St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
| 01/16/2025 08:00 PM UTC |
Number | Deadline |
---|---|
304-00-17-26-2
Del Oaks Drive & Roger Storme Rd Road Improvements...........This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by raising the elevation of approx. 450 lf of roadway on Del Oaks by approx. 6.5 ft, and raising the elevation of approx. 400 lf of roadway on Roger Storme by approx. 6.5 ft, work to also include removal of trees, replacement of driveway aprons, and modifications for tie-ins as specified along Del Oaks Dr (R04A047) Section 54 Township 7S Range 11E ; Roger Storme (R04A001) Section 54 Township 7S Range 11E.
| 04/25/2017 07:00 PM UTC |
300-00-17-13-2
Francis Rd Extension...............................................
Clearing and grubbing, grading, drainage structures, cold planning asphaltic concrete, class II base course, superpave asphaltic concrete overlay, asphalt concrete pavement roadway and shoulders, open channel ditches, asphaltic shared use path, striping, signing, and related work.
| 04/18/2017 07:00 PM UTC |
318-00-17-12-2
Safe Haven Renovations Quad A Asbestos Abatement ----- The abatement of ACM (floor tile, drywall walls and drywall ceilings) and the selected demolition of millwork and other building components, per the plans and specifications (Attachment “A”). All demolition activity shall follow the applicable, federal, state, and local guidelines and regulations. Contractor shall be responsible for removal, transportation and disposal of the demolition debris in accordance with all applicable federal, state and local regulations governing demolition and the demolition of structures containing hazardous substances. Project requires a Building Construction License and Hazardous Materials License.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
Contract time shall be 45 calendar days from the date of notice to proceed. All labor, supervision, materials, services, supplies, equipment, permits, transportation and disposal fees required to complete the work, per the plans and specifications (Attachment “A”), shall be included in the lump sum bid.
| 04/18/2017 07:00 PM UTC |
010-07-17-29-2
2017 Official Journal
| 04/13/2017 07:00 PM UTC |
010-01-17-25-2
SUV Chevrolet Suburban
| 04/13/2017 02:39 PM UTC |
314-00-17-21-2
2017 Districts 8, 13 & 14 Panel Replacements -
This is a District Capital Panel Replacement Project for Districts 8, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by removing and replacing various concrete panels and rollover curbs as specified along Devonshire Dr. (R08V039) Section 32 Township 6S Range 12E ; Hampton Ln (R08V042) Section 24 Township 9S Range 14E; Lake Superior Dr. (R08L047) Section 31 Township 8S Range 15E; Lake Michigan Dr. (R08L050) Section 31 Township 8S Range 15E; Montgomery Blvd (R08V044) Section 24 Township 9S Range 14E ; and Shylock Dr. (R08V059) Section 32 Township 6S Range 12E.
| 04/12/2017 07:00 PM UTC |
460-00-17-24-2
Safe Haven Handicap Day Center Rehab.......Site,Exterior and interior renovations to an existing building. Work to include, but not limited to civil, architectural, mechanical and electrical labor as indicated on construction documents.
| 04/12/2017 07:00 PM UTC |
304-00-17-19-2
2017 District 1&4 Road Improvements................This is a District Capital Road Improvement project for Districts 1 & 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and/or milling and overlaying roads as specified along Oak Park Dr. (R01I004) Section 16 Township 8S Range 10E; Perrilloux Rd (R01I001) Section 16 Township 7S Range 10E; Wager Cemetery Rd (R01I002) Section 9 Township 7S Range 10E; Black River Dr. (R01J042) Section 42 Township 7S Range 10E.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 04/11/2017 07:00 PM UTC |
318-00-17-23-2
Fairgrounds Phase 3
| 04/11/2017 07:00 PM UTC |
307-00-17-14-2
Wax Wing Canal Improvements --------------------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by grading banks to proper slope and installing armormax anchored reinforced vegetation system as specified along Wax Wing Canal (D04EW01174) Section 55 Township 8S Range 11E.
| 04/07/2017 07:00 PM UTC |