); and Lowe Pond (P08AW02007) located in Slidell, Louisiana.
04/30/2025 07:00 PM UTC
25-14-2
Official Journal ----The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
05/06/2025 07:00 PM UTC
25-26-1
Lake Erie Dr Drainage -------The Parish requests a contractor to repair/replace/reseal existing structure(s) to restore area drainage by repair/replace/reseal drain pipe, catch basin, and sod, as specified along Lake Erie Dr (R08L056); located in Slidell, Louisiana.
05/06/2025 07:00 PM UTC
25-13-2
Coroner Chiller Addition--- This Project consists of the addition of one 200-ton Chiller and the furnishing and installation of new piping systems to connect to existing piping in existing building systems as shown on the drawings. The Project also consists of removing the existing and providing new Temperature Control devices as shown on drawings.
05/14/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
315-05-17-50-2
2017 Districts 6 & 5 Road Improvements.....This is a district capital road improvement project for Districts 6 & 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Firetower Rd (R06H001) Section 5 Township 7S Range 14E; St Amand St (R10C002) Section 19 Township 6S Range 12E; Sandy Ln (R04D057) Section 27 Township 7S Range 11E; and Harper Rd #2 (R06F005) Section 15 Township 7S Range 14E.
09/05/2017 07:00 PM UTC
311-00-17-52-2
2017 District 11 Road Improvements....This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Azalea Ln (R06L005) Section 33 Township 7S Range 13E ; Red Mill Rd (R07C042) Section 28 Township 8S Range 13E (Lacombe, La.).
09/05/2017 07:00 PM UTC
416-15-17-53-2
Lower W-15 Area Drainage Improvements...............................The completed Work will provide Owner with a regional stormwater detention pond known as the Tenet Pond. Additional details describing the work are provided in Section 01 11 00 of Division 01, Technical Specifications.
08/31/2017 07:00 PM UTC
015-60-17-51-2
Windshield Repair/ Replacement
08/16/2017 07:00 PM UTC
303-00-17-49-2
2017 District 3 Road Improvements.....This is a District Capital Road Improvement Project for District 3. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; and Stephanie Ln (R01B021) Section 8 Township 6S Range 10E, Covington, Louisiana.
08/01/2017 07:00 PM UTC
339-00-17-46-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
07/27/2017 07:00 PM UTC
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
07/27/2017 07:00 PM UTC
522-00-17-45-2
HVAC Controllers Upgrade... The Contractor must provide, install, program, and commission new HVAC network controllers, server and associated equipment in two (2) Parish facilities, as per the specifications.
07/20/2017 07:00 PM UTC
304-00-17-44-2
Woodridge Blvd Drainage and Canary Pine Ct Drainage.... The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, excavation and embankment on Woodridge Blvd (R04C004) Section 19 Township 8 Range 15 and Canary Pine Court (R04C006) Section 19 Township 8 Range 15.
07/18/2017 07:00 PM UTC
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
07/12/2017 07:00 PM UTC
571 - 580 of 863 Solicitations